     In our view, the repair permissions granted by the BMC, would not by itself, conclusively prove that a structure existed prior to the datum line. Any permission/s granted by the BMC either for alteration or modification a structure, though it may carry a presumption regarding the existence of such structure, cannot conclusively establish that the structure existed prior to the datum line unless the same is independently substantiated by supporting documents. In our view, such a permission granted would only show the abysmal state of BMC affairs. The BMC could not have granted any such permission without ascertaining the legality of the said structure. {Para 16}

    17) In our considered view, the concerned Officers who gave such permissions are responsible and the cause of these rampant illegalities in the State. It is imperative for the Officers of the BMC to check as to whether the structure is authorized before granting any such repair permission. The failure per se cannot inure to the benefit of the wrongdoer. A permission to repair a structure, given subsequent to the datum line, cannot prove either its existence prior to datum line or it being authorised. In our view, granting reliefs to the Petitioners would only encourage the public perception that one can construct illegally and regularise the same by obtaining such permissions subsequently. It would render the entire object of the legislature to have a planned development and having the Municipal Act nugatory and otiose resulting in illegalities being confirmed and ratified by subsequent repair permissions.

    SPONSORED

    IN THE HIGH COURT OF JUDICATURE AT BOMBAY

    ORDINARY ORIGINAL CIVIL JURISDICTION

    WRIT PETITION NO.3448 OF 2023

     Siesta Industrial & Trading Corporation,  V/s. The Municipal Corporation of  Greater Mumbai, 

    CORAM : A. S. GADKARI AND KAMAL KHATA, JJ.

    PRONOUNCED ON : 29th April, 2026.

    Judgment (Per : Kamal Khata, J) :-

    Citation: 2026:BHC-OS:11078-DB

    1) By this Writ Petition under article 226 of the Constitution of

    India, the Petitioners seek to quash and set aside seven impugned Notices

    dated 22nd December, 2022, as well as seven Speaking Orders dated 10th

    March, 2023, with respect to property situated at Bharat Coal Compound,

    Bail Bazar, Kurla West, Mumbai – 400070.

    Brief facts.

    2) The Petitioner No.1 is carrying on business in partnership from

    Bharat Coal Compound on land bearing Survey No.36, Hissa No.15, Old

    C.T.S. No.66 (Part) corresponding to new C.T.S. No.704 admeasuring

    1340.70 square meters, bearing Survey No.36, Hissa No.16, C.T.S. No.66 (Part) admeasuring 432.33 square meters, aggregating to 1773.12 square

    meters, together with industrial shed admeasuring 13061 square feet on the

    ground floor of the building. The industrial shed originally consisted of 6

    industrial galas which has been assessed to Municipal taxes prior to 1962.

    The Petitioners assert that, their premises constitute a tolerated structure

    existing prior to the datum line of 1st April 1962, for non-residential

    structures, as supported by Tikka Sheets and Brihanmumbai Municipal

    Corporation (‘BMC’) assessment records.

    3) Mr. S.U. Kamdar, learned senior counsel for the Petitioners

    argues that, the assessment records bearing No.L3345(3) revealed that said

    Gala was assessed to Municipal taxes prior to 1962. He submitted that, the

    Petitioners have various documents to show their lawful use and occupation

    and possession.

    3.1) He submits that, the impugned Notices are issued at the behest

    of interested parties who were bound to convey the property to the

    Petitioners. He principally relies upon the decision of the Supreme Court in

    the case of UMC Technologies Private Limited vs. Food Corporation of India

    & Anr. reported in (2021) 2 SCC 551 to contend that, the impugned Notices

    should be adequate and set out the grounds necessitating action and the

    penalty/action proposed, should be mentioned specifically and

    unambiguously. An Order travelling beyond the bounds of Notice is

    impermissible and without jurisdiction to that extent. It is essential for the

    Notice to specify the particular grounds on the basis of which an action is

    proposed to be taken so as to enable the noticee to answer the case against

    him. If these conditions are not satisfied, the person cannot be said to have

    been granted any reasonable opportunity of being heard. Relying on this

    Judgment, he submitted that, the speaking Order was beyond the scope and

    purview of the Show Cause Notice issued under Section 351 of the Mumbai

    Municipal Corporation Act, 1888 (‘MMC Act’).

    3.2) He invited our attention to the various documents annexed to

    the Petition in support of his contention. He particularly relied upon a

    communication dated 19th January, 1993, to submit that, the said document

    was addressed by the Assistant Assessor and Collector of the BMC to the

    partner of the Petitioner No.1 which categorically stated that, the property

    bearing No.L3345(3) has been assessed to Municipal taxes since 1st April,

    1962. He also invited our attention to the Assessment bill dated 29th

    December 2012 and particularly to the date 1st April, 1962 in the row

    immediately after the address of the Petitioner with a description first

    Assessment date being 1st April, 1962.

    3.3) He also drew our attention to the communication addressed by

    the BMC dated 26th October, 1993 granting them repair permission to the

    said structure, whereby the Petitioner was permitted to construct the

    mezzanine floor. He further heavily relied upon the IOD granted by the

    BMC to another structure in the said compound which was dated 17th

    February, 1971. Relying upon the calculations made therein he submitted

    that, the fact that the area of the Petitioners’ plot was reduced to determine

    the FSI and constructed area available to them would indicate that, their

    structure existed prior to the datum line. He accordingly submitted that, the

    Petitioners would be gravely prejudiced if the prayers in the Petition were

    declined.

    4) Per contra, Mr. Shailesh Shah, learned senior counsel

    appearing for Respondents-Corporation relied upon the Affidavit of Mr.

    Sanjay Mallinath Dudhbhate dated 24th July, 2023. He submitted that, the

    Tikka Sheets, relied upon by the Petitioners, clearly reveal that, there were

    no structures on the said plot of land prior to the datum line.

    4.1) He submitted that, the Petitioners heavily relied upon a layout

    plan of the entire plot in support of their contentions. The said layout plan

    itself showed structures thereon marked in hatched lines and the empty

    plots with dotted line boundaries. The Petitioners’ plot was clearly an empty

    plot with dotted line boundary. Therefore, the claim of the Petitioner that

    structure existed prior to datum line was baseless and unfounded.

    Moreover, the City Survey Department had prepared MR plan which

    showed the notice structure in a red hatch which indicated structures

    erected at a later point in time than the datum line. In that view of the

    matter, he submitted that, the Petition deserves to be rejected.

    Analysis and Conclusion:

    5) This is yet another case which highlights the two classes of

    citizens which approach the Court. First, those who scrupulously follow the

    law and second, those who blatantly violate it and thereafter raise spacious

    pleas to justify their actions. The present case pertains to the later category.

    6) Upon carefully examining the documents on record, we posed

    a query to Mr. Kamdar as to whether he had any documents other than the

    Tikka Sheet and assessment bill, that would prove the existence of a

    structure prior to the datum line. He promptly submitted that there were

    several other supporting documents to suggest and prove the existence of

    the Petitioners’ structure prior to the datum line. According to us, there

    were no other documents on record to clearly prove that a structure existed

    on the plot prior to the datum line, leave aside the exact constructed area.

    7) A bare perusal of the notices indicates that, the entire structure

    viz. the shed comprising of ground and mezzanine is illegal. The impugned

    orders elaborately state as to why the structures are held to be illegal and

    deserve to be demolished.

    8) A careful perusal of the impugned orders clearly indicates that,

    they are well reasoned and have duly considered the documents as well as

    the contentions of the Petitioners. The impugned orders are certainly not

    lacking reasons or perverse.

    9) In our view, an unauthorized structure cannot be tolerated or

    protected and is liable to be demolished. It is settled law that, illegality is incurable.

    10) The Apex Court in its Judgment in the case of Shanti Sports

    Club vs. Union of India reported in (2009) 15 SCC 705, has observed that over the last four decades, almost all cities, big or small, have seen unplanned growth. The menace of illegal and unauthorized constructions and encroachments have acquired monstrous proportions and everyone has been paying a heavy price for the same. The Courts have consistently upheld the principle that, unauthorized constructions and illegal structures must be removed, irrespective of the identity of the occupants. In a recent

    decision, the Hon’ble Supreme Court in the case of Rajendra Kumar

    Barjatya vs. U.P. Avas Evam Vikas Parsihad & Ors. reported in 2024 SCC

    OnLine SC 3767, reiterated the dictum “illegality is incurable”, in paragraph

    No.20, has held as under :-

    “20. In the ultimate analysis, we are of the opinion that

    construction(s) put up in violation of or deviation from the

    building plan approved by the local authority and the

    constructions which are audaciously put up without any

    building planning approval, cannot be encouraged. Each and

    every construction must be made scrupulously following and

    strictly adhering to the Rules. In the event of any violation

    being brought to the notice of the Courts, it has to be curtailed

    with iron hands and any lenience afforded to them would

    amount to showing misplaced sympathy. Delay in directing

    rectification of illegalities, administrative failure, regulatory

    inefficiency, cost of construction and investment, negligence

    and laxity on the part of the authorities concerned in

    performing their obligation(s) under the Act, cannot be used

    as a shield to defend action taken against the

    illegal/unauthorized constructions. That apart, the State

    Governments often seek to enrich themselves through the

    process of regularisation by condoning/ratifying the violations

    and illegalities. The State is unmindful that this gain is

    insignificant compared to the long-term damage it causes to

    the orderly urban development and irreversible adverse

    impact on the environment. Hence, regularization schemes

    must be brought out only in exceptional circumstances and as

    a onetime measure for residential houses after a detailed

    survey and considering the nature of land, fertility, usage,

    impact on the environment, availability and distribution of

    resources, proximity to water bodies/rivers and larger public

    interest. Unauthorised constructions, apart from posing a

    threat to the life of the occupants and the citizens living

    nearby, also have an effect on resources like electricity, ground

    water and access to roads, which are primarily designed to be

    made available in orderly development and authorized

    activities. Master plan or the zonal development cannot be

    just individual centric but also must be devised keeping in

    mind the larger interest of the public and the environment.

    Unless the administration is streamlined and the persons

    entrusted with the implementation of the act are held

    accountable for their failure in performing statutory

    obligations, violations of this nature would go unchecked and

    become more rampant. If the officials are let scot-free, they

    will be emboldened and would continue to turn a nelson’s eye

    to all the illegalities resulting in derailment of all planned

    projects and pollution, disorderly traffic, security risks, etc.”

    10.1) The Hon’ble Supreme Court in case of Kaniz Ahmed Vs.

    Sabuddin and Ors., reported in 2025 SCC OnLine SC 995, in paragraph

    No.7 has held as under:

    “7. Thus, the Courts must adopt a strict approach while

    dealing with cases of illegal construction and should not

    readily engage themselves in judicial regularisation of

    buildings erected without requisite permissions of the

    competent authority. The need for maintaining such a firm

    stance emanates not only from inviolable duty cast upon the

    Courts to uphold the rule of law, rather such judicial restraint

    gains more force in order to facilitate the well-being of all

    concerned. The law ought not to come to rescue of those who

    flout its rigours as allowing the same might result in

    flourishing the culture of impunity. Put otherwise, if the law

    were to protect the ones who endeavour to disregard it, the

    same would lead to undermine the deterrent effect of laws,

    which is the cornerstone of a just and orderly society.[See:

    Ashok Malhotra v. Municipal Corporation of Delhi, W.P. (c) No.

    10233 of 2024 (Delhi High Court)]”

    11) In our view, the Tikka Sheet relied upon by the Petitioners does

    not support them, but on the contrary, supports the case of the BMC – that no structure existed prior to the datum line. The Petitioners have no explanation as to why their plot did not indicate any structure with hatched lines and only showed the plot boundary that with dotted lines to indicate

    their plot. None of the other documents relied upon by the Petitioners show

    the dimensions of the structure prior to the datum line.

    12) In view of the above, we are unable to accept the contention of

    Mr. Kamdar that production of an assessment invoice or receipt, by itself,

    would mean that both land and building were assessed. The assessment

    sheet produced does not record that land and building were assessed.

    13) The reliance placed by Mr. Kamdar on the IOD issued to the

    adjacent plot owner particularly the calculations shown therein for

    evaluating the FSI available to the owners of that plot cannot be a proof of

    existence of a structure on the said plot. It may well be a calculation based

    on the entitlement to build on the said plot. The contention that the area

    shown in the calculation would conclusively prove the existence of a

    structure is an unacceptable proposition.

    14) In our view, the contents of IOD granted for an adjoining plot,

    by itself does not prove the existence of a structure on the Petitioners plot.

    The submission of Mr. Kamdar is only a presumption and not based on any

    direct evidence of existence of the said structure. The Petitioners have failed

    to produce any document that would show that a structure admeasuring a

    certain area existed on the plot prior to the datum line.

    15) The communication addressed by the BMC on 19th January,

    1993, relied upon by the Petitioners, is a document issued by the Assistant

    Assessor and Collector on 15th January, 1993. It categorically records that

    the Municipal taxes levied on the property was without reference to the

    details of the property under reference. This would indicate that, the said

    document by itself is not conclusive evidence that the property was assessed

    for land alone or alongwith the structure.

    16) In our view, the repair permissions granted by the BMC, would not by itself, conclusively prove that a structure existed prior to the datum line. Any permission/s granted by the BMC either for alteration or modification a structure, though it may carry a presumption regarding the existence of such structure, cannot conclusively establish that the structure existed prior to the datum line unless the same is independently substantiated by supporting documents. In our view, such a permission granted would only show the abysmal state of BMC affairs. The BMC could not have granted any such permission without ascertaining the legality of the said structure.

    17) In our considered view, the concerned Officers who gave such

    permissions are responsible and the cause of these rampant illegalities in the State. It is imperative for the Officers of the BMC to check as to whether the structure is authorized before granting any such repair permission. The failure per se cannot inure to the benefit of the wrongdoer. A permission to repair a structure, given subsequent to the datum line, cannot prove either its existence prior to datum line or it being authorised. In our view, granting reliefs to the Petitioners would only encourage the public perception that

    one can construct illegally and regularise the same by obtaining such

    permissions subsequently. It would render the entire object of the

    legislature to have a planned development and having the Municipal Act nugatory and otiose resulting in illegalities being confirmed and ratified by subsequent repair permissions.

    18) In view of the above, the Petition is dismissed.

    19) In view of disposal of the Writ Petition, the Interim Application

    (L) No.5806 of 2026 does not survive and is also disposed off.

    (KAMAL KHATA, J.) (A.S. GADKARI, J.)

    20) At this stage, learned counsel for the Petitioners submitted

    that, there is an ad-interim relief in favour of the Petitioners since 19th April,

    2023, and it may be extended for a period of four weeks from today to

    enable the Petitioners to test correctness of this Judgment before the

    Hon’ble Supreme Court.

    21) Mr. Shah, learned counsel for the BMC opposed the said

    request.

    22) In view of the facts mentioned hereinabove and after recording

    the evidence that, the suit structure is palpably illegal, we are not inclined to entertain such a request. The said request is accordingly rejected.