Proposal to lay 8″ dia carbon steel pipeline along NH-31 (New NH-20) from Ch. 116+450 to Ch, 120+950, LHS (Near opposite Reliance Petro| Pump to Kargil Chowk) having total length=4.5 Km, Ch.126+500 to 136+165, LHS (From Shriram Petroleum to Toll Plaza) having total length=9.665 Km & 8″ dia carbon steel pipeline crossing at Ch. 116+650 (Reliance Petrol Pump) having length=40 m, Ch. 127+300 having length=60 m, ch.128+800 having length=40 m & Ch. 131+020 having length=33 min Biharsharif of M/s Indian oil-Adani Gas Pvt. Ltd.

0
26

Home » Proposal to lay 8″ dia carbon steel pipeline along NH-31 (New NH-20) from Ch. 116+450 to Ch, 120+950, LHS (Near opposite Reliance Petro| Pump to Kargil Chowk) having total length=4.5 Km, Ch.126+500 to 136+165, LHS (From Shriram Petroleum to Toll Plaza) having total length=9.665 Km & 8″ dia carbon steel pipeline crossing at Ch. 116+650 (Reliance Petrol Pump) having length=40 m, Ch. 127+300 having length=60 m, ch.128+800 having length=40 m & Ch. 131+020 having length=33 min Biharsharif of M/s Indian oil-Adani Gas Pvt. Ltd.



Source link

SUBSCRIBE TO OUR NEWSLETTER.

Never miss out on the latest news.

We don’t spam! Read our privacy policy for more info.

RATE NOW

LEAVE A REPLY

We cannot recognize your api key. Please make sure to specify it in your website's header.

    null
     
    Please enter your comment!
    Please enter your name here