State vs Mehrajuddin on 15 April, 2026

    0
    40
    ADVERTISEMENT

    Delhi District Court

    State vs Mehrajuddin on 15 April, 2026

               IN THE COURT OF SH. KUMAR RAJAT,
          ADDL. SESSIONS JUDGE-07, SHAHDARA DISTRICT,
                 KARKARDOOMA COURTS, DELHI
    
    IN THE MATTER OF:
    
    CNR No. DLSH01-001847-2021
    SC No. 81/2021
    FIR No. 211/2013
    PS Jafrabad
    U/S 288/308/304 IPC
    
    STATE
    Vs.
    MEHRAJUDDIN,
    S/o Late Sh. Rehmatullah,
    R/o H.No. G-45, East Kailash,
    New Delhi.
                                                                    ........ Accused
    Date of Institution of case                      20.02.2021
    Date of case reserved for Judgment 04.04.2026
    Judgment Pronounced on                           15.04.2026
    Decision                                         Acquitted
    
    
                                        JUDGMENT
    

    BRIEF FACTS OF THE CASE

    1. As per the case of prosecution, on 06.07.2013, DD no.
    4B was registered that at about 1.54 AM, one building had
    collapsed near Tent Wala School, Jafrabad, Delhi and IO reached
    the spot and prepared a note that on receipt of DD No. 30A dated
    05.07.2013 regarding apprehension of collapse of building no.
    12A/72D, Jamalu Ka Bagh, Gali No. 1, Maujpur of 180 Sq. yards

    SPONSORED

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 1 of 44

    Digitally signed

    KUMAR by KUMAR
    RAJAT

    RAJAT Date:

    2026.04.15
    16:41:00 +0530
    and SHO and ACP reached there. Officers of MCD i.e. A.K.
    Singh (AE Works), OP Ojha (Ex.En. Building), Mohd. Illyasi
    (Ex.En.), Inspector Satbir with DC Staff, Sh. Tarun Kumar
    Tahsildar (Shahdara and Seelampur with staff) also reached the
    spot. Owner of the building Mehrajuddin and builder Furkan also
    reached there. Mehrajuddin desired to demolish the building, but
    he was forbidden by SHO, Jafrabad and ACP, Seelampur as it
    was work of MCD and MCD officials allowed the owner to
    demolish the building and SHO Jafrabad increased the police
    staff to cordon off the building, but the said building collapsed at
    1.54 AM while being pull down and 17 labourers got injured and
    it was found that it was already built up old building on which
    only basement and ground floor were already constructed and no
    portion of building was occupied by any shop-keeper or resident
    and construction from ground floor upwards, was started by
    accused Mehrajuddin in 2013 regarding which intimation was
    given by local police to MCD and SDM, Shahdara on
    28.05.2013, which was duly received by Ex.En. (Building),
    Shahdara and SDM, Shahdara on 29.05.2013 and information of
    unauthorized construction was given by local police to MCD
    vide DD No. 20B dated 26.05.2013, which was duly booked by
    MCD on 26.05.2013, but no communication was received by
    local police from MCD or SDM, Shahdara. Demolition and
    pulling down of building requires engineering skills, which was
    not known to local police, so it was allowed by MCD officials
    and DC staff present there and building was being pulled down in
    their presence.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 2 of 44

    Digitally signed
    by KUMAR

    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:41:04 +0530

    2. On the said note/complaint, the FIR was registered
    vide FIR No. 211/2013, dt. 06.07.2013 in PS Jafrabad u/s
    288
    /308 IPC. After investigation, charge-sheet was filed against
    accused Mehrajuddin u/s 288/308/304 IPC and after the filing of
    charge-sheet, cognizance of offences was taken against the
    accused.

    CHARGE

    3. Charge for the offences punishable u/s 288/308/304
    IPC was framed against accused Mehrajuddin by Ld. Predecessor
    on 02.02.2022. Accused pleaded not guilty and claimed trial.

    ADMISSION / DENIAL OF DOCUMENTS

    4. Admission/denial of documents u/s 294 Cr.P.C./330
    BNSS was conducted on 22.07.2025. Accused Mehrajuddin, vide
    his separate statement recorded on the abovesaid date, had not
    disputed the following documents:

    (i) MLC No. 167135 dt. 06.07.2013 of injured Yaseen
    prepared by Dr. Girish Chander Prabhat of Shushutra Trauma
    Centre, Delhi, Ex.PA1.

    (ii) MLC Nos. D-8, D-9 and D-14, all dt. 06.07.2013
    of injured persons namely Abdul Hasan, Nawab Ali and Aslam
    prepared by Dr. Ashish Tomar of GTB Hospital, Ex.PA2, Ex.PA3
    & Ex.PA4.

    (iii) MLC No. D-2, D-3, D-5 and D-11, all dt.

    06.07.2013 of injured persons namely Mohd. Akhtar, Shamshul,
    Mohd. Shahid and Mohd. Samad prepared by Dr. Aditya
    Chauhan of GTB Hospital, Ex.PA5, Ex.PA6, Ex.PA7 & Ex.PA8.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 3 of 44

    Digitally signed

    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:41:09 +0530

    (iv) MLC Nos. D-4, D-1, D-7, D-12, D-10, D-13, all
    dt. 06.07.2013 of injured persons namely Sonawar, Illyas,
    Riyasat, Ehsaan, Mohd. Iqbal and Ikram prepared by Dr. Alok
    Chaudhary and nature of injuries given by Dr. Ravi, Dr.
    Baleshwar, Dr. Meenakshi, Dr. Nitesh, Dr. Rakesh of GTB
    Hospital, Ex.PA9, Ex.PA10, Ex.PA11, Ex.PA12, Ex.PA13 &
    Ex.PA14.

    (v) MLC of injured Urman dt. 06.07.2013 prepared by
    Dr. Meenakshi and nature of injuries was given by Dr. Nitesh,
    Ex.PA15.

    (vi) PM Report No. 903/2013 dt. 06.07.2013 of
    deceased Furkan prepared by Dr. Shalini Rajdan of GTB
    Hospital, Ex.PA16.

    In view of above-said admission, the requirement of
    evidence of following witnesses was dispensed with :

    Sl. no. Name of the witnesses

    1. Dr. Girish Chander Prabhat (at Sl. No. 26 in the list of
    witnesses)

    2. Dr. Ashish Tomar of GTB Hospital (at Sl. No. 22 in the
    list of witnesses)

    3. Dr. Aditya Chauhan of GTB Hospital (at Sl. No. 20 in
    the list of witnesses)

    4. Dr. Alok Chaudhary (at Sl. No. 19 in the list of
    witnesses)

    5. Dr. Ravi of GTB Hospital(at Sl. No. 23 in the list of
    witnesses)

    6. Dr. Baleshwar of GTB Hospital (at Sl. No. 25 in the list
    of witnesses)

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 4 of 44

    KUMAR Digitally signed
    by KUMAR RAJAT

    RAJAT 16:41:15 +0530
    Date: 2026.04.15

    7. Dr. Meenakshi of GTB Hospital (at Sl. No. 18 in the list
    of witnesses)

    8. Dr. Nitesh of GTB Hospital (at Sl. No. 21 in the list of
    witnesses)

    9. Dr. Rakesh of GTB Hospital (at Sl. No. 24 in the list of
    witnesses)

    10. Dr. Shalini Rajdan of GTB Hospital (at Sl. No. 27 in the
    list of witnesses)

    PROSECUTION EVIDENCE

    5. Prosecution examined thirty (30) witnesses in its
    favour to prove the case.

    6. PW1 SI Lalit Mohan deposed that on 05.07.2013, he
    was posted at PS Jafrabad as SI and he was on emergency duty
    from 8 AM to 8 PM and at about 6.10 PM, when he was on
    another call, he had received an information from DO about DD
    No. 30A, Ex.PW1/A that one five story building i.e. 12/1/72D,
    Main Road, Vijay Mohalla, Park Maujpur, Delhi, was about to
    collapse. He along with one constable reached at the spot where
    one PCR van was already present. SHO and ACP were also
    present there and some afratafri was going on. He saw that
    plaster of that house was waiving (lehra raha tha) and was about
    to fall. There were some cracks in the house, which was about to
    collapse. Some officials of MCD including Tehsildar Mr. Tarun,
    Executive Engineers namely Mr. A K Singh and Mr. O.P. Ojha
    and SDM Mr. Anil Kumar also reached there. They stopped the
    traffic and asked the officials of MCD to take action as per law.

    7. PW1 further deposed that MCD officials replied that
    they had already given notice to accused Mehrajuddin to

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 5 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:41:22 +0530
    demolish the above said under constructed building on its own,
    otherwise MCD would take action. Outer force was also installed
    for help. As his duty hours were complete at about 8 PM, so
    SHO/ACP relieved him from the spot. PW1 came back to his
    home. On 06.07.2013 at about 2 AM in the night, PW1 had
    received an information from DO and DD no. 48B dated
    06.07.2013, Ex.PW1/B was marked to him regarding collapse of
    abovesaid building. PW1 was also told that abovesaid DD had
    been sent to spot through Jogender. Thereafter, PW1 reached at
    the spot i.e. 12-A/107D, Jamalu Ka Bagh, Gali No. 1, Maujpur,
    Main Road No. 66, Delhi-53, where he saw many ambulances,
    PCR Vans, Police officials of MCD and forces were also present.

    Accused Mehrajuddin was also present on the spot and
    discussing with officials of MCD. 17 injured persons were
    shifted to hospital for medical treatment.

    8. PW1 further deposed that he had discussed the matter
    with SHO and other senior officers and Tehrir, Ex.PW1/C was
    prepared on DD No. 48-B. Rukka was handed over to Ct.
    Jogender for registration of FIR, who went to PS and got the FIR
    registered and handed over the same to IO/SHO Inspector Sudesh
    Ranga for further necessary action. On the direction of ACP/IO,
    PW1 got conducted the postmortem of dead body of deceased
    Furkan after he moved application for PM, Ex.PW1/D. PW1 also
    filled form 25.35, Ex.PW1/E. After the postmortem, dead body
    of deceased was identified by his brother Farhan and brother-in-
    law Mohd. Shakir vide memos, Ex.PW1/F and Ex.PW1/G. After
    the postmortem, dead body was handed over to them, vide

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 6 of 44

    KUMAR Digitally signed
    by KUMAR RAJAT

    RAJAT 16:41:27 +0530
    Date: 2026.04.15
    memo, Ex.PW1/H. Thereafter, PW1 came back to spot. PW1
    correctly identified accused Mehrajuddin in the Court.

    9. PW2 Parveen Kumar deposed that in the year 2013,
    he was working as Junior Engineer, Building 1 & 2, Shahdara
    North Zone, EDMC, Delhi. On 03.07.2013, he was suspended
    from the job. He did not remember the exact date or month, but
    perhaps in the month of June, 2013, on the instruction of
    Assistant Engineer, Sh. Arun Kumar Meena, PW2 visited
    property no. 12A/107B, Jamalu Ka Bagh, Main Road, Maujpur,
    which was in the jurisdiction of Building 2, Shahdara, North
    Zone. PW2 did not know the owner of said building and he never
    met him or his relatives. There was no file of said property in
    their office. Whenever they received any information about
    unauthorized constructions, they would take action u/s 343/344
    DMC Act. Action u/s 343/344 DMC Act is usually taken against
    new construction. They would visit the property and also send
    notice to its owner. During his visit, he found that minor repair
    like plaster etc. was going on at the abovesaid address. PW2
    informed about the status of the same to Assistant Engineer and
    there was no new construction. No written report was prepared
    by him in this case as no written instruction was given to him by
    Assistant Engineer. During his visit, he found that property was
    up to 3rd Floor starting from basement. On 03.07.2013, charge of
    Junior Engineer, Building 2 was taken over by N S Meena. Police
    interrogated him and he gave written reply, Ex.PW2/A in his
    handwriting.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 7 of 44

    Digitally signed
    by KUMAR

    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:41:33 +0530

    10. PW3 Birender Dutt deposed that in the year 2013, he
    was working as office in-charge, Building Department, Shahdara,
    North Zone, EDMC, Delhi. PW3 had been working in the said
    department since 2011. There was no file of property no.
    12A/107B, Jamalu Ka Bagh, Main Road, Maujpur in their office.
    Whenever, office received any information about unauthorized
    construction, AE and JE would take action u/s 343/344 DMC
    Act. Police interrogated PW3 and he gave written reply,
    Ex.PW3/A in his handwriting.

    11. PW4 Nabi Hasan deposed that in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW4 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. Accused Mehrajuddin was the owner of the
    building. On the intervening night of 05/06.07.2013, he was
    working at the abovesaid building and suddenly, it got collapsed
    due to which, PW4 received minor injury.

    12. PW5 Ikram deposed that in the month of July, 2013,
    he was working as a construction labour with contractor Furkan,
    who used to give money to PW5 and other labourers for their
    wages. During July, 2013, he along with some other labourers
    were working at a building situated at Jamalu Ka Baag, Gali No.
    1, Maujpur, Delhi on behalf of contractor Furkan. Accused
    Mehrajuddin was the owner of the building. On the intervening
    night of 05/06.07.2013, he was working at the abovesaid building
    and suddenly, it got collapsed due to which, PW5 received minor

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 8 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:41:39 +0530
    injury.

    13. PW6 SI Pramod deposed that on 06.07.2013, he was
    posted as HC at PS Jafrabad. On that day, he was working as DO
    and his working hours were from 12 midnight to 8 AM. On that
    day at about 1.54 AM, he registered the DD No. 4B, Ex.PW6/A
    (OSR). On that day at about 5.30 AM, Ct. Joginder came at the
    PS, Jafrabad and handed over the original rukka for registration
    of FIR on which, he made endorsement, Ex.PW6/B. PW6
    registered the FIR No. 211/2013, Ex.PW6/C (OSR) and handed
    over the same to Ct. Joginder.

    14. PW7 Iqbal deposed that in the month of July, 2013, he
    was working as a construction labour with contractor Furkan,
    who used to give money to PW7 and other labourers for their
    wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. Accused Mehrajuddin was the owner of the
    building. On the intervening night of 05/06.07.2013, he was
    working at the abovesaid building and suddenly, it got collapsed
    due to which, PW7 received injury on his chest and other body
    parts.

    15. PW8 Ehsaan deposed that in the month of July, 2013,
    he was working as a construction labour with contractor Furkan,
    who used to give money to PW8 and other labourers for their
    wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. Accused Mehrajuddin was the owner of the
    building. On the intervening night of 05/06.07.2013, he was

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 9 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:41:44
    +0530
    working at the abovesaid building and suddenly, it got collapsed
    due to which, PW8 received injury on his head and other parts of
    body.

    16. PW9 Nawab Ali deposed that in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW9 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. Accused Mehrajuddin was the owner of the
    building. On the intervening night of 05/06.07.2013, he was
    working at the abovesaid building and suddenly, it got collapsed
    due to which, PW9 received injury on his head and other parts of
    body. PW9 failed to identify the photographs of spot, Ex.P1.

    17. PW10 Akhtar deposed that on in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW10 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. Accused Mehrajuddin was the owner of the
    building. On the intervening night of 05/06.07.2013, he was
    working at the abovesaid building and suddenly, it got collapsed
    due to which, PW10 received injury on his back. PW10 admitted
    in the cross-examination of Ld. Addl. PP that contractor Furkan
    was also with them at the time of collapse of building and he was
    died in that collapse.

    18. PW11 Shamshul deposed that in the month of July,
    2013, he was working as a construction labour with contractor

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 10 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:41:49 +0530
    Furkan, who used to give money to PW11 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. Accused Mehrajuddin was the owner of the
    building. On the intervening night of 05/06.07.2013, he was
    working at the abovesaid building and suddenly, it got collapsed
    due to which, PW11 received injury on his back. PW11 admitted
    in the cross-examination of Ld. Addl. PP that contractor Furkan
    was also with them at the time of collapse of building and he was
    died in that collapse.

    19. PW12 Sonawar deposed that in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW12 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. On the intervening night of 05/06.07.2013,
    he was working at the abovesaid building and suddenly, it got
    collapsed due to which, PW12 received injury on his back. PW12
    admitted in the cross-examination of Ld. Addl. PP that contractor
    Furkan was also with them at the time of collapse of building and
    he was died in that collapse.

    20. PW13 Illyas deposed that in the month of July, 2013,
    he was working as a construction labour with contractor Furkan,
    who used to give money to PW13 and other labourers for their
    wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. On the intervening night of 05/06.07.2013,

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 11 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:41:54 +0530
    he was working at the abovesaid building and suddenly, it got
    collapsed due to which, PW13 received injury on his finger.
    PW13 admitted in the cross-examination of Ld. Addl. PP that
    contractor Furkan was also with them at the time of collapse of
    building and he was died in that collapse.

    21. PW14 Riyasat Hussain deposed that in the month of
    July, 2013, he was working as a construction labour with
    contractor Furkan, who used to give money to PW14 and other
    labourers for their wages. During July, 2013, they were working
    at a building situated at Jamalu Ka Baag, Gali No. 1, Maujpur,
    Delhi on behalf of contractor Furkan. On the intervening night of
    05/06.07.2013, he was working at the abovesaid building and
    suddenly, it got collapsed due to which, PW14 received injury on
    his back, head and hand and he was taken to GTB Hospital where
    he received treatment. Later on, PW14 came to know that
    contractor Furkan had died in the incident. PW14 admitted in the
    cross-examination of Ld. Addl. PP that contractor Furkan was
    also with him and others at the time of collapse of building.

    22. PW15 Urmaan Ali deposed that in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW15 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. On the intervening night of 05/06.07.2013,
    he was working at the abovesaid building and suddenly, it got
    collapsed due to which, PW15 received injury on his head and
    hand and he was taken to GTB Hospital where he received

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 12 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:41:59 +0530
    treatment. Later on, PW15 came to know that contractor Furkan
    had died in the incident. PW15 admitted in the cross-examination
    of Ld. Addl. PP that contractor Furkan was also with them at the
    time of collapse of building.

    23. PW16 Aslam deposed that in the month of July, 2013,
    he was working as a construction labour with contractor Furkan,
    who used to give money to PW16 and other labourers for their
    wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. On the intervening night of 05/06.07.2013,
    he was working at the abovesaid building and suddenly, it got
    collapsed due to which, PW16 received injury on his back and
    legs and he was taken to GTB Hospital where he received
    treatment. Later on, PW16 came to know that contractor Furkan
    had died in the incident. PW16 admitted in the cross-examination
    of Ld. Addl. PP that contractor Furkan was also with them at the
    time of collapse of building.

    24. PW17 Mohd. Yasin deposed that in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW17 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. On the intervening night of 05/06.07.2013,
    he was working at the abovesaid building and suddenly, it got
    collapsed due to which, PW17 received injury on his right arm
    and other parts of body. He was taken to GTB Hospital where he
    received treatment. Later on, PW17 came to know that contractor

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 13 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:42:04 +0530
    Furkan had died in the incident. PW17 admitted in the cross-
    examination of Ld. Addl. PP that contractor Furkan was also with
    them at the time of collapse of building.

    25. PW18 Abdul Hasan deposed that in the month of July,
    2013, he was working as a construction labour with contractor
    Furkan, who used to give money to PW18 and other labourers for
    their wages. During July, 2013, they were working at a building
    situated at Jamalu Ka Baag, Gali No. 1, Maujpur, Delhi on behalf
    of contractor Furkan. On the intervening night of 05/06.07.2013,
    he was working at the abovesaid building and suddenly, it got
    collapsed due to which, PW18 received injury on his left hand
    and other parts of body. He was taken to GTB Hospital where he
    received treatment. Later on, PW18 came to know that contractor
    Furkan had died in the incident. PW18 admitted in the cross-
    examination of Ld. Addl. PP that contractor Furkan was also with
    them at the time of collapse of building.

    26. PW19 Ahmad Sahid deposed that in the month of
    July, 2013, he was working as a construction labour with
    contractor Furkan, who used to give money to PW19 and other
    labourers for their wages. During July, 2013, they were working
    at a building situated at Jamalu Ka Baag, Gali No. 1, Maujpur,
    Delhi on behalf of contractor Furkan. On the intervening night of
    05/06.07.2013, he was working at the abovesaid building and
    suddenly, it got collapsed due to which, PW19 received injury on
    his right arm. He was taken to GTB Hospital where he received
    treatment. Later on, PW19 came to know that contractor Furkan
    had died in the incident. PW19 admitted in the cross-examination

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 14 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:42:09 +0530
    of Ld. Addl. PP that contractor Furkan was also with them at the
    time of collapse of building.

    27. PW20 Mohd. Ilyas deposed that in July, 2013, he
    was working as Executive Engineer, M-IV, Shahdara, EDMC,
    Delhi. On 05.07.2013, he issued a notice, Ex.PW20/A bearing
    no. EEM-IV/Shahdara North/2013-14/313, u/s 348 MCD Act,
    1947 to accused Mehrajuddin, owner of H.No. 12A/107D, Main
    66 Ft. Road, Maujpur, Ward No. 252, Delhi and one copy was
    pasted on said house and also sent to SHO, PS Jafrabad,
    Ex.PW20/B, accused Mehrajuddin, AE and Ex. En, MCD.

    28. PW21 Tarun Kumar deposed that in July, 2013, he
    was working as Tehsildar (Shahdara), Delhi and he was not
    present at the time of collapse of the building i.e. H.No.
    12A/107D, Main 66 Ft. Road, Maujpur,Ward No. 252, Delhi.
    PW21 reached the spot 11 hours (approx), after the collapse of
    building. As per the directions of SDM Shahdara, Sh. Anil
    Bhatnagar, he visited the spot and informed him about the
    incident. PW21 had submitted the written submissions on
    03.12.2021 before the Court.

    29. PW22 Satybir Singh deposed that on 05.07.2013, he
    was working as Sanitary Inspector/MCD Corporation, Shahdara
    North, Delhi. On that day, as per the directions of Deputy
    Commissioner/MCD Office, Shahdara North Zone, Delhi and his
    senior officials, he visited the building i.e. H.No. 12A/107D,
    Main 66 Ft. Road, Maujpur, Ward No. 252, Delhi at about 9-10
    PM. At that time, the aforesaid building was titled towards one
    side, but the same had not collapsed. PW22 returned from the

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 15 of 44
    Digitally
    signed by
    KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:42:15
    +0530
    spot and narrated the situation/status of building to his senior
    officials.

    30. PW23 SI Abhay Pal deposed that on 05.07.2013, he
    was posted as HC at PS Jafrabad. On that day, he was working as
    DO from 4 PM to 12 midnight. At about 5.50 pm, he registered
    DD no. 30A, Ex.PW1/A (OSR).

    31. PW24 ACP Anil Kumar deposed that on 25.05.2014
    and 20.06.2014, he made inquiries from Virender Dutt, In-charge
    Record (Building) and Praveen Kumar, JE (Building-II), MCD,
    Shahdara Zone, Delhi. Thereafter, he got transferred from PS
    Jafrabad.

    32. PW25 ACP Sudesh Ranga deposed that on
    06.07.2013, he was posted as Inspector/SHO at PS Jafrabad. On
    that day, after registration of present FIR, further investigation of
    the present case was marked to him. PW25 along with police
    staff went to the spot i.e. Premises No. 12A/107D, Jamalu ka
    Bagh, Gali No. 1, Maujpur, Delhi and prepared the site plan,
    Ex.PW25/A at the instance of 1st IO/SI Lalit Mohan and HC
    Praveen. PW25 got the spot photographed through a private
    photographer. PW25 correctly identified the spot i.e. aforesaid
    building Premises No. 12A/107D, Jamalu ka Bagh, Gali No. 1,
    Maujpur, Delhi in 12 photographs, Ex.P1 (colly). Thereafter he
    received information that one injured Furkan had been declared
    brought dead at GTB Hospital. PW25 added offence u/s 304 IPC
    in the present case and he searched accused Mehrajuddin, but in
    vain. PW25 went to the GTB Hospital and collected the MLCs of
    other injured persons.

    
    
    State Vs. Mehrajuddin        FIR No. 211/2013    PS Jafrabad             Page 16 of 44
    
    
    
                                                                                      Digitally
                                                                                      signed by
                                                                                      KUMAR
                                                                             KUMAR    RAJAT
                                                                             RAJAT    Date:
                                                                                      2026.04.15
                                                                                      16:42:20
                                                                                      +0530
    

    33. PW25 further deposed that in the MLC No. D1 dt.
    06.07.2013 of injured Illyas, the doctor opined the injuries as
    grievous in nature. On the MLCs of other injured persons i.e.
    from D2 to D14, the doctor opined the nature of injuries as
    simple in nature. PW25 got conducted the postmortem of
    deceased Furkan at the mortuary of GTB Hospital through SI
    Lalit Mohan and the dead body was handed over to brother of
    deceased namely Farhaan. Thereafter, PW25 searched accused
    Mehrajuddin, but in vain. On 06.07.2013, he recorded the
    statements of HC Praveen, Ct. Joginder, HC Rampal, injured
    persons namely Mohd. Akhtar, Shamshul, Samad, Sanovar,
    Illyas, Nabi Hasan, Ikram, Iqbal, 1st IO/SI Lalit Mohan u/s 161
    Cr.PC. On 11.07.2013, he recorded the statement of injured
    Mohd. Yasin and on 25.07.2013, he recorded the statements of
    injured persons namely Nawab Ali, Abdullah Hasan, Mohd.
    Ehsan, Urmaan Ali, Riyasat Husain, Ahmad Shahid and Aslam
    u/s 161
    Cr.PC.

    34. PW25 further deposed that he collected the PM
    Report of deceased Furkan. Accused Mehrajuddin moved his
    anticipatory bail application, but the same was dismissed by
    Hon’ble Sessions Court. Thereafter, accused Mehrajuddin filed
    anticipatory bail before Hon’ble High Court on the ground that
    he had given compensation to the family members of deceased
    Furkan and other injured persons. As per the directions of
    Hon’ble High Court, he verified that fact from the injured
    persons and relative of deceased. PW25 collected the copy of
    receipts (attested by him) from injured Nabi Husan, Ikram, Iqbal,

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 17 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:42:26
    +0530
    Abdul Hasan, Nawab Ali, Ehsan, Urmaan, Riyasat, Mohd.
    Akhtar, Samad, Mohd. Yaseen (relative of deceased Furkan),
    Mohd. Illyas and Mohd. Aslam, Ex.PW25/B, Ex.PW25/C,
    Ex.PW25/D, Ex.PW25/E, Ex.PW25/F, Ex.PW25/G, Ex.PW25/H,
    Ex.PW25/I, Ex.PW25/J, Ex.PW25/K, Ex.PW25/L, Ex.PW25/M
    and Ex.PW25/N respectively.

    35. PW25 further deposed that on 10.07.2013, he served a
    notice u/s 91 Cr.P.C. bearing no. 1235 dt. 10.07.2013 seeking
    certain details about the above said building, to the MCD, North
    Zone, Shahdara, Delhi. In reply to the same, Deputy Assessor
    and Collector, Shahdara (North Zone) MCD gave his written
    reply, Ex.PW25/O along with copy of property tax return,
    Ex.PW25/P. On 24.07.2013, he served a notice u/s 91 Cr.P.C.,
    Ex.PW25/Q to the Executive Engineer (MCD).

    36. PW25 further deposed that on 30.07.2013, he came to
    know about the name and mobile number of MCD official
    namely Praveen and Virender Dutt from the reply of MCD
    officials and came to know that no record was available in their
    office regarding the aforesaid building. On 05.08.2013 and
    07.08.2013, he interrogated the MCD official namely Virender
    Dutt and Praveen Kumar vide interrogation report Ex.PW3/A and
    Ex.PW2/A respectively.

    37. PW25 further deposed that Praveen Kumar (JE)
    disclosed that from 10.06.2013 to 14.06.2013, the aforesaid
    building was inspected by them, but no written report was
    prepared by them. During investigation, PW25 analyzed the call
    details of mobile of accused Mehrajuddin and that of Virender

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 18 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:42:31
    +0530
    Dutt (In-charge record), Praveen Kumar (JE), AS Meena (AE)
    and OP Ojha (Ex.En.), but nothing incriminating came on record.
    On 13.08.2013, accused got anticipatory bail from the Hon’ble
    High Court. On 22.08.2013, accused Mehrajuddin was arrested
    by PW25 vide arrest memo, Ex.PW25/R and released on bail
    (anticipatory). Personal search of accused Mehrajuddin was also
    conducted vide memo, Ex.PW25/S. PW25 collected the copy of
    log book (police control room/NE), Ex.PW25/T. Thereafter, he
    got transferred from PS Jafrabad. PW25 correctly identified
    accused Mehrajuddin in the Court.

    38. PW26 Inspector Brijesh Malik deposed that on
    06.04.2020, he was posted as ATO, PS Jafrabad. On that day,
    further investigation of the present case was marked to him and
    he collected the case file from MHC(R). On 23.11.2020, he
    served a notice u/s 91 Cr.P.C., Ex.PW26/A to accused
    Mehrajuddin and on 26.11.2020, he submitted his written reply
    to him, Ex.PW26/B. Along with reply, accused Mehrajuddin
    produced photocopy of structure work, copy of Aadhar Card,
    photocopy of ownership proof of H. No. 12A/107D, Jamalu ka
    Bagh, Gali No. 1, Maujpur, Delhi, Ex.PW26/C, Ex.PW26/D and
    Ex.PW26/E respectively. During investigation, he inspected the
    above said spot and at that time, it was built up to 2 floors and at
    the ground floor, there was a garment shop and the aforesaid
    building was being looked after by nephew of accused namely
    Faisal in 2020. Accused Mehrajuddin was interrogated and he
    disclosed that there was no written agreement between him and
    deceased Furkan and it was merely an oral agreement and there

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 19 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:42:36 +0530
    was only structure work mentioned on a plain paper, Ex.PW26/C.

    39. PW26 further deposed that after completion of
    investigation, he came to conclusion that accused Mehrajuddin
    was the owner of aforesaid building and on the day of incident,
    deceased Furkan started demolishing/pulling down work through
    his worker at his instance and there was no enough light at the
    spot at the time of demolition. There was no civil engineer/expert
    present at the spot at the time of incident and there were no use
    of security equipments at the spot for the purpose of demolition.
    PW26 prepared the charge-sheet and submitted before the Court.

    40. PW27 ACP Rajesh Sharma deposed that on
    13.01.2019, he was posted as ATO/Inspector at PS Jafrabad. On
    that day, further investigation of the present case was marked to
    him. PW27 collected the case file from MHC(R). PW27 made
    efforts to interrogate the MCD officials namely Virender and
    Praveen, but their presence/place of posting could not be found
    even after making efforts at MCD Office, Shahdara Zone, Delhi.

    41. PW28 Retd. SI Rampal deposed that on 26.05.2013,
    he was posted as HC at PS Jafrabad. On that day, he was on
    patrolling duty and when he reached near H. No. 12A/107D,
    Jamalu ka Bag, Gali No. 1, Maujpur, Main Road 66, Delhi, he
    saw that unauthorized construction was going on at above said
    house and the basement and ground floor of the above said house
    were appearing to be old construction and the first floor of the
    building was appearing to be new construction. Further
    construction was going on at the 2nd floor of said building.
    Accused Mehrajuddin was the owner of building and also present

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 20 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:42:41
    +0530
    there, but he failed to produce any permission of MCD regarding
    the construction work. PW28 gave information regarding
    unauthorized construction at MCD telephonically vide complaint
    no. 372 dt. 26.05.2013. PW28 filled the form regarding
    unauthorized construction and handed over the same to Reader of
    SHO, PS Jafrabad and disclosed about the present situation.
    PW28 recorded information regarding that unauthorized
    construction in rojnamcha vide diary no. 20B dt. 26.03.2013,
    Ex.PW28/A.

    42. PW28 further deposed that SHO of PS Jafrabad also
    gave information vide DD No. 67-UC dt. 28.05.2013 at the office
    of Executive Engineer, North Zone Shahdara, MCD Delhi and at
    the office of SDM Shahdara on 29.05.2013. On 05.07.2013, in
    the evening one PCR call was received regarding the cracks in
    the above said building and PW28 reached the said building and
    cordoned it with the help of police staff and restricted the
    movement of public persons near the above said building in order
    to prevent any mishappening. He also got vacated the adjoining
    buildings. MCD officials also reached at the above said building,
    who gave notice to accused Mehrajuddin, which was received by
    his nephew namely Faisal and warned accused Mehrajuddin to
    take necessary action. SHO Sudesh Ranga objected accused
    Mehrajuddin as he was demolishing the building through
    labourers and it was the duty of MCD official to demolish the
    building, but accused Mehrajuddin started demolishing the above
    said building even in the presence of MCD officials.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 21 of 44

    Digitally signed

    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:42:47 +0530

    43. PW28 further deposed that at about 01:45 -02:00 am,
    one large portion of above said building fell down and PW28
    called 100 number from his mobile phone, upon which fire
    brigade and reserved force of HRD-1 reached there and started
    the rescue work. IO prepared the site plan, Ex.PW25/A at his
    instance. IO recorded his statement. PW28 correctly identified
    accused Mehrajuddin in the Court.

    44. It is further in evidence against you that PW29 ASI
    Parveen Kumar deposed that he was working as Reader to SHO
    PS Jafrabad, Delhi. PW29 had brought copy of order bearing no.
    19185/HAR/NE dt. 12.07.2024, Ex.PW29/A passed by ACP
    Headquarters regarding the destruction of old record i.e. record
    pertaining year upto 31.12.2020, PS Jafrabad. Hence, the relevant
    record pertaining to the present case could not be produced due
    to destruction/weeding out of the said record upto year 2020 of
    PS Jafrabad.

    45. PW30 SI Praveen Kumar deposed that on 05.07.2013,
    he was working as HC at PS Jafrabad. On that day, he was on
    night emergency duty from 8 PM to 8 AM. At about 2 AM, he
    received DD no. 4B dated 06.07.2013 by Ct. Joginder regarding
    the fall of building. He along with Ct. Joginder immediately
    reached at the spot i.e. Building no. 12A/107-D, Gali no. 10,
    Jamalu Ka Bagh, Main 66 Feet Road, Maujpur, Delhi where the
    police staff of PS Jafrabad was already present and the traffic was
    already cordoned of near the abovesaid building. He found that
    the upper most roof had fallen down. IO/Inspector Sudesh Ranga,
    SI Lalit Mohan and other police staff of PS Jafrabad were present

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 22 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:42:52
    +0530
    there and started the rescue work. PW30 along with Ct. Joginder
    and SI Lalit went to GTB Hospital and CAT Ambulance carrying
    injured persons. In the hospital, 15 persons were found in injured
    condition and one Furkan was found to be brought dead, but his
    relatives took him to some other hospital in a Santro Car.

    46. PW30 further deposed that one injured Navi Hussain
    did not receive any visible injury as per the examination of
    doctor. One Mohd. Yaseen was admitted at Trauma Centre, ISBT.
    PW30 correctly identified photographs Ex. P1 (Colly) as
    belonging to the abovesaid building.

    STATEMENT OF ACCUSED u/s 351 BNSS

    47. Statement of accused Mehrajuddin was recorded u/s
    351
    BNSS on 28.03.2026 and he denied the incriminating
    evidence put to him. He stated that those witnesses are interested,
    false and planted witnesses. It is a false case and he has been
    charge-sheeted in this case only on the basis of that he was the
    owner of the property although there was no overt act or
    negligence in any manner on his part and he was not responsible
    for the fall of the building. After the incident, being the owner of
    the building on humanitarian ground, he gave compensation to
    all the injured and family of the deceased, although he had no
    role in any manner in the collapse of the building. He is innocent
    person and praying for acquittal as he was falsely implicated in
    the present case.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 23 of 44

    Digitally signed
    by KUMAR

    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:42:58 +0530
    APPRECIATION OF EVIDENCE,
    ANALYSIS OF WITNESSES AND FINDING
    ARGUMENTS OF LD. COUNSEL FOR ACCUSED

    48. It is argued by Ld. counsel for accused that he has
    been falsely implicated by the police and he was the owner of the
    building, which got collapsed and there was no negligence on his
    part in the demolition or fall of building. He was not present at
    the spot when the building had fallen down or a day before when
    building was surrounded by the police including SHO and ACP,
    MCD officials, officials of DC Office and concerned SDM and it
    was the duty of the MCD to demolish the said building as per the
    prescribed procedure and there was no liability of accused to
    demolish the same. Accused had not instructed contractor Furkan
    or other labours to demolish the said building and all the
    labourers have not deposed against the accused and turned
    hostile. Accused was never served with any notice by the MCD
    for demolition of said property and witnesses of MCD have
    deposed that there was no new construction noticed by them.

    PW1 stated deposed that it was the MCD officials, who insisted
    upon demolition of building by contractor Furkan with labour
    and it was only on the directions of MCD Officials, the building
    was started to be demolished by Furkan and not on the directions
    of accused Mehrajuddin, who was even not present on the spot
    and no notice u/s 343/344 DMC Act was issued to the accused
    for unauthorized construction. None of the public witnesses
    identified the accused. There was no mens rea on the part of
    accused. The prosecution failed to prove its case beyond

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 24 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    16:43:03 +0530
    reasonable doubt against the accused. Ld. Counsel for accused
    filed the written arguments along with judgments.

    1. Baldev Raj Kapur Vs. State, Crl. Rev. (P). 431/2005 and Crl.
    M A No. 5436/05 dated 06.02.2009.

    2. Yuvraj Laxmilal Kanther & Anr. Vs. State of Maharashtra,
    2025 INSC 338.

    3. Gulijeet Singh Kochar & Anr. Vs. State, 121 (2005) DLT 516.

    ARGUMENTS OF LD. ADDL. PP FOR THE STATE

    49. Ld. Addl. PP for State has argued that prosecution has
    proved its case against the accused beyond reasonable doubt as
    accused was doing the unauthorized construction as earlier the
    building was made upto basement and ground floor and the
    structure of the building became weak due to unauthorized
    construction of some upper floors as he had not taken the
    permission from the MCD and all the public witnesses despite
    their hostility have categorically deposed that they received
    injury in the incident of fall of building and contractor Furkan
    succumbed to his injuries and died. MCD had given notice to
    him for pulling down the said unauthorized building. The
    accused was negligent in the construction of said building and he
    directed contractor Furkan and other labour to demolish the
    building despite the same being tilted and his presence at the spot
    was proved by PW1, PW25 IO and PW28. The accused
    knowingly failed to take precautionary and safety measures,
    which resulted in causing of injuries to the injured lobours, which
    could have caused their death and the same resulted in death of
    contractor Furkan. Death of Furkan is proved from his PMR and

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 25 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:43:08 +0530
    IO and other witnesses have supported the case of prosecution.

    50. I have heard the rival contentions and perused the
    records.

    51. The prosecution has examined 30 witnesses to prove
    its case including complainant/victim.

    52. The charge against accused persons is u/s
    288/308/304 IPC.

    Section 308 IPC. Attempt to commit culpable
    homicide-

    “Whoever does any act with such intention or knowledge
    and under such circumstances that, if he by that act caused death,
    he would be guilty of culpable homicide not amounting to murder,
    shall be punished with imprisonment of either description for a
    term which may extend to three years, or with fine, or with both;
    and, if hurt is caused to any person by such act, shall be punished
    with imprisonment of either description for a term which may
    extend to seven years, or with fine, or with both.”

    Section 288 IPC. Negligent conduct with respect
    to pulling down or repairing buildings-

    “Whoever, in pulling down or repairing any building,
    knowingly or negligently omits to take such order with that
    building as is sufficient to guard against any probable danger to
    human life from the fall of that building, or of any part thereof,
    shall be punished with imprisonment of either description for a
    term which may extend to six months, or with fine which may
    extend to one thousand rupees, or with both”.

    The charge against the accused persons is u/s 304
    IPC. Culpable homicide is explained in Section 299 IPC.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 26 of 44

    Digitally signed
    by KUMAR

    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:43:13 +0530
    Section 299 IPC Culpable Homicide:

    “Whoever causes death by doing an act with the intention of
    causing death, or with the intention of causing such bodily injury
    as is likely to cause death, or with the knowledge that he is likely
    by such act to cause death, commits the offence of culpable
    homicide’.

    53. The present case was registered after fall of building
    situated at Jamalu Ka Bagh, Gali No. 1, Maujpur, Delhi on
    06.07.2013 at about 1.54 AM, which resulted in death of the
    contractor Furkan and injuries to the labours, who were
    demolishing the said building.

    The following issues/facts needs to be decided to
    prove the charge against the accused i.e.
    Q.1 Whether accused was negligent in pulling down or
    repairing the building in question so as to cause danger to human
    life?

    Q.2 Whether accused directed contractor Furkan or labour
    to pull down the tilted unauthorized building without proper
    precautionary and safety measures having knowledge that the
    labour could sustain the injuries or they might die, if the building
    had fallen?

    Q.3 Whether due to the negligent act of accused in taking
    proper precautionary and safety measures in pulling down of said
    building, 15 labours sustained grievous/simple injuries and
    contractor Furkan died?

    PUBLIC WITNESSES/INJURED

    54. PW4 Nabi Hasan, PW5 Iqram, PW7 Iqbal, PW8
    Ehsan, PW9 Nawab Ali, PW10 Akhtar and PW11 Shamshul

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 27 of 44

    KUMAR Digitally signed
    by KUMAR RAJAT

    RAJAT Date: 2026.04.15
    16:43:18 +0530
    have deposed that in July, 2013, they were working as
    construction labour with contractor Furkan at a building Jamalu
    Ka Bagh, Gali No. 1, Maujpur, Delhi on behalf of Furkan and on
    the intervening night of 05/06.07.2013, the said building had
    collapsed and its owner was accused Mehrajuddin. PW Nabi
    Hasan and Iqram suffered minor injury. PW Ehsan and Nawab
    Ali received injuries on their head and other parts. PW Shamshul
    and Akhtar received injuries on their back and PW Iqbal received
    injury on his chest.

    55. All these witnesses turned hostile and during cross-
    examination by Ld. APP they denied that the cracks appeared in
    the aforesaid building in the evening of 05.07.2013 and someone
    had called 100 number and police came there and vacated the
    said building or that on 06.07.2013, accused Mehrajuddin stated
    that they had to demolish the said building and they replied that
    if said building had cracks, which were dangerous, but accused
    stated that they had to work, if they wanted to get their dues or
    that Furkan was with them at the time of collapse of building.
    PW4 Nabi Hasan, PW5 Iqram, PW7 Iqbal, PW8 Ehsan, PW9
    Nawab Ali, PW10 Akhtar and PW11 Shamshul stated these facts
    even though they were confronted with their respective
    statements u/s 161 Cr.P.C., Ex.PW4/A, Ex.PW5/A, Ex.PW7/A,
    Ex.PW8/A, Ex.PW9/A, Ex.PW10/A and Ex.PW11/A, by Ld.
    APP and did not support the case of prosecution.

    56. PW12 Sonawar, PW13 Iliyas, PW14 Riyasat Hussain,
    PW15 Urman Ali, PW16 Aslam, PW17 Mohd. Yaseen, PW18
    Abdul Hasan and PW19 Ahmad Sahid deposed that in July, 2013,

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 28 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:43:22 +0530
    they were working as construction labour with contractor Furkan
    at a building Jamalu Ka Bagh, Gali No. 1, Maujpur, Delhi on
    behalf of Furkan and on the intervening night of 05/06.07.2013,
    the said building had collapsed. PW Sonawar and Iliyas received
    injuries on their back and finger respectively. PW Riyasat
    Hussain and Urman Ali received injuries on their head and hand
    respectively. PW Aslam and Yasin received injuries on their
    back/legs and right arm respectively. PW Abdul Hasan and
    Ahmad Sahid received injuries on their left hand and right arm
    respectively.

    57. All these witnesses turned hostile and during cross-
    examination by Ld. APP, they admitted that contractor Furkan
    was with them at the time of collapse of building and he died in
    the said collapse, which is contrary to the testimonies of PW4
    Nabi Hasan, PW5 Iqram, PW7 Iqbal, PW8 Ehsan, PW9 Nawab
    Ali, PW10 Akhtar and PW11 Shamshul, who deposed that
    contractor Furkan was not with them at the time of collapse.

    58. PW 12, PW13, PW14, PW15, PW16, PW17, PW18
    and PW19 denied that accused Mehrajuddin was the owner of the
    said building, which is contrary to testimonies of PW4, PW5,
    PW7, PW8, PW9, PW10 and PW11, who have stated so.

    59. PW 12, PW13, PW14, PW15, PW16, PW17, PW18
    and PW19 denied that the cracks appeared in the aforesaid
    building in the evening of 05.07.2013 and someone had called
    100 number and police came there and vacated the said building
    or that accused Mehrajuddin stated that they had to demolish the
    said building and they replied that the said building had cracks,

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 29 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:43:28 +0530
    which were dangerous, but accused stated that they had to work,
    if they wanted to get their dues. PW 12, PW13, PW14, PW15,
    PW16, PW17, PW18 and PW19 stated these facts even though
    they were confronted with their statements u/s 161 Cr.P.C.,
    Ex.PW12/A, Ex.PW13/A, Ex.PW14/A, Ex.PW15/A,
    Ex.PW16/A, Ex.PW17/A, Ex.PW18/A and Ex.PW19/A by Ld.
    APP and did not support the case of prosecution.

    60. PW4 Nabi Hasan, PW5 Iqram, PW7 Iqbal, PW8
    Ehsan, PW9 Nawab Ali, PW10 Akhtar, PW11 Shamshul, PW12
    Sonawar, PW13 Iliyas, PW14 Riyasat Hussain, PW15 Urman
    Ali, PW16 Aslam, PW17 Mohd. Yaseen, PW18 Abdul Hasan and
    PW19 Ahmad Sahid have not deposed at all that accused
    Mehrajuddin told them to demolish the said building on the
    intervening night of 05/06.07.2013. Rather, in their respective
    cross-examinations by accused, PW10 Akhtar, PW11 Shamshul,
    PW12 Sonawar, PW13 Iliyas, PW14 Riyast Hussain, PW15
    Urman Ali, PW16 Aslam, PW17 Mohd. Yaseen, PW18 Abdul
    Hasan and PW19 Ahmad Shahid admitted that before the
    collapse of building several police and MCD officials were
    present at the spot and on their asking, Furkan told them to enter
    the building and demolish it.

    61. Thus, from the testimonies of said public/injured
    witnesses, it is not proved that deceased Furkan or other labours,
    who suffered injuries entered the said building for pulling it
    down on the directions of accused Mehrajuddin, rather they had
    demolished it on the directions of police and MCD officials and
    as such it is difficult to hold accused liable for negligence in

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 30 of 44

    Digitally signed
    KUMAR by KUMAR
    RAJAT
    RAJAT Date: 2026.04.15
    pulling down of building in question and consequently causing
    death to contractor Furkan and injuries to labours i.e. abovesaid
    PWs.

    OFFICIAL WITNESSES

    62. PW2 Praveen Kumar, JE, EDMC, Shahdara, North
    Zone, Delhi deposed that in June, 2013, on the instructions of AE
    concerned, he visited property 12A/107B, Jamalu Ka Bagh, Main
    Road, Maujpur, Delhi in his jurisdiction and observed that it was
    built upto 3rd floor from basement and minor repairs like plaster
    etc. were going on, but there was no new construction and he did
    not prepare any written report. He did not know its owner. He
    gave his written reply to IO, Ex.PW2/A and that whenever they
    received any information about any unauthorized construction,
    they take action u/s 343/344 DMC Act, which is usually taken
    against new construction. There was no file pertaining to said
    property in their office.

    63. PW3 Virender Dutt also corroborated the version of
    PW2 that there was no file pertaining to said property and proved
    his reply, Ex.PW3/A. From the testimonies of these witnesses, it
    is apparent that there was only minor repair work being carried
    out and no notice for unauthorized construction was issued by the
    MCD to accused Mehrajuddin.

    64. PW20 Mohd. Iliyas, who was Executive Engineer in
    EDMC in July, 2013 deposed that he issued a notice u/s 348
    DMC Act to its owner of said building Mehrajuddin, Ex.PW20/A
    and it was also pasted on said building, Ex.PW20/B bearing
    signature of accused Mehrajuddin. The said notice was issued

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 31 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:43:39 +0530
    only on 05.07.2013 when the building was tilted and cordoned of
    by the police and MCD officials and no notice was issued prior to
    that and in the cross-examination of PW20, he admitted that it
    was received by someone else on behalf of accused Mehrajuddin
    and not the accused was directly served himself, which shows
    that Mehrajuddin may or may not be having knowledge of said
    notice and otherwise also, the said notice becomes irrelevant,
    being issued after the building was already taken over by police
    and MCD officials and no time is mentioned in the said notice.

    65. PW21 is Tahsildar Shahdara, who deposed that he was
    not present at the spot at the time of collapse and visited the spot
    after incident and thus, his testimony is not relevant.

    66. PW22 Satyabir Singh, Sanitary Inspector, MCD
    deposed that he visited said building on 05.07.2013 between 9-10
    PM, when it was tilted towards one side. His testimony only
    proved that the building was tilted on 05.07.2013, which is not
    disputed.

    MEDICAL EVIDENCE

    67. The accused admitted the MLCs of injured Yaseen,
    Ex.PA1, Sanawar, Ex.PA9 and Iliyas, Ex.PA10, which were
    grievous in nature and that of Abdul Hasan, Ex.PA2, Nawab Ali,
    Ex.PA3, Aslam, Ex.PA4, Mohd. Akhtar, Ex.PA5, Mohd.

    Samshul, Ex.PA6 Ahmad Sahid, Ex.PA7, Mohd. Samad, Ex.PA8,
    Riyasat Ali, Ex.PA11, Ehsan, Ex.PA12, Mohd. Iqbal, Ex.PA13,
    Mohd. Iqram, Ex.PA14 and Urmaan Ali, Ex.PA15. It proves that
    these persons suffered injuries in the collapse of building, but
    they have not uttered a single word against accused Mehrajuddin

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 32 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:43:44
    +0530
    in their testimonies that they were working on his instructions or
    that accused forced them to pull down said building for wages
    and thus, this medical evidence does not prove the charge against
    the accused.

    68. Accused also admitted the PMR of deceased Furkan,
    Ex.PA16 in which there are 22 ante-mortem injuries and cause of
    death is shock as a result of ante-mortem injury to cervical
    vertebral column produced by blunt force impact. The death of
    Furkan is not disputed, but it has come in the testimony of
    witnesses that it was the MCD and police officials, which forced
    Furkan and other labour/PWs to demolish the building and not
    accused Mehrajuddin and during demolition, building fell flat
    resulting into death of Furkan.

    POLICE WITNESSES

    69. PW1 SI Lalit Mohan Singh proved DD No. 30A,
    Ex.PW1/A in which it is recorded that said building was about to
    collapse, which is corroborated by PW23 SI Abhay Pal. PW1
    reached the spot and saw that plaster was about to fall and there
    were some cracks and building was about to collapse and
    Tahsildar, Executive Engineer of MCD and SDM reached there
    and police stopped the traffic and asked MCD to take action as
    per law and they stated that they had already issued notice to
    demolish the said building on its own, else MCD would take
    action. The said notice was allegedly issued on 05.07.2013 itself
    and not prior to that, so it was the duty of MCD to take over the
    tilted building, which was about to collapse, in their possession
    and get it demolished as per the prescribed norms after taking

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 33 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:43:49 +0530
    necessary precautions, rather MCD officials had directed the
    accused Mehrajuddin to demolish the building on its own, which
    shows the negligence on the part of police and MCD, rather than
    accused.

    70. PW1 in his cross-examination admitted that MCD is
    the proper authority in Delhi to declare any building as illegal or
    unauthorized and whether it is to be demolished or not, but in this
    case, the relevant notice for declaring it illegal/unauthorized, was
    issued when all the authorities came at the spot after the building
    was tilted on 05.07.2013 i.e. a day prior to its collapse and PW2
    and PW3 have categorically deposed that there was no file
    pertaining to unauthorized construction of said building in the
    office of MCD. PW1 further stated that ACP, DCP, MCD Staff,
    SDM, Tahsildar and other officials of DCP office also reached
    there and concerned ACP asked MCD and DC Staff to carry out
    the demolition as it required special technique/skill for
    demolition, but MCD official insisted upon demolition of same
    by contractor Furkan with his labour, which proves that accused
    Mehrajuddin had not directed Furkan and labour to demolish the
    building, rather MCD officials insisted them to do so.

    71. PW1 in his examination in chief deposed that
    Mehrajuddin was present at spot, but in the cross-examination, he
    stated that he was not present, which are contrary versions. PW1
    proved the Tahrir, Ex.PW1/C and his application for postmortem,
    Ex.PW1/D and that dead body of Furkan was identified by his
    brother Farhan and relative Mohd. Shakir, vide memo, Ex.PW1/F
    and Ex.PW1/G, but the same is not disputed.

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 34 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:44:00
    +0530

    72. PW6 SI Pramod proved DD No. 4B dated
    06.07.2013, Ex.PW6/A, his endorsement on rukka, Ex.PW6/B
    and registration of FIR, Ex.PW6/C and Ex.PW6/A is corrborated
    by PW30 regarding fall of building, but that is not disputed by
    accused and does not prove the offence against the accused.

    73. Testimonies of PW24 ACP Anil Kumar, PW27 ACP
    Rajesh Sharma and PW29 ASI Praveen are irrelevant as they
    have not deposed anything against accused nor produced any
    document and PW29 produced the destruction of old record
    order, Ex.PW29/A.

    74. PW30 reached the spot and saw that upper roof had
    fallen down and Inspector Sudesh Ranga, PW1 Lalit Mohan and
    other police of PS Jafrabad were present there and injured were
    shifted to GTB and one Furkan was dead and he identified the
    said building in the photographs, Ex.P1. He has not deposed
    against accused.

    75. PW28 SI Rampal deposed that on 26.05.2013, he saw
    unauthorized construction at the said building, which was an old
    construction and only first floor was newly constructed and
    construction was going on at second floor and its owner was
    Merajuddin, who failed to produce any permission from MCD
    and he gave information to MCD telephonically and recorded the
    information vide DD no. 20B, Ex.PW28/A. Despite the
    intimation by PW28, no notice was given by MCD to the accused
    nor they declared the building unauthorized/illegal.

    76. PW28 also deposed that SHO Sudesh Ranga objected
    accused Merajuddin as he was demolishing the building through

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 35 of 44

    Digitally
    signed by
    KUMAR KUMAR
    Date:

    RAJAT

    RAJAT 2026.04.15
    16:44:06
    +0530
    labours and it was duty of MCD to demolish the building, but he
    started demolishing the same in the presence of MCD officials,
    but version of PW28 is contrary to the testimony of PW1, who
    stated that it was the MCD officials, who insisted upon
    demolition of said building by contractor Furkan with his labour.

    77. In his cross-examination, PW28 admitted that he
    never visited the building after 26.05.2013 till its collapse and
    that it is the duty of MCD to visit, inspect and verify new
    construction or to take further action for unauthorized
    construction and he stated that accused Mehrajuddin was not
    present on 05.07.2013 at the abovesaid building and notice was
    given to his nephew Faisal, which shows that Mehrajuddin was
    not aware of the notice as it cannot be presumed that Faisal had
    told about the notice to Mehrajuddin and PW28 also admitted
    that it was a duty of MCD to demolish the building due to its
    knowledge and expertise and SHO, Jafrabad asked MCD
    officials to do the demolition, but MCD pressurized Furkan to
    demolish the same with his labours and thus, the version of
    PW28 is self-contradictory and from his testimony it becomes
    highly doubtful that accused Mehrajuddin asked Furkan and his
    labour to demolish the said building.

    78. PW25 ACP Sudesh Ranga IO of this case deposed
    that he recorded the statements of all the injured persons and
    collected their MLCs, whose injuries were grievous and simple
    and got conducted post-mortem of Furkan, but all the injured had
    turned hostile and death of Furkan is not disputed and that during
    investigation, he came to know that there was no office record

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 36 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:44:13 +0530
    pertaining to said building in the MCD record and nothing
    incriminating was found from the CDR of mobile of accused
    Mehrajuddin and accused was arrested formally vide arrest
    memo, Ex.PW25/R after his anticipatory bail and nothing
    incriminating was recovered from his personal search,
    Ex.PW25/S and he proved the site plan, Ex.PW25/A and
    identified the photographs of spot, Ex.P1, but the spot is not
    disputed.

    79. In the cross-examination of PW25, he admitted that he
    interrogated accused vide memo, Ex.PW25/DX1 and he could
    not produce the documents and he stated that demolition was got
    started at the instance of Ex.En. and there was no CDR or
    location chart of Mehrajuddin on record, which makes it doubtful
    that he was on the spot or not. PW25 proved that all the injured
    received the compensation from the accused after making inquiry
    on the directions of Hon’ble High Court.

    80. PW26 proved the notice u/s 91 Cr.P.C. to accused,
    Ex.PW26/A to provide the ownership documents and agreement
    with Furkan to pull down the building and permission from MCD
    for construction, but that notice was issued on 23.11.2020 i.e.
    after many years of incident and there can be no agreement
    between Furkan and accused for demolition of said building as
    prosecution witnesses have deposed that it was demolished by
    Furkan at the instance of MCD officials and there is no
    ownership paper of the said building in the name of accused,
    which belonged to his forefather and he replied the same vide
    Ex.PW26/B and the said property was being looked after his

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 37 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:44:19 +0530
    nephew Faisal in 2020, but Faisal was not made a witness. PW26
    deposed that Furkan started demolition of said building at the
    instance of accused, but he got associated with this case in 2020
    and the incident was of 2013 and he was not present at the spot at
    the time of incident and version of PW26 is contrary to the
    versions of PW in this regard, PW4, PW5, PW7, PW8, PW9,
    PW10, PW11, PW12, PW13, PW14, PW15, PW16, PW17,
    PW18 and PW19, so his opinion is not based on complete facts
    and is controverted by the other prosecution witnesses and he
    admitted that he has not verified the signatures of accused on
    structure work, Ex.PW26/C from the expert.

    CRIMINAL NEGLIGENCE

    81. Meaning of ‘negligence’. Though the term ‘negligence’
    has not been defined in the Code, it may be stated that negligence
    is the omission to do some thing which a reasonable man, guided
    upon those considerations which ordinarily regulate the conduct
    of human affairs would do, or doing something which a
    reasonable and prudent man would not do.”

    Negligence is a fault to do something which sensible
    and responsible man commanded upon those discussions which
    would ordinarily influence handling of human affairs, would do.

    Negligence has been understood to be an omission to
    do something which a reasonable man guided upon those
    considerations which ordinarily regulate the conduct of human
    affairs, would do, or doing something which a prudent and
    reasonable person would not do.” (Sushil Ansal Vs. State through
    CBI, 2014 (6) SCC 173).

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 38 of 44

    Digitally signed
    by KUMAR

    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:44:25 +0530
    Meaning of criminal negligence.- Criminal negligence
    means gross and culpable neglect, a failure to exercise that
    reasonable and proper care and precaution to guard an individual
    in particular against injury.

    82. Rash and negligent act.- In the ancient decision of
    Empress V. Idu Beg [ILR 3 All 776] , the topic was dealt with in the
    following language: “Criminal rashness consists in hazarding a dangerous or
    wanton act with the knowledge that it is so, and that it may cause injury, but
    without intention to cause injury, or knowledge that it will probably cause.

    The criminality lies in running the risk of doing such an act with
    recklessness or indifference as to the consequences. Criminal negligence is
    the gross and culpable neglect or failure to exercise that reasonable and
    proper case and precaution to guard against injury, either to the public
    generally, or to an individual in particular, which, having regard to all the
    circumstances out of which the charge has arisen, it was imperative duty of
    accused person to have ‘adopted’.

    Negligence in common parlance means and implies “failure to
    exercise due care, expected of a reasonable and prudent person”. It is a
    breach of duty and negligence in law ranging from inadvertence to shameful
    disregard of the safety of others. In most instances, it is caused by
    heedlessness or inadvertence, by which the negligent party is unaware of the
    results which follow from his act.

    DEFENCE OF THE ACCUSED

    83. The accused Mehrajuddin had taken defence that he
    was charge-sheeted only on the basis of being owner and no
    overt act or negligence was found on his part.

    From the testimonies of prosecution witnesses, it is
    not proved beyond reasonable doubt that the said building was
    demolished by contractor Furkan and other labours on the
    directions of accused Mehrajuddin, rather at the instance of MCD
    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 39 of 44
    Digitally
    signed by
    KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:44:31
    +0530
    officials, they started demolishing the building, which fell down
    and accused Furkan died and other labour suffered injuries, but
    none of these injured witnesses have supported the case of
    prosecution nor levelled any allegations against accused
    Mehrajuddin. As regards the unauthorized construction of the
    building, no action was taken by MCD and no negligence was
    found on the part of accused in the demolition of said building as
    discussed in the preceding paras. Thus, the defence of accused
    that there was no overt act or negligence on his part in the fall of
    building appears to be plausible and probable.

    84. In Baldev Raj Kapur (Supra), Hon’ble Delhi High
    Court held that:

    “27. In the present case petitioner happened to be owner of the
    property, a layman and had not given any instructions to the labour and the
    masons who were working there. There is no prima facie evidence to
    indicate that the petitioner had been visiting the place often specially a day
    or two earlier to the date of the incident. It cannot be said that there was any
    direct nexus between the petitioner and the rash and negligent act killing six
    workers and injuring eight workers due to collapse of the building.
    Therefore, under the circumstances of the case even the ingredients
    incorporated in Section 304A IPC are not made out against the petitioner.”

    85. In Gulijeet Singh Kochar (Supra), Hon’ble Delhi High
    Court set aside the impugned order of summoning the petitioner
    and held
    “7. That petitioners were the owners of house in question
    where the basement was being constructed, but there is no material to
    suggest that the construction of the basement was being done under their
    direct supervision….”

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 40 of 44

    Digitally signed

    KUMAR by KUMAR
    RAJAT
    RAJAT 16:44:35
    Date: 2026.04.15
    +0530

    86. In Kailash Gour and Ors. Vs. State of Assam reported
    in MANU/SC/1505/2011, (2012) 2 SCC 34, Apex Court has
    observed that an accused is presumed to be innocent till he is proved
    guilty beyond a reasonable doubt is a principle that cannot be sacrificed on
    the altar or inefficiency, inadequacy or inept handling of the investigation by
    the police. The benefit arising from any such faulty investigation ought to
    go to the accused and not to the prosecution.

    87. In Subramanya Vs. State of Karnataka, dt.
    13.10.2022, in Crl. Appeal No. 242/2022, Hon’ble Supreme
    Court of India has held that it is settled principle of law that when two
    views are possible from the prosecution evidence, the one which is
    favourable to the accused shall have to be taken and the benefit of doubt
    shall have to be given to the accused.

    88. The Hon’ble Supreme Court has time and again held
    that onus and duty to prove the case against the accused is upon
    the prosecution and prosecution must establish the charge beyond
    reasonable doubt. It is also a cardinal principle of criminal
    jurisprudence that if there is a reasonable doubt with regard to the
    accused, the accused is entitled to benefit of doubt resulting in
    acquittal of the accused. Reference may be made to the
    Judgments titled as ‘Nallapati Sivaiah Vs. Sub Divisional Officer,
    Guntur
    ‘, reported as VIII (2007) SLT 454 (SC) in this respect.

    Reference may also be made to the Judgment titled as ‘Raj
    Kumar Singh @ Raju @ Batya Vs. State of Rajasthan
    ‘, reported
    as (2013) 5 SCC 722.

    89. Thus, from the evidence surfaced on record during
    trial, it could not be proved that it was the accused Mehrajuddin,
    who directed Furkan and his labour to pull down the said

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 41 of 44

    Digitally signed
    by KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:44:41 +0530
    building and was negligent in not taking proper safety and
    precautionary measures on 05.07.2013 or 06.07.2013 and it has
    come on record that the building was being pull down on the
    instructions of MCD officials by the contractor and labour, who
    died and sustained injuries respectively and thus, all the
    questions framed for adjudication of charge are hereby answered
    in negative and not against the accused Mehrajuddin. The
    aforesaid judgments of Gulijeet Singh Kochar and Baldev Raj
    Kapur (Supra) also supplement the defence of the accused that he
    was not negligent in pulling down of said building and not liable
    for death of contractor Furkan and injuries to other labour and is
    entitled for benefit of doubt.

    CONCLUSION

    90. In the totality of the circumstances brought on record
    by way of evidence, it is observed that the prosecution has failed
    to prove its case beyond reasonable doubt against the accused
    Mehrajuddin qua offences punishable u/s 288/308/304 IPC.

    91. Consequently, the accused Mehrajuddin is acquitted
    of the charges u/s 288/308/304 IPC.

    The charts as per the judgment of Manojbhai
    Jethabhai Parmar Vs. State of Gujarat, (CA No. 2973/2023) of
    Hon’ble Supreme Court are annexed herewith.

    File be consigned to Record Room after necessary
    compliance. Digitally signed
    KUMAR by KUMAR
    RAJAT
    PRONOUNCED IN OPEN COURT RAJAT Date: 2026.04.15
    16:44:48 +0530
    ON THIS 15th DAY OF APRIL, 2026
    (KUMAR RAJAT)
    ASJ-07/SHD/KKD Court/Delhi
    15.04.2026

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 42 of 44
    Specimen Chart for Witnesses Examined.
    Prosecution Name of Witness Description
    Witnesses No.

    1. PW4, PW5, Nabi Hasan, Iqram, Iqbal, Injured/Eye Witnesses
    PW7, PW8, Ehsan, Nawab Ali, Akhtar,
    PW9, PW10,
    Shamshul, Sonawar, Iliyas,
    PW11, PW12,
    PW13, PW14, Riyasat Hussain, Urman
    PW15, PW16, Ali, Aslam, Mohd. Yaseen,
    PW17, PW18
    Abdul Hasan and Ahmad
    and PW19
    Sahid

    2. NA Witness of last seen
    circumstances.

    3. All MLCs (nature of Medical Jurists
    injuries)/PMR admitted by
    accused.

    4. PW25 ACP Sudesh Ranga Investigating Officer

    5. PW1 SI Lalit Mohan Complainant/First
    Informant

    Specimen Chart for Exhibited Documents.
    Exhibit Description of the Exhibit Proved by/Attested by
    No.

    1. Inquest PW1
    Panchnama/Memo, Ex.PW1/E

    2. NA NA

    3. Arrest Memo of accused: PW25
    Mehrajuddin, Ex.PW25/R.

    4. Post-mortem Report, Ex.PA16 Admitted by accused.

    5. FSL Report NA

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 43 of 44

    Digitally
    signed by
    KUMAR
    KUMAR RAJAT
    RAJAT Date:

    2026.04.15
    16:44:54
    +0530
    Specimen Chart for Material Objects/Muddamals.
    Material Description of the Exhibit Proved by/Attested by
    Object No.

    1. Weapon of offence. NA

    2. Clothing accused/victim NA

    3. Mobile Phone/Electronic Object NA

    4. Vehicle NA

    5. Purse/earrings/identity card NA

    State Vs. Mehrajuddin FIR No. 211/2013 PS Jafrabad Page 44 of 44

    KUMAR Digitally signed by
    KUMAR RAJAT

    RAJAT Date: 2026.04.15
    16:44:58 +0530