Bombay High Court
Tridoss Laboratories Pvt. Ltd. And Anr vs Union Of India And 2 Ors on 15 April, 2026
Author: Manish Pitale
Bench: Manish Pitale
2026:BHC-OS:9377-DB
WP2789_17.doc
IN THE HIGH COURT OF JUDICATURE AT BOMBAY
ORDINARY ORIGINAL CIVIL JURISDICTION
WRIT PETITION NO.2789 OF 2017
Tridoss Laboratories Pvt. Ltd. and another ... Petitioners
Vs.
Union of India and others ... Respondents
Mr. Sharan Jagtiani, Senior Advocate with Ms. Surabhi Agrawal, Mr. Vishal
Maheshwari and Ms. Kamini Pansare i/b. VM Legal for Petitioners.
Mr. A. S. Khandeparkar, Senior Advocate with Mr. D. P. Singh, Mr. Yashodeep
Deshmukh and Ms. Vaidehi Pradeep for Respondent No.1 - UOI.
Ms. Uma Rahi, AGP for Respondent Nos.2 and 3 - State.
CORAM : MANISH PITALE &
SHREERAM V. SHIRSAT, JJ.
Reserved on : MARCH 16, 2026
Pronounced on: APRIL 15, 2026
ORDER :
(Per Justice Manish Pitale)
. The petitioner No.1 is a company engaged in the business of
manufacturing and marketing pharmaceutical products and petitioner
No.2 is its authorized representative. They have filed this petition being
aggrieved by a demand notice dated 15.02.2016 issued by respondent
No.1 i.e. Union of India through Department of Pharmaceuticals as also
impugned notice of demand issued to a defaulter by respondent No.3
Tahsildar under Section 267 of the Maharashtra Land Revenue Code,
1966 (for short ‘MLR Code’). The principal contention raised on behalf
MINAL by
Digitally signed
MINAL
SANDIP SANDIP PARAB
Date: 2026.04.15
of the petitioners is that the petitioner No.1 is not liable to pay the
PARAB 19:10:22 +0530
amount demanded by the respondents for allegedly overcharging
consumers in respect of a specific pharmaceutical formulation and that,
in any case, the demand is hopelessly time-barred. The huge delay in
raising the demand has resulted in depriving the petitioners from
1/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:29 :::
WP2789_17.doc
formulating their defence as the records pertaining to the relevant period
were not available with the petitioners in the year 2016, when the
impugned notices of demand were issued by the respondents.
2. The chronology of events leading to filing of the present writ
petition would be relevant for appreciating the rival contentions. On
06.01.1995, respondent No.1 issued Drugs (Price Control) Order 1995
(DPCO 1995) by exercising power under Section 3 of the Essential
Commodities Act, 1955. The First Schedule appended to DPCO 1995
specified the bulk drugs and formulations for which the respondent No.1
fixed ceiling price in accordance with paragraph 9 of DPCO 1995. For
the present case, inclusion of ‘Theophylline’ in the First Schedule is
relevant. The aforesaid DPCO 1995 consisted of 27 paragraphs, inter
alia, providing for definitions of various terms used therein and also
specified the powers of the respondent No.1 to fix retail price, ceiling
price and to recover overcharged amounts from the entities in the
business of manufacture and marketing of such bulk drugs and
formulations.
3. The petitioner No.1 claims that it was exempted under a
Notification dated 02.03.1995 issued by the respondent No.1, meant for
small scale units. On 06.11.1995, the respondent No.1 issued
Notification, fixing ceiling prices for various formulations of
Theophylline. The petitioner No.1 was manufacturing Theophylline CR
300 mg tablets. Since the Notification issued by the respondent No.1,
fixing ceiling prices for various formulations of Theophylline did not
include Theophylline CR 300 mg tablets, the petitioner No.1 proceeded
on the basis that there was no ceiling price. It is to be noted that certain
variants of tablets were added by way of subsequent specific
Notifications issued on 09.08.1996, but the aforesaid formulation of the
petitioner No.1 was not included. Therefore, the petitioner No.1
2/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:29 :::
WP2789_17.doc
proceeded on the basis that the ceiling price did not apply to the variant
of Theophylline CR 300 mg tablet, as it was never notified by the
respondent No.1.
4. After about 9 years, by issuing Notification dated 03.10.2006, the
respondent No.1, for the first time, introduced ceiling prices for the
variant Theophylline (CR/SR) 300 mg tablets. However, by this time,
the petitioner No.1 had discontinued manufacturing its brand of
Theophylline CR 300 mg tablet i.e. Phylobid CR 300 mg tablet.
5. Respondent No.1 claims that on 02.06.2008, it had issued a notice
to the petitioner No.1 about alleged overcharging with regard to the said
Phylobid CR 300 mg tablet i.e. brand name of the said petitioner for
Theophylline CR 300 mg tablet. According to the petitioner No.1, it
never received the said notice. We find that the documents placed on
record by the respondent No.1 in this petition also do not support the
assertion of the said respondent that the said notice was ever served
upon the petitioner No.1.
6. There was no further action taken by the respondent No.1 and
after about 9 years, on 18/20.02.2015, the respondent No.1 issued notice
to the petitioner No.1, alleging that the said petitioner had manufactured
and marketed Phylobid CR 300 mg tablets between May 2004 and
February 2006, without applying for price approval despite knowing that
the said product was under ‘controlled price category’. The said notice
was issued on the basis that the entire amount received by the petitioner
No.1 for sale of the said Phylobid CR 300 mg tablets was payable as the
petitioner No.1 had failed to apply for price approval.
7. Thereafter on 15.02.2016, the respondent No.1 issued a demand
notice to the petitioner No.1 and one Vapi Care Pharma Private Limited,
which had manufactured the said product under licence from the
3/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:29 :::
WP2789_17.doc
petitioner No.1. In this demand notice, the earlier notice dated
18/20.02.2015 was superseded and it was claimed that the petitioner
No.1 was liable to pay amount for having charged over and above the
ceiling price fixed for the aforementioned product. On 14.03.2016, the
petitioner No.1 responded to the demand notice, stating that in the year
2006, it had discontinued manufacturing the said product i.e. Phylobid
CR 300 mg tablet. On 09.05.2016, the petitioner No.1 sent a detailed
response to the demand notice of respondent No.1, specifically stating
that the earlier alleged notice / letter dated 02.06.2008 was never
received. It was specifically stated that the amended Notification under
DPCO 1995 fixed ceiling price only for Theophylline SR 300 mg tablets
and not for Theophylline CR 300 mg tablets (sold by the petitioner
under its brand Phylobid CR 300 mg tablet). On this basis, it was stated
that the petitioner No.1 was not liable to pay the alleged overcharged
amount.
8. On 08.11.2016, the respondent No.1 sent another communication
to the petitioner No.1, calling upon it to provide documentary proof of
quantity of formulation rejected / defected, quantity used for sampling
and unsold quantity. On 02.12.2016, the petitioner No.1 responded by
stating that it had discontinued manufacturing Phylobid CR 300 mg
tablet in the year 2006 itself, further reiterating that it was exempted
from any ceiling price on a proper reading of relevant notification. The
petitioner No.1 further stated that as per its Standard Operating
Procedure (SOP), since it was required to retain records only for five
years, the record pertaining to the relevant period was not available and
it was destroyed.
9. In this backdrop, on 30.10.2017, the respondent No.3 Tahsildar
issued ‘notice of demand to a defaulter’ under Section 267 of the MLR
Code, demanding amount of Rs.1,25,22,416/- within 20 days,
4/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:29 :::
WP2789_17.doc
threatening that in case of failure, property belonging to the petitioner
No.1 would be attached and sold for satisfying the demand. Aggrieved
by the same, the petitioners filed the present petition. On 22.11.2017, the
instant petition was taken up for consideration urgently, when a
statement was made on behalf of the respondents that warrant of
attachment was yet to be served on the petitioners and that, no further
coercive steps would be taken till the next date of hearing. It is an
admitted position that the said statement has continued to operate and
hence, the impugned demand notice has not been acted upon by the
respondents.
10. On 01.06.2018, the respondent No.1 filed its reply affidavit. It
relied upon various judgements of the Supreme Court, stating that
ceiling prices for essential drugs were issued in public interest and that
DPCO 1995 was the source of power for fixing such ceiling prices. It
was submitted that since scheduled formulation could not be sold
without prior approval and ceiling price was already fixed for
Theophylline SR 300 mg tablet, the same applied to the product of the
petitioner No.1, and therefore, the said petitioner was not liable to pay
the overcharged amount. Respondent Nos.2 and 3 filed their reply
affidavit, stating that a certificate of recovery was received in respect of
the dues payable by the petitioner No.1 and that the said respondent
No.3 was bound to issue the impugned demand notice as per the
provisions of the MLR Code. On this basis, the respondents contended
that the petition deserved to be dismissed.
11. Mr. Sharan Jagtiani, learned senior counsel appearing for the
petitioners submitted that the tenor of the reply affidavit filed on behalf
of the respondent No.1 shows that it was seeking to fall back on its first
notice dated 18/20.02.2015, whereby it was claimed that since the
petitioner No.1 had failed to apply for price fixation, the entire price
5/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:29 :::
WP2789_17.doc
charged by the petitioner No.1 for its aforesaid formulation Phylobid CR
300 mg was payable as dues. This was clearly contrary to the second
demand notice dated 15.02.2016 issued by the respondent No.1,
whereby it superseded the first notice dated 18/20.02.2015. On this
basis, it was submitted that the approach of the respondent No.1 was
self-contradictory and unsustainable.
12. Even with regard to the second demand notice dated 15.02.2016,
it was submitted that the same was clearly unsustainable in the light of
the fact that the formulation Theophylline CR 300 mg (brand name of
the petitioner No.1 being Phylobid CR 300 mg) was never included in
the Notification issued by the respondent No.1, fixing ceiling price for
various formulations. It was submitted that while the respondent No.1
did issue amended Notification on 09.08.1996 (including Theophylline
SR 300 mg tablets), for fixing ceiling prices and specifying such ceiling
prices, no such amended notification was issued in respect of
Theophylline CR 300 mg tablets. It was further submitted that the
formulation of Theophylline CR 300 mg tablets was, for the first time,
included by a Notification issued after about 10 years on 03.10.2006.
The very fact that such a specific amended Notification was required to
be issued for fixing ceiling prices, specifically for the formulation
Theophylline CR 300 mg tablets, demonstrates the fallacy in the stand of
the respondent No.1 that ceiling price fixed for Theophylline SR 300 mg
tablets was applicable to Theophylline CR 300 mg tablets.
13. It was further submitted that a recent judgement of this Court in
the case of Pfizer Limited and another Vs. Union of India and others,
2025 SCC OnLine Bom 3821 took into consideration the difference in
various drug delivery systems such as controlled release, sustained
release, delayed release, extended release etc., while holding that each
such distinct drug delivery system is to be specified as a formulation for
6/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
fixing ceiling prices. It was submitted that although the said judgement
was concerned with subsequent Drugs (Price Control) Orders, the
observations made in the said judgement would inure to the benefit of
the petitioners also. In this regard, reliance was also placed on
judgement of the Delhi High Court in the case of Modi-Mundipharama
Pvt. Ltd. Vs. Union of India and others, 2018 SCC OnLine Del 9904.
14. Apart from this, a very serious challenge was raised to the
impugned notices issued by the respondent No.1 on the ground that in
the present case, principles of natural justice stood violated. It was
submitted that the respondent No.1 issued its first notice to the petitioner
on 18/20.02.2015, raising demand for sale of the said formulation of the
petitioner No.1, for the period from May 2004 to February 2006. It was
submitted that the said notice was issued after a long period of nine
years. The said notice was superseded by a subsequent notice dated
15.02.2016, thereby demonstrating that the impugned action was
undertaken on the basis of the second demand notice, which was issued
a full 10 years after the subject period was over. By referring to the said
chronology of events, it was submitted that the entire action stood
vitiated as the petitioner No.1 was prevented from raising its own
defence as the relevant records were no longer available. It was further
submitted that the respondent No.1 could not be permitted to rise from
its slumber after a decade to call upon the petitioner No.1 to make good
the allegedly overcharged price for the aforesaid formulation. In support
of the said contention, reliance was placed on the judgements of this
Court in the cases of Parekh Shipping Corporation Vs. Assistant
Collector of Customs, Bombay, 1995 SCC OnLine Bom 622; Anil
Nemichand Bafna and others Vs. State of Maharashtra, 2010 SCC
OnLine Bom 704; Zuari Agro Chemicals Limited and another Vs.
Union of India and others (judgement dated 21.01.2014 passed in Civil
Writ Petition No.11794 of 2013); Mahindra and Mahindra Limited Vs.
7/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
Union of India and others (order dated 19.11.2024 passed in Writ
Petition No.4339 of 2024); and JKC General Trading Company Vs.
Union of India and others (judgement and order dated 01.12.2025
passed in Writ Petition No.15775 of 2025). In this context, reliance was
also placed on judgements of the Supreme Court in the cases of State of
Madhya Pradesh Vs. Bani Singh and another, 1990 (Supp) SCC 738
and Kranti Associates Private Limited and another Vs. Masood Ahmed
Khan and others, (2010) 9 SCC 496.
15. The learned senior counsel further relied upon judgements of the
Supreme Court in the cases of S. L. Kapoor Vs. Jagmohan and others,
(1980) 4 SCC 379 and Airports Economic Regulatory Authority of India
Vs. Delhi International Airport Limited and others, (2024) 15 SCC 345,
for the proposition that the respondent No.1 was under a duty to act
fairly even when its administrative act was being tested. It was further
submitted that the respondent No.1 was also under a duty to record
proper reasons and to give a hearing to the petitioners before the drastic
action of seeking to recover alleged overcharged amount as arrears of
land revenue. In this regard, reliance was placed on the aforementioned
judgement of the Supreme Court in the case of Kranti Associates
Private Limited and another Vs. Masood Ahmed Khan and others
(supra).
16. On the other hand, Mr. Khandeparkar, learned senior counsel
appearing for respondent No.1 refuted the claims made on behalf of the
petitioners. It was submitted that on a proper reading of DPCO 1995,
particularly definitions of the expressions ‘bulk drug’ and
‘formulations’, it was evident that once the drug / formulation
Theophylline was included in the First Schedule to DPCO 1995, the
respondent No.1 was entitled to call upon the petitioner No.1 to make
good the amount overcharged for the said formulation. Reliance was
8/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
placed on the power with the respondent No.1 to fix ceiling prices for
such essential drugs and formulations. Although it was conceded that the
respondent No.1 did not have any documents to show that notice dated
02.06.2008 was ever served upon the petitioner No.1, it was submitted
that letter of the same date was served upon the licensee of the petitioner
No.1 i.e. Vapi Care Pharma Private Limited, and therefore, it was not
believable that the petitioner No.1 was not served. It was emphasized
that the subsequent notice dated 18/20.02.2015 was indeed served upon
the petitioner No.1 on the same address, thereby falsifying the claim of
the said petitioner. It was submitted that no fault could be found with the
respondent No.1 insisting upon payment of the overcharged amount by
treating the ceiling price fixed for Theophylline SR 300 mg as the basis
for the formulation manufactured and sold by the petitioner No.1.
17. It was submitted that the contentions pertaining to violation of
principles of natural justice raised on behalf of the petitioners by placing
reliance on a plethora of judgements, are wholly misplaced because the
petitioner No.1 was granted ample opportunity to explain its conduct of
overcharging the consumers. Since no plausible explanation was given,
the consequential action of recovering the overcharged amount as arrears
of land revenue was clearly justified.
18. Much emphasis was placed on judgement of the Supreme Court in
the case of T. C. Healthcare Private Limited and another Vs. Union of
India and others, (2020) 15 SCC 117, to contend that the Supreme Court
in the context of DPCO 1995 had categorically held that it was for the
manufacturers like petitioner No.1 to have approached respondent No.1
for fixing of ceiling price. The omission of petitioner No.1 to do so
cannot inure to its benefit when the respondent No.1 found the act of
overcharging on behalf of the petitioner No.1. It was submitted that the
approach sought to be adopted by the petitioner No.1 goes against the
9/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
position of law clarified by the Supreme Court with regard to the power
of the respondent No.1 to fix ceiling prices for essential drugs and
formulations in series of judgements, including judgement in the case of
Union of India Vs. Cynamide India Limited, (1987) 2 SCC 720 and
other such judgements. It was further submitted that it would be against
public interest to allow the petitioner No.1 to escape liability despite a
clear case of overcharging made out against it.
19. On this basis, it was submitted that the writ petition deserved to
be dismissed and the respondents need to be relieved of the statement
made on 22.11.2017 before this Court.
20. The aforesaid rival contentions raised on behalf of the petitioners
on the one hand and on behalf of the respondents on the other,
demonstrate that the specific issues pertaining to violation of principles
of natural justice, have been raised on behalf of the petitioners, in the
context of delay of more than 10 years on the part of respondent No.1 in
taking up the issue of alleged overcharging by the petitioner No.1 for the
aforementioned formulation of Theophylline CR 300 mg (brand name
Phylobid CR 300 mg), the duty on the part of the respondent No.1 to act
fairly in its administrative action of issuing show cause notice and the
necessity of recording reasons for issuing the demand notice for huge
amount, without recording any reasons and/or granting hearing to the
petitioners. Apart from this, the petitioners have also raised issues on
merits, to challenge the impugned action of the respondents.
21. We have considered the rival submissions on the aspect of the
date when the petitioner No.1 was first made aware about its liability to
make good the amount overcharged for sale of the said formulation
bearing its brand name Phylobid CR 300 mg. In this regard, the record
shows that the first such notice/letter was issued by respondent No.1 on
18/20.02.2015. Although the respondent No.1 claimed that an earlier
10/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
notice dated 02.06.2008 was issued to the petitioners, it failed to place
on record anything to demonstrate that such a notice was ever served
upon the petitioner No.1. During the course of arguments, it was
conceded on behalf of respondent No.1 that no such material was
available.
22. The submission that such a notice was received by a licensee of
the petitioner i.e. Vapi Care Pharma Private Limited, can be of no
consequence and it cannot be the basis to presume that notice dated
02.06.2008 was served upon petitioner No.1. In any case, the said Vapi
Care Pharma Private Limited had responded on 18.06.2008, through its
letter received by respondent No.1 on 23.06.2008, stating that even it
had stopped manufacturing the said product from the year 2005 as the
license was cancelled. Thus, the first notice was issued and served upon
the petitioner on 18/20.02.2015, concerning allegations of illegal
charging of unregulated price for the said formulation Phylobid CR 300
mg, for the period from May 2004 to February 2006. In other words, the
notice was issued after 9 years of the alleged illegal action of the
petitioner No.1.
23. The aforesaid notice dated 18/20.02.2015 alleged that the
petitioner No.1 had sold the said product without applying for price
approval from respondent No.1 or the authority under its control i.e.
National Pharmaceutical Pricing Authority (NPPA). On this basis, it was
claimed that petitioner No.1 was liable to deposit the entire amount of
sale of the said product from May 2004 to February 2006 as
‘unauthorized sale proceeds’ to the tune of ₹ 1,66,03,556, being the
amount with interest upto 10.03.2015.
24. Thereafter, on 15.02.2016, the respondent No.1, through NPPA,
issued demand notice to the petitioner No.1, claiming that it had
overcharged the consumers in respect of the said product. On this
11/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
occasion, it was stated that this was a case of overcharging, thereby
indicating that the entire sale proceeds were not being treated as
unauthorized sale proceeds. A statement of overcharging for the period
from May 2004 to February 2006, was annexed to the demand notice
giving the basis for the allegation of difference in price and overcharging
on the part of petitioner No.1. In this notice, it was specifically stated
that the same was in supersession of the aforementioned notice dated
18/20.02.2015, issued by NPPA. Thus, demand notice dated 15.02.2016
made a complete departure from the basis of issuance of the first
notice/letter dated 18/20.02.2015. The said demand notice dated
15.02.2016 was issued more than 10 years after the period from May
2004 to February 2006, concerning the alleged illegal action on the part
of petitioner No.1.
25. On the basis of the aforesaid huge time gap, the petitioners have
specifically raised the contention pertaining to delay, resulting in
depriving the petitioners from effectively defending their position. In
this regard, reliance is placed on the response dated 14.03.2016 of
petitioner No.1 to the said notice dated 15.02.2016, wherein it was
specifically stated that manufacturing of the product Phylobid CR 300
mg was discontinued by the the said petitioner in the year 2006 itself. It
was specifically stated that the said petitioner was unable to retrieve data
from the existing record as it was very old.
26. Thereafter, on 09.05.2016, the said petitioner further sent a
communication to NPPA, specifically stating that it had never received
the alleged letter dated 02.06.2008. Specific grounds were raised to
defend its position by stating that although notification dated 09.08.1996
fixed the ceiling price for Theophylline SR 300 mg, no such price was
ever fixed for Theophylline CR 300 mg and there was no question of
overcharging. Nevertheless, the said petitioner annexed a statement with
12/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
the aforesaid letter, to give the details of the quantity sold for the period
from May 2004 to June 2005, as per the available record.
27. Thereupon, on 08.11.2016, the respondent No.1 called upon
petitioner No.1 to give documentary proof of quantity of the formulation
rejected/defected quantity used for sampling and unsold quantity along
with disposal/fate within a period of 10 days of receiving the said letter.
On 02.12.2016, the petitioner sent a letter to respondent No.1, through
NPPA, clearly stating that as per its SOP for destruction and
maintenance of record, the records were retained only for a period of 5
years and since such details were being demanded for the period from
May 2004 to February 2006, it was not possible for the said petitioner to
furnish the same. Copy of the SOP was annexed to the said letter.
28. Thus, it becomes evident that from the very beginning, the
petitioner No.1 expressed its handicap in defending its position, as
allegation pertaining to overcharging was levelled against the said
petitioner after a huge delay of more than 10 years, by which time the
relevant data and record for the period from May 2004 to February 2006
was not available. This was not even taken into account by the
respondents, when the impugned notice of demand to defaulter dated
30.10.2017, was issued under section 267 of MLR Code. We find
substance in the contention raised on behalf of the petitioners that the
respondents could not be permitted to rise from their slumber after more
than a decade, to allege overcharging on the part of the petitioner No.1
in the context of the sale of the aforesaid product. Such delayed action
amounts to violation of principles of natural justice, as even under
statutory provisions, the authorities are expected to initiate action within
a reasonable period of time. This Court has considered such a scenario
on a number of occasions and it has been laid down that gross delay in
initiating proceedings and the act of issuing show cause notice in such
13/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
situations, can be quashed on the ground of delay itself.
29. In the case of Parekh Shipping Corporation vs. Assistant
Collector of Cus., Bombay (supra), this Court held as follows:-
‘4. Shri Venkateswaran, learned counsel appearing on behalf
of the petitioners, submitted that the provisions of
Section 116 of the Customs Act should not be exercised
after a passage of more than 12 years from the date of
vessel leaving Port of Bombay. The learned counsel
submitted that it is impossible for the Agents of Foreign
Vessel to show cause as to whether the goods were short-
landed, 12 years before the date of show cause notice. In
our judgment, the submission is correct and deserves
acceptance. It surpasses our imagination as to what
prompted respondent No. 1 to wait for a duration of 12
years to issue show cause notice.
5. The exercise of powers under Section 116 of the Customs
Act, if necessary, must be undertaken within a reasonable
time. Shri Venkateswaran submitted that the Customs
Excise and Gold Control Tribunal has held that show
cause notice issued beyond the period of five years from
the date of vessel leaving the Port is arbitrary and
unreasonable. In our judgment, the period of five years is
more than reasonable. Indeed, the bond executed by the
Agents should also be for a duration of five years and in
case the respondents desire to proceed against the Agents,
action must be taken before the expiry of the period. The
bond should not be kept alive for all time to come and
must be limited for a duration of five years from the date
of execution. For these reasons, the show cause notice
issued by respondent No. 1 cannot be sustained and
petition must succeed.’
30. In the case of Mahindra and Mahindra Ltd. vs. Union of India
and others (supra), while considering an action sought to be undertaken
by the competent authority under the provisions of Customs Act, 1962,
this Court held that even where the statute is silent on limitation, the
concerned authority is expected to initiate proceedings within a
reasonable period of time on a holistic reading of the scheme of the
statute. It was held that the show cause notice issued after gross delay,
14/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
deserved to be quashed on that very ground itself.
31. We find that in the present case, the gross delay of more than 10
years in itself could be a ground for setting aside the impugned show
cause notice, demand notice and notice of demand to defaulter issued
under the MLR Code. In this case, in its response to the notices sent by
respondent No.1 through NPPA, after more than 10 years, the petitioner
No.1 had specifically stated that the data and record for the relevant
period was not available as more than a decade had gone by. Reference
was also made to the SOP of the said petitioner of maintaining its record,
stating that the record was destroyed after 5 years. The respondent No.1
and NPPA have not come forward to explain in any manner as to what
prevented them for more than 10 years from taking action against the
said petitioner for the alleged overcharging for the said product.
32. As a matter of fact, the notification dated 03.10.2006, for the first
time, included Theophylline CR 300 mg under the regime of price
fixing. By this time, the petitioner No.1 had already stopped
manufacturing its product Phylobid CR 300 mg containing the said
formulation. The respondent No.1 waited for 9 years to issue the first
notice dated 18/20.02.2015. Subsequently, after one year, the respondent
No.1 chose to supersede the said notice and on 15.02.2016, issued a
demand notice, more than 10 years after the period during which the
petitioner No.1 had allegedly overcharged, while selling its product. We
find substance in the contention raised on behalf of the petitioners that in
the absence of any explanation as to why respondent No.1 failed to
proceed within reasonable period of time and waited for a period of
more than 10 years to issue the demand notice, the impugned action
deserves to be set aside.
33. Apart from this, we find substance in the contention raised on
behalf of the petitioners that respondent No.1, as a department of the
15/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
State and its authority i.e. the NPPA, were expected to act in a fair and
reasonable manner, while undertaking the impugned actions. The
Supreme Court, in the case of S. L. Kapoor vs. Jagmohan and others
(supra), held that the distinction between a judicial act and an
administrative act had withered away and that even in the context of an
administrative action, the concerned authority was expected to act in a
fair manner. A strict adherence to natural justice was emphasized upon
and this necessarily encompassed the requirement of granting a fair
hearing and recording reasons for taking the ultimate action, particularly
when severe and on occasions, penal consequences are inflicted upon the
aggrieved person.
34. In the case of Airports Economic Regulatory Authority of
India vs. Delhi International Airport Limited and others (supra), the
Supreme Court again commented upon the fact that there was no longer
any difference between a quasi judicial function and an administrative
function, as both required a duty to act fairly on the part of the
concerned authority, as principles of natural justice were read into
administrative action also. The relevant portion of the said judgement
reads as follows:
“50. In Ridge v. Baldwin, Lord Reid observed that the judicial
character of the duty must be inferred from the nature of
the duty itself. Since the decision in Ridge, Courts have
inferred the duty to act judicially, that is, in compliance
with the principles of natural justice based on whether
the decision adversely affects legal rights. Over time,
courts have abandoned the classification between quasi-
judicial and administrative functions because the duty to
act fairly, in compliance with the principles of natural
justice has been read into administrative actions as well.
M. P. Jain and S. N. Jain in their treatise on
Administrative Law elucidate the reasons for the blurring
of this distinction:
‘Differentiation between quasi-judicial and
administrative seems to be merely an artificial formality,
as many a time such a distinction is elusive and mostly a16/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.docmanner of judicial policy. Also, since the functions of the
Administration have been expanding adversely affecting
the rights and interests of individuals, the courts are
convinced that it is essential to concede the right of
hearing on a broader scale, but, at the same time, it may
be artificial to call a function as quasi-judicial as it may
have no judicial element involved. Or, in a situation, the
court may feel that the function of the Administration is
such that it is susceptible to the application of only a few
but not all the elements of natural justice. […] Further,
when a proceeding is characterised as administrative, the
person whose interests are adversely affected thereby
maybe left with no effective means of redress of his
grievances as he could claim no procedural safeguards.
To overcome these difficulties, the new trend has
emerged. The advantage is that procedural fairness can
be imposed on a large number of decision-making bodies
without having to characterise their functions as quasi-
judicial. This approach has resulted in applying hearing
procedure to a large chunk of administrative process.
The nexus between hearing and quasi-judicial no longer
exists in administrative process. This approach does
away with the conceptual approach of calling a function
as quasi-judicial when not much of judicial element is
discernible there. […] The emphasis is now placed on the
element of injury to the concerned person by the
administrative action in question to concede hearing to
the affected person.’
(emphasis supplied)”
35. Applying the said position of law to the facts of the present case, we
find that respondent No.1 was expected to act fairly, which included the
necessity of acting within reasonable period of time and not waiting for
more than a decade to call upon the petitioner No.1 to explain the alleged
overcharging for the said product. Such delayed action prejudiced the said
petitioner in raising its defence as the relevant data and records were no
longer available. Apart from this, a perusal of the communications in
response given by the petitioner No.1 on 14.03.2016, 09.05.2016 and
02.12.2016, sufficiently demonstrated that specific grounds were raised to
resist the proposed action to be taken by respondent No.1. This was despite
the handicap faced by the petitioner No.1 due to the delayed action
17/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
undertaken by the respondent No.1.
36. The petitioner No.1 specifically raised the ground about non-
applicability of the ceiling price fixation to its product concerning the
formulation Theophylline as it was never notified by respondent No.1. The
petitioner No.1 had also specifically relied upon its registration as a small
scale industry, exempting it from operation of DPCO 1995 and other such
grounds. Respondent No.1 failed to consider the said grounds specifically
raised on behalf of petitioner No.1. It is an admitted position that petitioner
No.1 was never given hearing, despite such specific grounds of challenge
raised on its behalf and respondent No.1 directly proceeded to claim the
alleged overcharged amount as arrears of land revenue. This resulted in the
impugned demand of notice to defaulter dated 30.10.2017 being issued by
the Tahsildar under section 267 of MLR Code.
37. We find substance in the contention raised on behalf of the
petitioners that the aforesaid approach adopted by respondent Nos.1 and 3
violated the principles of natural justice as the said respondents did not act
in a fair manner. No reasons were recorded for the drastic action of seeking
to recover the huge amount of ₹ 1,25,22,416 as arrears of land revenue and
no hearing was given to petitioner No.1 at any point in time.
38. We find substance in reliance placed on behalf of the petitioners on
the judgement of the Supreme Court in the case of Kranti Associates
Private Limited and Masoon Ahmed Khan and others (supra). In the
said judgement, the Supreme Court held that it was necessary for recording
reasons for executive actions. After referring to a number of earlier
precedents, including certain English judgements, the Supreme Court in the
said judgement, summarised that if a decision of an administrative
authority prejudicially affects anyone, reasons must necessarily be
recorded. It was held that this operates as a valid restraint on any possible
arbitrary exercise of administrative power and that it had been taken on
relevant grounds, instead of extraneous considerations. It was held that
18/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
recording reasons facilitates judicial review of the administrative action and
that it encourages transparency.
39. We find that respondent No.1, in the facts of the present case, fell
short of satisfying the aforesaid requirements, while taking the
administrative action of issuing the impugned notices and demands against
the petitioners. The said aspect was reiterated in the judgement of this
Court in the case of Zuari Agro Chemicals vs. Union of India and others
(supra), wherein it was held that even if there is no specific provision for a
personal hearing and issuance of a speaking order under provisions of the
statute, the principles of natural justice are required to be read into the
statute, to ensure that they are followed. It was further reiterated that
reasons are the soul of the orders and that such requirements apply to
administrative and executive actions also with equal force. We do find
substance in the said contentions raised on behalf of the petitioners, to the
effect that the manner of exercising power on the part of the respondents, in
the facts and circumstances of the present case, demonstrated flagrant
violation of principles of natural justice, thereby vitiating the entire action
and justifying the prayer made on behalf of the petitioner for setting aside
the impugned notices and demands.
40. On the merits of the matter, the respondents relied upon judgment of
the Supreme Court in the case of T. C. Healthcare Private Limited and
another vs. Union of India and another (supra). It was contended that the
petitioner, in terms of DPCO 1995 ought to have approached respondent
No.1 for approval of price for the aforesaid product Phylobid CR 300 mg.
In this context, reliance was placed on the definitions of the expressions
‘bulk drug’, ‘ceiling price’, ‘formulation’, ‘schedule’, ‘scheduled bulk
drug’ and ‘scheduled formulation’. Reliance was also placed on paragraph
Nos.3, 8 and 9 of the DPCO 1995 in the context of the aforesaid
submission.
41. We find that in the light of respondent No.1 itself having superseded
19/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
its earlier notice dated 18/20.02.2015 by the subsequent demand notice
dated 15.02.2016, it cannot place reliance on the said judgment of the
Supreme Court and the contents of the DPCO 1995, in order to insist that
the impugned notices and demand are justified, as the petitioner No.1 failed
to apply to respondent No.1 for approval of price for the said product. In
the first notice dated 18/20.02.2015, the respondent No.1 had stated that the
petitioner No.1 was liable to deposit the entire amount of ‘unauthorized
sale proceeds’ in respect of the said product Phylobid CR 300 mg. The said
notice was evidently issued on the basis that since the petitioner No.1 had
failed to apply for price approval of the said product, it ought to deposit the
entire sale proceeds. This is evident from paragraph No.3 of the said notice
dated 18/20.02.2015. But the moment the respondent No.1 superseded the
said notice by the subsequent demand notice dated 15.02.2016, the very
basis for claiming that the petitioner No.1 was liable to deposit the entire
amount towards ‘unauthorized sale proceeds’, was taken away. As a matter
of fact, the subsequent demand notice dated 15.02.2016 reduced the
liability of petitioner No.1 from ₹ 1,00,95,317 to ₹ 42,90,626 and
restricted the liability to ‘overcharged amount’. The statement of
overcharging annexed to the aforesaid demand notice dated 15.02.2016
shows that the difference or the amount towards overcharge, was calculated
on the basis of the ceiling price fixed for Theophylline SR 300 mg, treating
the same equivalent to Theophylline CR 300 mg (brand name of the
petitioner’s product being Phylobid CR 300 mg). In other words, the case
against the petitioner No.1 of failure in applying for fixation of price was
consciously given up by respondent No.1 and therefore, the said contention
of respondent No.1 is rendered unsustainable.
42. Even otherwise, in the said judgment of the Supreme Court, in the
case of T. C. Healthcare Private Limited and another vs. Union of India
and another (supra), the Supreme Court was specifically considering a
challenge to a notification dated 11.07.2006, whereby the respondent No.1
had specifically fixed the ceiling price for the formulation that was the
20/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
subject matter of the said case. The Supreme Court found that under DPCO
1995, the respondent No.1 indeed had the power to fix such price and
therefore, if the appellants therein wanted to claim that their drug delivery
system was unique and different, it was for them to come forward and
demonstrate the same. The observations made by the Supreme Court in the
context of the aforesaid controversy, cannot be relied upon by respondent
No.1 in the facts of the present case.
43. In this case, we find that while the respondent No.1 consciously
issued subsequent notification dated 09.08.1996 to add the formulation
Theophylline SR 300 mg tablets under the regime of fixation of ceiling
price, the formulation Theophylline CR 300 mg tablets was not added by
way of amendment. The contention of respondent No.1 that sustain release
(SR) ought to be treated as equivalent to control release (CR), is
unacceptable, for the reason that if that was the case, there was no necessity
for issuing notification dated 03.10.2006 specifically including
Theophylline CR 300 mg under the regime of ceiling price fixation. In any
case, as noted hereinabove, the petitioner had stopped manufacturing its
product Phylobid CR 300 mg (brand name for formulation Theophylline
CR 300 mg) in the year 2006. This indicates another reason why the
contention raised on behalf of respondent No.1 cannot be accepted.
44. It is to be noted that in a recent judgement of this Court in the case
of Pfizer Limited and another Vs. Union of India and others (supra),
although this Court was concerned with the explanation provided below the
National List of Essential Medicines, 2015 (NLEM) that specifically
stipulated that formulations developed through incremental innovations or
novel drug delivery system could be considered included in the regime of
ceiling price fixation only if specified in the list, observations made with
regard to the difference in drug delivery systems in the said judgement, can
be said to be relevant. It was noted in the said judgment that whenever a
specific drug delivery system like sustain release or control release, other
21/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
than the ordinary tablet was intended to be covered under the NLEM, there
was a specific reference to that drug delivery system and that when a
particular drug delivery system stood covered by specific mention in the
NLEM, by implication, the drug delivery system which was not mentioned,
would have to be considered as not included in the list amenable to ceiling
price fixation. To that extent, the observations made in the aforesaid
judgement of this Court are relevant for the present case. For the very same
reason, reliance placed on behalf of the petitioners on judgement of the
Delhi High Court in the case of Modi-Mundipharama Pvt. Ltd. Vs.
Union of India and others (supra), is justified.
45. In this backdrop, we find that respondent No.1 could not have
treated the ceiling price fixed for drug delivery system concerning sustain
release i.e. Theophylline SR 300 mg as the ceiling price fixed for the
distinct drug delivery system of control release concerning the product of
petitioner No.1 i.e. Theophylline CR 300 mg (brand name of the
petitioner’s product being Phylobid CR 300 mg). Therefore, the stand of
respondent No.1 in order to justify its actions, is found to be unsustainable.
In any case, as noted hereinabove, the impugned notices and demand were
not only highly belated, thereby depriving the petitioner No.1 from raising
its defence effectively, the same also demonstrated lack of fairness on the
part of respondent No.1 and absence of a proper opportunity granted to the
petitioner No.1 and total absence of any consideration of the limited stand
the petitioner No.1 could take in its responses. There was no reason
recorded at all as to why the respondent No.1 proceeded to issue the
demand, eventually leading to ‘notice of demand to defaulter’ issued by
respondent No.3 – Tahsildar under the provisions of MLR Code.
46. Since we have found the impugned notices and demand issued by
respondent No.1 to be unsustainable for the aforesaid reasons, the
consequential notice of demand issued by respondent No.3 – Tahsildar
under the provisions of MLR Code, is also found to be unsustainable.
22/23
::: Uploaded on – 15/04/2026 ::: Downloaded on – 15/04/2026 20:42:30 :::
WP2789_17.doc
47. We also do not find substance in the contention raised on behalf of
respondent No.1 by relying upon the judgement of the Supreme Court in
the case of Union of India Vs. Cynamide India Limited (supra), for the
reason that there cannot be any quarrel about the fact that respondent No.1
indeed has the power to fix prices and issuing ceiling price for essential
products, including life saving drugs, the same can be done only in
accordance with law and the provisions of the relevant drug control orders.
In the present case, since we find that respondent No.1 has not been able to
sustain its action under DPCO 1995, reliance on the said judgement on
behalf of respondent No.1, can be of no consequence.
48. In view of the above, the writ petition is allowed in terms of prayer
clauses (a) to (e). As a result, the impugned demand notice dated
15.02.2016 and notice of demand dated 30.10.2017 are quashed and set
aside. Pending applications, if any, also stand disposed of.
(SHREERAM V. SHIRSAT, J.) (MANISH PITALE, J.) Minal/Priya 23/23 ::: Uploaded on - 15/04/2026 ::: Downloaded on - 15/04/2026 20:42:30 :::
