        PIL No.1/2026
                                                 Date of order: 17.04.2026
        Shri Pynskhemlang Sohtun                             ..... Petitioner
    
                                       Vs.
        1. State of Meghalaya, through the Chief Secretary, Shillong.
        2. Deputy Commissioner, Ri-Bhoi District, Meghalaya.
        3. General Manager (Projects), NHIDCL, Shillong.
        4. Union of India, through Ministry of Environment, Forest &
           Climate Change, New Delhi.
        5. Union of India, through Ministry of Road Transport & Highways
        Coram:
              Hon'ble Mrs. Justice Revati Mohite Dere, Chief Justice
              Hon'ble Mr. Justice W. Diengdoh, Judge
    
        For the Petitioner   :    Ms. P. Bhattacharjee, Adv with
                                  Mr. F. Bareh, Adv
        For the Respondents :    Mr. A. Kumar, Advocate General with
                                 Mr. N.D. Chullai, AAG
                                 Mr. A.H. Kharwanlang, Addl.Sr.GA
                                 Dr. N. Mozika, DSGI with
                                 Ms. K. Gurung, Adv
        i)    Whether approved for reporting in      Yes/No
              Law journals etc.:
    
    
        ii)   Whether approved for publication
              in press:                                 Yes/No
    
    
    
    
                                                                  Page 1 of 27
                                                             2026:MLHC:371-DB
    
    
    
    
    JUDGMENT:

    (per the Hon’ble, the Chief Justice) (Oral)

    Heard learned counsel for the respective parties.

    SPONSORED

    2. By this petition, the petitioner seeks the following reliefs:

    (a) a direction to the respondents to halt all acquisition,

    survey and preparatory activities in Ri-Bhoi District;

    (b) direct disclosure of EIA, SIA Hydrological and alternative

    alignment studies;

    (c) direct meaningful public consultation in compliance

    with Forest Rights Act and Sixth Schedule;

    (d) Direct examination of less destructive alternatives; and

    (e) Constitute an independent expert committee.

    3. The grievance of the petitioner in the aforesaid PIL is with

    respect to the proposed construction of 166.8 km

    Greenfield/High-Speed Highway Corridor of which approximately

    144.8 km lies within Meghalaya, primarily Ri-Bhoi District.

    According to the learned counsel for the petitioner, Ri-Bhoi

    District forms part of a fragile and undulating hill ecosystem

    which is highly susceptible to landslides, soil erosion,

    Page 2 of 27
    2026:MLHC:371-DB

    deforestation and depletion of groundwater resources. The

    petitioner has alleged in the said PIL that past experience with the

    National Highways and Infrastructure Development Corporation

    Limited (hereinafter referred to as “NHIDCL”) projects, particularly

    the Shillong-Dawki Highway demonstrates severe hill cutting,

    ecological destabilisation, recurring landslides, prolonged delays

    and loss of human lives, thereby giving rise to legitimate public

    apprehension regarding environmental and public safety. It is

    further alleged by the petitioner that the proposed alignment

    passes through agricultural lands, community owned tribal

    lands, forests, water catchment areas and culturally sensitive

    landscapes governed under the Sixth Schedule. It is further

    stated in the PIL that Ri-Bhoi District forms part of a fragile hill

    ecosystem prone to landslides and ecological instability.

    According to the petitioner, the alignment passes through the

    close vicinity of Lum Sohpetbneng, revered by the Khasi

    community as a sacred site of immense spiritual, religious,

    historical and cultural significance, traditionally regarded as the

    origin point of humanity.

    Page 3 of 27

    2026:MLHC:371-DB

    4. This Court vide order dated 19th February, 2026 had issued

    notice to the respondents. This Court had also directed the

    respondents to file their respective responses with respect to what

    was stated in the PIL. Pursuant thereto, Mr. Mahavir Singh

    Rawat, General Manager (LA & Coord.), National Highway and

    Infrastructure Development Corporation Limited, Regional Office,

    Shillong has filed his affidavit on behalf of respondent Nos.3 and

    5 dated 9th April, 2026. In the said affidavit, the affiant has stated

    that the NHIDCL under the Ministry of Road, Transport and

    Highways (MoRTH), Government of India has been given a

    mandate to develop/improve the National highways and other

    related road infrastructure projects in the State of Meghalaya for

    accelerated development of North-East Region of India. It is

    further stated that the Cabinet Committee on Economic Affairs

    (CCEA) on 23rd May, 2025 has approved the investment for

    development of Greenfield High-Speed Corridor (HSC) of 166.80

    km (NH-06) from Mawlyngkhung (near Shillong) in Meghalaya to

    Panchgram (near Silchar) in Assam on Hybrid Annuity Mode

    (HAM), at a total capital cost of ₹22,864,00 crores. In the affidavit,

    the importance and key benefits of the Greenfield High-Speed

    Page 4 of 27
    2026:MLHC:371-DB

    Corridor project is stated i.e., it will serve as the key economic

    corridor being the most critical link of the network; that it would

    boost the connectivity in the North-East Region; that it would

    ensure efficient and faster movement of goods, thereby

    improvement in logistic efficiency in the North-East; that it would

    be of significant strategic and defence importance for the North-

    Eastern Region of India which has borders with neighbouring

    countries like China, Bangladesh and Myanmar; that it would

    help reduction in carbon emission as positive environment

    impact, etc.

    5. It is further stated that the said project is located within

    100 km of the international border and as such is exempt from

    the requirement of prior environmental clearance but is subject to

    compliance with other applicable environmental standards. To

    the affidavit are annexed copies of the notification dated 14th

    July, 2022 and Office Memorandum dated 6th February, 2023. It

    is further stated by the affiant in the affidavit that the DPR

    incorporates a comprehensive environment management plan

    addressing baseline environment assessment, identification of

    environmentally sensitive receptors, impact prediction and

    Page 5 of 27
    2026:MLHC:371-DB

    mitigation measures and that adequate design provisions have

    been incorporated to ensure that natural drainage patterns and

    environment safeguards are maintained. The key provisions

    include, 599 culverts; 79 minor bridges; 13 major bridges and

    171 viaducts. It is further stated that additional measures

    including, longitudinal drains, catch water drains, chute drains

    with energy dissipation arrangements, sediment control measures

    such as silt fencing could be done to prevent discharge of

    construction waste into natural waterbodies. It is further stated

    that wherever forest land is involved, the same has been identified

    during DPR preparation through alignment surveys and field

    verification. It is further stated that approvals under the Forest

    (Conversation) Act, 1980 including, Stage-I and Stage-II

    clearances, will be obtained from the competent authority prior to

    commencement of construction in stretches involving forest land

    and that compensatory afforestation will be undertaken in

    accordance with existing MoEF&CC guidelines; that necessary

    financial provisions have been included in the DPR; and that

    compliances with respect to the Scheduled Tribes and Other

    Page 6 of 27
    2026:MLHC:371-DB

    Traditional Forest Dwellers (Recognition of Forest Rights) Act,

    2006, will be followed as per statutory provisions.

    6. It is further stated in the affidavit that the DPR

    incorporates detailed hydrological analysis to ensure that natural

    drainage patterns are preserved and that no obstruction is

    caused to existing water bodies or natural streams; that

    hydrological design has been undertaken in accordance with

    Indian Roads Congress guidelines to ensure uninterrupted

    natural flow regimes; and that additional environmental

    safeguards which include, erosion control measures, slope

    stabilization works, sediment control structures, drainage

    management system etc. would be complied with. It is stated that

    the total financial allocation for drainage and hydrological

    protection measures exceeds ₹6,900.00 crores (as per PPPAC)

    under the project provisions.

    7. It is further stated that the alignment has been reviewed

    during DPR preparation stage to avoid direct impact on culturally

    significant locations and that based on available alignment

    records and mapping, the core sacred area of Lum Sohpetbneng

    Page 7 of 27
    2026:MLHC:371-DB

    is kept outside the proposed land acquisition and is outside the

    direct impact area of the project. It is further stated that wherever

    culturally sensitive areas fall within the broader influence zone of

    the corridor, mitigation measures such as alignment optimization,

    controlled slope cutting and slope stabilization measures have

    been incorporated and that stakeholder consultations were

    undertaken during the planning stage with local authorities and

    other stakeholders to consider cultural sensitivities. It is further

    stated in the affidavit that design measures include, flexible

    Right-of-Way planning, retaining structures, toe walls, controlled

    earthwork operations in sensitive stretches.

    8. It is further stated that environmental sensitivity and

    ecological considerations have been adequately incorporated into

    the DPR design and wherever applicable, the project provides

    mitigation measures such as wildlife crossings through culverts

    and underpass structures, viaduct sections to facilitate cross

    movement of animals, minimizing disturbance to natural terrain

    and environment safeguards to reduce noise and light impacts. It

    is further stated that bio-engineering techniques and slope

    stabilization measures have also been proposed to minimize

    Page 8 of 27
    2026:MLHC:371-DB

    ecological disturbance. According to the affidavit, the DPR

    prescribes environment safeguards to be implemented during

    construction stage and includes, designated construction camps

    with sanitation and waste management systems; regulation of

    construction material sourcing; prohibition of unauthorised

    quarrying and tree cutting; environmentally safe muck disposal

    locations; and erosion protection through turfing, geotextiles,

    retaining walls, specialised slope stabilization measures etc.

    9. It also appears from the affidavit that the DPR includes,

    detailed mapping of existing utilities to ensure controlled

    construction practices so as to avoid environmental damages. The

    utility crossings identified are electrical transmission lines; water

    pipelines (all crossings); and gas pipelines. It is stated that utility

    shifting plans have been prepared to ensure safe relocation

    without disruption to environmental or public infrastructure.

    10. It is further stated in the affidavit that the DPR

    incorporates comprehensive environment, ecological and cultural

    safeguards for protection of natural waterbodies, wildlife habitats

    and culturally sites and the same have been integrated into the

    Page 9 of 27
    2026:MLHC:371-DB

    planning and engineering designing of the said corridor. In the

    affidavit it is categorically stated that all statutory requirements

    relating to environment clearance exemption, forest clearance,

    environmental safeguards and protection of cultural heritage will

    be strictly adhered to and complied with in accordance with

    applicable laws and guidelines.

    11. The Office Memorandum, which the authorities are

    required to follow is dated 6th February, 2023, which is annexed

    to the affidavit as Annexure-2. The said Office Memorandum

    reads thus:

    “F. No. IA3-22/40/2022-IA.III [E198668]
    Government of India
    Ministry of Environment, Forests and Climate Change
    (IA-III Section)
    Indira Paryavaran Bhawan,
    Jor Bag Road, Aliganj,
    New Delhi – 110003
    Dated: 6th February, 2023

    OFFICE MEMORANDUM

    Subject: Standard Operating Procedure (SoP) for
    Environmental safeguards to be followed while
    constructing and operation of all Highway
    projects which are exempted up to 100 km from
    line of control or border – reg.

    Page 10 of 27

    2026:MLHC:371-DB

    The Ministry has issued a Notification vide S.O. 3194(E)
    dated 14th July 2022 exempting the requirement of EC for All
    Highway projects are exempted up to 100 km from line of
    control or border subject to compliance of Standard Operating
    Procedure notified in this regard from time to time. The
    Guidelines are to be followed for all roads/highway projects
    falling within 100 Km from the International Border/Line of
    Control (LOC) for sustainable environmental safeguards.

    2. Further, the exemption of prior EC for all Highway
    projects up to 100 km from line of control or border does not
    exempt it from approvals/consent/permissions etc., required to
    be obtained under any other Act/Rule/Regulation/Bye-
    laws/Notification etc.

    3. The Ministry hereby directs that the following
    environmental safeguards shall be followed while constructing
    and operation of all Highway projects which are exempted up to
    100 km from line of control or border.

    A. Risk assessment, Landslide management plan and
    Disaster Management Plan

    i. Risk assessment shall be carried out and based on the
    assessment, Disaster Management Plan as per the Disaster
    Management Act
    shall be got approved from Competent
    Authority and implemented.

    ii. If the proposed route is passing through any hilly area,
    comprehensive study on vulnerability for the landslide,
    slope stability, vulnerability of the project area from the
    point of view of seismic activity taking into account the
    seismic zone in which it is located, eco-fragility study of the
    area shall be carried out through reputed Technical
    Institute on the basis of which environmental friendly and
    safe construction methodology shall be adopted.
    iii. Landslide management plan shall be prepared and all
    remedial, precautionary measures before, during and post
    construction shall be undertaken to ensure that all

    Page 11 of 27
    2026:MLHC:371-DB

    environmental safeguards are mandatorily implemented
    under the supervision of subject matter experts before
    undertaking construction. In case of cutting or
    embankment, control of soil erosion from embankment,
    landslide, rock fall protection measures, etc. shall be carried
    out.

    B. Tunneling and Horizontal Directional Drilling

    i. If the proposed route involves tunneling and/ or horizontal
    directional drilling, a detailed study on tunneling and
    locations of tunneling with geological structural fraction
    and its possible impact on the existing structures in its
    vicinity, flora, fauna, terrain, etc. should be carried out so
    as to ensure that there is no damage to life, property and
    environment in its vicinity.

    ii. Quarry areas shall be barricaded during quarrying
    operations. Adequate environmental safeguards should be
    put in place to ensure that environment protection is not
    compromised. The abandoned quarry shall be
    rehabilitated/reclaimed as water reservoirs with proper
    fencing around quarry area as practically possible.

    C. Soil conservation measures and muck dumping plan

    i. Construction waste including bituminous material and
    other hazardous materials must not be allowed to
    contaminate water courses and the dump sites for such
    materials must be secured so that they shall not leach into
    the ground water. The non-usable bitumen waste/ spoils
    shall be disposed of in an environmentally sound manner by
    digging deep trench and providing clay lining at the bottom
    and filled with soil at the top (for at least 0.5m).

    
    
    
    
                                                                  Page 12 of 27
                                                   2026:MLHC:371-DB
    
    
    
    
    D.    Noise management
    i.     Base line ambient noise level survey shall be carried out
    

    prior to start of construction as per the CPCB guidelines.
    The ambient noise levels should conform to the standards
    prescribed under Noise Pollution (Regulation and Control)
    Rules, 2000.

    ii. Noise reduction measures and traffic management
    strategies to be deployed for reducing the adverse impact if
    any.

    E.    Air Pollution Control
    i.      The baseline ambient air quality monitoring shall be
    

    carried out as per the notification issued on 16th
    November, 2009. Appropriate Air Pollution control
    measures shall be in place during transportation of the
    construction materials.

    F. Water management

    i. A comprehensive assessment of water catchment,
    hydrology and drainage pattern within 10km of the
    alignment shall be carried out. No diversion of the
    natural course of the river/creek shall be made. All the
    major, minor bridges and culverts should not affect the
    drainage systems. Flood plains of the rivers/ drainage
    systems are not to be disturbed. Rain water harvesting
    structures to be constructed at the either sides of the
    road.

    ii. In case the road passes through a flood plain of a river,
    the detail assessment of micro drainage, flood passages
    and information on flood periodicity should be carried out
    and a management plan shall be prepared and
    implemented.

    Page 13 of 27

    2026:MLHC:371-DB

    iii. Appropriate measures must be taken while undertaking
    digging activities to avoid any likely degradation of water
    quality.

    G. Traffic management

    i. The proponent shall carry out a detailed traffic study to
    assess inflow of traffic from adjoining areas like
    airport/urban cities. The detailed traffic planning studies
    shall include complete design, drawings and traffic
    circulation plans (taking into consideration integration
    with proposed alignment and other state roads etc.).
    Wherever required adequate connectivity in terms of VUP
    (vehicle underpass)/ PUP (Pedestrian underpass) needs to
    be included.

    ii. Traffic Control Devices/Road Safety Devices/ including
    various types of cautionary, informatory, regulatory as
    mandatory signboards, road markers, studs, etc. shall be
    provided at appropriate locations all along the project
    stretch in accordance with the specifications laid down in
    Manual of Specifications and Standards for Expressways
    (IRC: SP:99-2013) and IRC:8, IRC:25, IRC:26, IRC:35,
    IRC:67, IRC:79, IRC:103 and Section 800 of MORTH
    Specifications.

    H.     Avenue plantation/Green Belt
    
    i.     Necessary green belt shall be provided on both sides of the
    

    highway with proper central verge and cost provision
    should be made for regular maintenance. Green belt shall
    be developed with a native tree species in accordance with
    CPCB guidelines.

    ii. Old, large and heritage value trees should be retained
    based on girth and age regulations as may be prescribed

    Page 14 of 27
    2026:MLHC:371-DB

    by the Forest Department. Where the trees need to be cut/
    trans planted with prior permission from the concerned
    local Authority, compensatory plantation for the forest
    land in the ratio of 1:10 (i.e. planting of 10 trees for every
    1 tree that is cut/non- survival of any transplanted tree)
    shall be done and maintained as per the extant norms
    of State Govt./Central Govt. Plantations to be ensured
    species (cut) to species (planted).

    iii. The plantation activity be geo-tagged, before and after
    pictures be taken with geo tags and having date and
    time stamps to ensure maximum survival of the planted
    species. Periodical monitoring be carried out and survival
    percentage of the plantation should form the basis of
    making payments for such plantation.

    I. Budgetary provisions

    i. Requisite funds shall be earmarked towards capital cost
    and recurring cost/annum for environment pollution
    control measures. An implementation schedule shall be
    prepared and implemented as per the timeline.
    ii. Adequate provision for infrastructural facilities including
    water supply, fuel and sanitation shall be ensured for
    construction workers during the construction phase of the
    project in order to avoid any damage to the environment.

    J. Monitoring Provision

    i. The State Pollution Control Board/Pollution Control
    Committees shall obtain the relevant EIA/EMP study
    carried out by the Project Proponent through any NABET
    accredited Consultant in accordance with the instant
    SOP and shall upload the same on their website at the
    time of grant of CTE (Consent to Establish).

    Page 15 of 27

    2026:MLHC:371-DB

    ii. The concerned State Pollution Control Boards/Pollution
    Control Committees shall carry out periodic monitoring
    before, during, and after construction to ensure that the
    necessary environmental safeguards have been put in place
    as per the aforesaid EIA/EMP study.

    iii. Besides above, the Project Proponent shall also upload the
    information regarding the progress of construction on
    company’s website in the format prescribed by the State
    Pollution Control Board so as to ensure that the necessary
    general and specific conditions related to construction and
    prevention as well as mitigation of environmental
    pollution as prescribed by the Institute of Repute are
    being complied with.

    Besides above, the Project Authority shall obtain other
    statutory clearances, wherever applicable. The following are
    list of some requisite clearances for guidance, but not
    limited to, which may be applicable to such road projects:

    i.     Indian Road Congress (IRC) guidelines.
    ii.    Forest clearance under Forest Conservation Act, 1980 and
    

    CRZ clearance as per CRZ Notification 2011/ 2019.
    iii. If the project is passing through/located within the
    notified ecologically sensitive zone (ESZ) around a notified
    National Park/Wildlife Sanctuary or in the absence of
    notified ESZ, within 10 km from the boundary of notified
    National Park/ Wildlife Sanctuary, the project proponent
    may simultaneously apply for the clearance from the
    standing committee of NBWL.

    iv. Provisions for management of construction and demolition
    activities related thereto as contained in Construction and
    Demolition Waste Management Rules, 2016.
    v. The project affected people shall be rehabilitated in
    accordance with the Resettlement & Rehabilitation plans
    approved by the concerned competent authority.

    Page 16 of 27

    2026:MLHC:371-DB

    vi. This is issued with the approval of the Competent
    Authority.

    Sd/-

    (Sundar Ramanathan)
    Scientist ‘E’ ”

    12. The affiant has denied the statements and averments made

    in paragraphs 11 and 13 of the writ petition that the acquisition

    of land for the project is being carried out under the provisions of

    National Highways Act, 1956. It is stated that the competent

    authority for the land acquisition under the Act is the

    Collector/Deputy Commissioner of the respective district and that

    the District Collector/competent authority Ri-Bhoi District has

    carried out extensive public consultation meeting with village

    headmen of the affected areas on 11th December 2024; that in the

    public consultation meeting, certain issues were raised by the

    village headmen and stakeholders, especially with regard to the

    proposed alignment in certain areas as the proposed alignment

    passed through village water sources, paddy fields and

    agricultural lands. It is stated that the issues and objections

    raised by the stakeholders were given proper consideration and

    the alignment was shifted ensuring the village water sources are

    not affected and paddy fields are minimally affected. Further

    Page 17 of 27
    2026:MLHC:371-DB

    according to the affiant, another public consultation meeting was

    held with all the headmen of the affected villages on 25th

    February, 2025 on the modified alignment in which the village

    headmen and other stakeholders expressed their satisfaction for

    the proposed Greenfield High-Speed Corridor. To the affidavit, is

    annexed the minutes of the meeting held on 25th February, 2025.

    13. The relevant part of the minutes of the meeting dated 25th

    February, 2025, which is at Annexure-3 at page 26, reads thus:

    “The Chairman highlighted the agenda of the meeting and
    informed the members present that after due consideration in
    addressing the concern raised by the Headmen of sense villages
    on the 11 December, 2024 for shifting the alignment from major
    water source and paddy field, the National Highways &
    Infrastructure Development Corporation Limited (NHIDCL) has
    prepared the final alignment (Greenfield Project Alignment)

    The Chairman then handed over the time to the
    representative from NHIDCL for the presentation of the
    alignment.

    1. The representative from NHIDCL presented the alignment
    through power point village wise keeping in view of the
    changes made through request and site inspection in
    considering for shifting of the alignment on critical
    locations like water source, churches, cemetery, paddy field
    etc. It was informed that reservations of villagers as
    expressed in earlier public consultation meeting, the
    alignment had been revised and paddy fields, water sources
    have been avoided from coming under PRoW of the
    alignment of the proposed High-Speed Corridor.

    Page 18 of 27

    2026:MLHC:371-DB

    2. Representatives of NHIDCL further informed that due care
    will be taken during construction to ensure damage to
    natural water sources and suitable directions will be issued
    to Contractor once appointed.

    3. During the presentation, some changes have been made to
    the alignment at certain critical locations.

    In view of the above deliberations held, the village headmen
    and village committee representatives expressed their satisfaction
    for the new proposed Greenfield alignment High Speed Corridor

    The representative from NHIDCI informed the Chairman that
    they will be conducting the Geotechnical survey at certain
    location along the new proposed alignment for the construction of
    bridges and request the Chairman to kindly instruct the village
    headmen to cooperate and allow the team in conducting the
    survey.”

    14. In paragraph 7 of the affidavit, the affiant has denied the

    averments made in paragraphs 12 and 14 of the petition and has

    stated that the High-Speed Corridor project and the Shillong-

    Dawki project are two different projects in different districts with

    different and distinct terrain and topography; that the DPR of the

    High-Speed Corridor has taken into account adequate measures

    for fragile hill ecosystem prone to landslides and ecological

    concerns based on expert advice of National Institute of Rock

    Mechanics (NIRM), Bengaluru, were being engaged as expert in

    High-Speed Corridor project for this specific purpose. Further, it

    Page 19 of 27
    2026:MLHC:371-DB

    is categorically stated in paragraph 8 of the affidavit that all

    aspects of the project have been studied and considered in the

    DPR.

    15. It is further categorically stated in paragraph 15 that based

    on available alignment, records and mapping, the core sacred

    area of Lum Sohpetbneng falls outside the proposed land

    acquisition and also outside the direct impact area of the project

    and that the stakeholder consultations were also undertaken

    during the planning stage with local authorities and stakeholders

    to consider cultural sensitivities.

    16. In paragraph 19, the affiant has denied the averments

    made in paragraphs 20(G) and 20(H) of the petition and stated

    that the study to compare the available alternatives and deciding

    on the best and optimal option with minimum social,

    environment and financial impact is part of the DPR process and

    that the said study has been carried out by the DPR consultant

    with presentations given to the State Government officials and

    after conducting public consultations organised by the district

    administration.

    Page 20 of 27

    2026:MLHC:371-DB

    17. Dr. N. Mozika, learned DSGI on instruction states that the

    Office Memorandum and whatever is stated in the affidavit will be

    followed in right earnest without any infraction. Statement

    accepted.

    18. He further states that as per the SOP dated 6th February,

    2023, in particular A i.e. risk assessment, landslide management

    plan and disaster management plan, (i) and (ii), will be strictly

    complied along with other SOPs. Statement accepted.

    19. On behalf of the respondent Nos.1 and 2 i.e., State of

    Meghalaya, an affidavit has been filed by Shri Abhilash Baranwal,

    IAS, Deputy Commissioner, Ri-Bhoi District, Government of

    Meghalaya. The affiant in the said affidavit has stated that the

    proposed project is a centrally approved infrastructure project

    which envisages the construction of a four-lane highway corridor

    running through 18 villages in Ri-Bhoi district i.e., from Pyllun

    village to Lumsohphoh village. The proposed project aims to

    enhance the connectivity between Shillong, Guwahati and Silchar

    and reduce travel time between the same, thereby boosting trade,

    tourism and economic integration.

    Page 21 of 27

    2026:MLHC:371-DB

    20. In paragraph 15 of the affidavit, the affiant has stated that

    the State has duly consulted with the village headmen and

    Dorbar Shnongs to allay and address the concerns raised by

    them; and that joint measurement surveys were being conducted

    and village headman as well as village committee representatives

    have been included as key participants for the purpose of

    verification, demarcation and recording of land boundaries. It is

    further stated that the Dorbar Shnongs are duly consulted for the

    purpose of greater community acceptance, reinforcing the

    legitimacy of the survey outcomes (to the affidavit is annexed the

    minutes of the meeting dated 25th February, 2025).

    21. In paragraphs 16 of the affidavit, the affiant has further

    stated that preliminary steps such as surveys and alignments

    finalisation are standard preparatory activities undertaken by the

    government towards demarcation of the boundary of land under

    the National Highways Act, 1956; and that these preliminary

    steps do not constitute final land acquisition or diversion,

    towards which due process as laid down in the statute are being

    followed and that all the stakeholders are being given the

    Page 22 of 27
    2026:MLHC:371-DB

    opportunity to raise their objections. It is further stated that the

    objections raised by the stakeholders are resolved by the

    competent authority by giving opportunity of hearing and making

    such further inquiry as required under Section 3C of the National

    Highways Act, 1956. It is further in paragraph 16 stated as

    under:

    “16. That it is submitted that preliminary steps such as
    surveys and alignment finalization are standard
    preparatory activities undertaken by the government
    towards demarcation of the boundary of land under
    National Highways Act, 1956. It is submitted that these
    preliminary steps do not constitute final land acquisition or
    diversion, towards which due processes as laid down in the
    statute are being followed and all the stakeholders are
    being given the opportunity to raise their objections. It is
    submitted that the objections raised by the stakeholders
    are resolved by the competent authority through due
    process of giving opportunity of hearing and making such
    further inquiry as required under Section 3C of the
    National Highways Act, 1956.”

    22. It is categorically stated in paragraph 17 of the said

    affidavit that as far as the issue of proximity of proposal project

    with the sacred sites (Lum Sohpetbneng) is concerned, no portion

    of the traditionally recognised sacred sites is affected by the

    proposal project and the proposed alignment for the High-Speed

    Corridor is approximately 500 meters away from the sacred sites.

    Page 23 of 27

    2026:MLHC:371-DB

    It is further stated that such proximity has been evaluated during

    detailed surveys. It is further stated that the project has been

    undertaken with due consultation with the village headmen and

    Dorbar Shnongs so as to address the concerns raised by them.

    23. As far as environmental safeguards are concerned, in

    paragraph 18 of the said affidavit, it is stated as under:

    “18. That it is submitted that in view of the fragile hill
    ecosystem of the State of Meghalaya, particularly Ri-Bhoi
    district, measures relating to biodiversity safeguards and
    mitigation measures are proposed to be adopted through
    alignment optimization to avoid sensitive catchment areas.
    Further, extensive tunnelling and bridging are proposed to
    be undertaken wherever needed in order to minimize hill
    cutting and ecological disruption.”

    24. As far as statutory compliances are concerned, the relevant

    paragraphs 19 to 23 of the said affidavit are reproduced

    hereinbelow:

    “19. That as part of the due process towards receiving
    environmental clearances, the proposed project shall be
    placed before a “Project Screening Committee” under Rule 9
    (7) of the Van (Sanrakshan Evam Samvardhan) Rules,
    2023, which shall examine the completeness, correctness
    and feasibility of the proposed project and ensure that
    deficiencies, if any, are identified and addressed.

    Thereafter, the project shall be taken up for further

    Page 24 of 27
    2026:MLHC:371-DB

    processing towards grant of Forest Clearance in accordance
    with various statutory requirements.

    20. That in this regard, it is submitted that the proposed
    project comprises four packages, and submission of
    proposals for diversion of forest land for non-forest use in
    respect of the remaining three packages is under process
    from the end of user agency i.e., National Highways &
    Infrastructure Development Corporation Limited (NHIDCL).

    21. That it is to be noted that the Ministry of Environment,
    Forest & Climate Change, Government of India (MoEF&CC),
    vide notification No. S.O. 3194 (E) dated 14.07.2022,
    amended the Environmental Impact Assessment
    Notification No. S.O.1533(E) dated 14.09.2006 issued by
    (MoEF&CC). It is submitted that by way of the aforesaid
    amendment, a new clause was inserted:

    “(ii) All Highway projects are exempted upto 100 km
    from line of control or border subject to compliance of
    Standard Operating Procedure notified in this regard
    from time to time.”

    22. That it is submitted that the Standard Operating
    Procedure (SOP) referred to in the aforesaid amendment
    was issued vide Office Memorandum No. F. No. IA3-
    22/40/2022-IA.III[E198668] dated 06.02.2023, providing
    guidelines to be followed for all the road/highway projects
    which are exempted from environmental clearance, on
    account of their location falling within 100 km from the
    international border/Line of Control.

    23. That it is most respectfully submitted that the proposed
    project of Greenfield High-Speed Highway Corridor is at the
    preliminary stages and all statutory compliances, including
    forest diversion approval and other regulatory permissions,
    are under active consideration in accordance with law. The
    apprehensions raised in the petition are, therefore,
    premature and speculative.”

    Page 25 of 27

    2026:MLHC:371-DB

    25. Considering what is stated in both the affidavits and the

    statement made across the Bar by Dr. Mozika, learned DSGI on

    behalf of the concerned respondent, we do not find any merit in

    the aforesaid PIL, having regard to the fact, that the authorities

    have accepted and agreed to follow the SOP as reproduced

    hereinabove and all statutory obligations cast on them

    scrupulously. From the affidavits filed, we find that the concerns

    raised by the petitioner have been answered as of today, i.e., the

    authorities have assured to scrupulously follow all what is stated

    in the affidavits, by taking steps to protect the environment,

    natural streams, cultural sites, etc.; that permissions will be

    sought of all authorities before commencement of the project, as

    required and that no rules/regulations/permissions will be

    flouted.

    26. Needless to state, that the petitioner is at liberty to file a

    fresh petition, if a fresh cause of action so arises in future.

    Page 26 of 27

    2026:MLHC:371-DB

    27. Petition stands disposed of accordingly.

                                      (W. Diengdoh)                 (Revati Mohite Dere)
                                          Judge                        Chief Justice
    
    
    
                       Meghalaya
                      17.04.2026
                     "Lam DR-PS"
    
    
    
    
    Signature Not Verified
                                                                                         Page 27 of 27
    Digitally signed by
    LAMPHRANG KHARCHANDY
    Date: 2026.04.21 17:07:38 IST
    

    [ad_1]

    Source link

    LEAVE A REPLY

    Please enter your comment!
    Please enter your name here