* IN THE HIGH COURT OF DELHI AT NEW DELHI
Judgment reserved on: 22.12.2025
% Judgment delivered on: 30.03.2026
+ LPA 1185/2024, CM APPL. 71163/2024 & CM APPL. 75920/2024
PUTZMEISTER CONCRETE PUMPS GMBH AND ANR
...Appellants
Through: Mr.Jayant Mehta, Sr. Adv. with
Mr.Rohin Dubey, Mr.Sagar Chawla
and Ms.Mansvini Jain, Advs.
versus
UNION OF INDIA AND ORS .....Respondents
Through: Mr.Mukul Singh, CGSC with Ms.Ira
Singh and Mr.Aryan Dhaka, Advs.
for UOI.
Mr.Shyam Mehta, Sr. Adv. with
Mr.Rishi Agrawala, Mr.Rajesh
Vaidya, Mr.Gaurav Goel, Mr.Aditya
Bapat, Mr.Abhay Agnihotri and
Mr.Abhishek Anand, Advs. for R-5 to
R-7.
Mr.Zoheb Hossain, SPC for ED with
Mr.Vivek Gurnami, Panel Counsel
along with Mr.Kartik Sabharwal,
Mr.Pransal Tripathi and Mr.Chinmay
Anand Panigrahi, Advs.
CORAM:
HON'BLE THE CHIEF JUSTICE
HON'BLE MR. JUSTICE TUSHAR RAO GEDELA
LPA 1185/2024 Page 1 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
JUDGMENT
DEVENDRA KUMAR UPADHYAYA, C.J.
CHALLENGE
1. The instant intra-Court appeal seeks exception to the judgment and
order dated 29.10.2024 passed by the learned Single Judge whereby,
W.P.(C) 8148/2010 instituted by respondent no.5-Putzmeister India Private
Limited (hereinafter referred to as the „PIP’), has been disposed of with
certain directions, with a further stipulation that there shall not be any stay
or injunction on operation of the ex-post facto approval till newly constituted
Committee takes appropriate decision on the proposal of appellant no.1-
Putzmeister Concrete Pumps GmbH (hereinafter referred to as the „PCP’)
whereby, ex-post facto approval of the respondent no.2 was sought under
Press Note-1 (2005 Series) for investment made by it in appellant no.2-
Putzmeister Concrete Machines Private Limited, (hereinafter referred to as
the „PCM’)
DETAILS OF PARTIES
SERIAL PARTIES IN THE CAUSE DESCRIPTION
TITLE
NO.
1. Appellant no.1- Putzmeister A German Company
Concrete Pumps GmbH incorporated in Germany, having
(PCP) its registered office at Max Eyth-
Stasse 10, 72631 Aichtal,
Germany.
LPA 1185/2024 Page 2 of 71 Signature Not Verified Signed By:SHAILNDRA KUMAR Signing Date:31.03.2026 20:35:50 This Company is said to be engaged in manufacture and supplies of concrete pumps of different sizes, tunnel machines, industrial pumps, mortar machines and professional high- pressure cleaners. It is also said to be engaged in developing, manufacturing and selling high- tech service focus machines to serve clients worldwide. 2. Appellant no.2-Putzmeister A Company incorporated and
Concrete Machines Private registered under the provisions of
Limited (PCM) Companies Act, 1956, having its
registered office at Plot No. N-4,
Phase IV, Verna Industrial Estate,
Verna, Salcete, Goa.
Appellant no.1 holds 99.99%
of the shareholding of appellant
no.2 and rest of 0.01% of the
shareholding of appellant no.2 is
held by Stabau GMBC, Germany
which is an associate company of
appellant no.1.
3. Respondent no.1-Union of Respondent no.1 has been
India arrayed in the appeal through
Secretary, Ministry of Commerce
and Industry, the Department of
Industrial Policy and Promotion,
Udyog Bhavan, New Delhi.
4. Respondent no.2-Union of Respondent no.2 has been
arrayed through Secretary,
LPA 1185/2024 Page 3 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
India Ministry of Finance, Department
of Economic Affairs, FIPB Unit,
North Block, New Delhi.
5. Respondent no.3-The
Reserve Bank of India
6. Respondent no.4-Directorate
of Enforcement, Government
of India
7. Respondent no.5- A Company incorporated and
Putzmeister India Private registered under the provisions of
Limited (PIP) Companies Act, 1956 having its
registered office at Plot No.190,
191 Kundaim Industrial Estate,
Kundaim, Goa.
76% of the issues, subscribed
and paid up share capital of this
Company is held by respondent
no.6 and 7.
Appellant no.1 earlier held
24% issued, subscribed and paid
up share capital of this Company,
which is said to have been
subsequently transferred by
appellant no.1 to a third party.
8. Respondent no.6- Milind Managing Director of
Sadashiv Bhabhade respondent no.5.
9. Respondent no.7-Ashok Director of respondent no.5.
Vidyanand Dikshit
LPA 1185/2024 Page 4 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
BACKGROUND FACTS
2. On 19.12.1997, appellant no.1-PCP, with a view to manufacture
certain types of pumps in India, entered into a Joint Venture Agreement
(hereinafter referred to as the „JVA-I’) with respondent nos.6 and 7. JVA-I
provided for inter alia supply of technology for manufacturing certain
pumps/products of appellant no.1-PCP. The agreement further provided that
appellant no.1-PCP shall subscribe to 24% of the capital of a Joint Venture
Company, which was to be formed.
3. On 19.12.1997 itself, a License Production Agreement was also
entered into between appellant no.1-PCP and respondent nos. 6 and 7,
making provisions for technology in respect of some products of appellant
no.1-PCP. This agreement was executed for entering into the license of
manufacturing and marketing of some products of appellant no.1-PCP in
India. It also stipulated provision for supply of technology for the licensed
production and marketing of licensed products.
4. Pursuant to JVA-I, a Joint Venture Company in the name of
respondent no.5-PIP was incorporated on 23.01.1998. In accordance with
JVA-I, respondent nos.6 and 7 subscribed to 76% of the shares of
respondent no.1 and appellant no.1-PCP subscribed to 24% of its shares.
5. Another JVA was entered into between appellant no.1-PCP and
respondent nos. 6 and 7 on 04.11.2004 (hereinafter referred to as the „JVA-
II’). As per JVA-II, certain changes were to be given effect to in the scheme
of the Joint Venture already in existence in the form of respondent no.5-PIP,
LPA 1185/2024 Page 5 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
which included reorganisation of the share capital, according to which,
shareholding of appellant no.1-PCP in respondent no.5-PIP would be 65%
and shareholding of respondent nos. 6 and 7 in this Company would be 35%.
JVA-II also provided that the Board of Directors of respondent no.5-PIP will
comprise of 5 Directors with 3 Directors to be nominated by appellant no.1-
PCP and 2 Directors to be nominated by respondent nos.6 and 7.
6. Appellant No.2-PCM was incorporated on 14.06.2005 having its
registered office at Goa. Appellant No.1 holds 99.99% shareholding of
appellant No.2 and rest of 0.01% of its shareholding is held by Stabau
GMBH, Germany.
7. On 23.06.2005, appellant no.1-PCP issued three notices. The first
notice was issued by appellant no.1-PCP, expressing its intention to
withdraw from JVA-II. The second notice was issued where appellant no.1-
PCP expressed its intention to withdraw from the Licensed Production
Agreement, and the third notice expressed its intention to terminate the right
to use under the Licensed Production Agreement.
8. Appellant no.1-PCP, thereafter, made an investment of Rs.25,62,000/-
in appellant no.2-PCM by subscribing to its entire share capital.
Subsequently, appellant no.1-PCM subscribed further shares of appellant
no.2-PCM. The total investment made by appellant no.1-PCP in appellant
no.2-PCM between 22.07.2005 and 01.08.2009 is said to be
Rs.55,41,01,810/-.
LPA 1185/2024 Page 6 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
9. At the time when appellant no.1-PCP made foreign investment in
appellant no.2-PCM, Form FC-GPR was filed on 08.08.2005 for remittance
under the automatic route of investment and it is the case of the respondent
no.5-PIP that while furnishing this Form, a false declaration was made that
appellant no.1-PCP did not have any previous Joint Venture or Technical
Collaboration/Trademark Agreement in the same or allied field.
10. Respondent no.5-PIP is said to have raised its grievances to various
authorities of the respondent nos. 1, 2 and 3 in relation to the investment
made by appellant no.1-PCP in appellant no.2-PCM, which, according to
respondent no.5-PIP, was in violation of the guidelines contained in Press
Note-1 and 3 (2005 Series) issued by Respondent No.1 and accordingly,
respondent no.5-PIP requested the authorities to take action against the
appellants.
11. At this juncture, we may note that the Department of Industrial Policy
and Promotion, Ministry of Industry, Government of India, had issued Press
Note-18 (1998 Series) on 14.12.1998, embodying guidelines pertaining to
approval of foreign/technical collaboration under the automatic route with
previous ventures/tie-ups in India. The Press Note-18 (1998 Series) is
quoted here under:
“1. The Government have reviewed the present Guidelines relating to
approval of foreign/technical collaborations under the automatic route
and after careful consideration it has been decided that foreign
financial/technical collaboration with previous ventures/tie-up in India
would be subjected to the following guidelines:
I. Automatic route for FDI and/or technology collaboration
would not be available to those who have or had any previousLPA 1185/2024 Page 7 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
joint venture or technology transfer/trade-mark agreement in the
same or allied field in India. RBI, therefore, have to stipulate
necessary declaration before applications for the automatic route
are taken on record.
II. Investors of Technology to the suppliers of the above category
therefore will have to necessarily seek the FIPB/PAB approval
route for joint ventures or the technology transfer agreements
(including trade-mark) giving detailed circumstances in which
they find it necessary to set-up a new joint venture/enter into new
technology transfer (including trade-mark).
III. The onus is clearly on such investor/technology suppliers to
provide the requisite justification as also proof to the satisfaction
of FIPB/PAB that the new proposal would not in any way
jeopardise the interests of the existing joint venture or
technology/trade-mark partner or other stakeholders. It will be at
the sole discretion of FIPB/PAB to either approve the application
with or without conditions or reject in toto duly recording the
reasons for doing so.
2. The above procedure will form part of the approval procedures
contained in the “Manual on Industrial Policy & Procedures In India”
published by SIA, Ministry of Industries, Government of India, which shall
stand clarified accordingly in respect of foreign/technical collaborators
with previous joint ventures/tie-up in India.”
12. The Ministry of Commerce and Industry, Department of Industrial
Policy and Promotion, Government of India, reviewed the guidelines
notified vide Press No-18 (1998 Series) and issued Press Note-1 (2005
Series) on 12.01.2005, which contains new guidelines for approval of
foreign/technical collaborations under the automatic route with previous
ventures/tie-ups in India. Press Note-1 (2005 Series) is quoted here under:
“1. …
2. New proposal for foreign investment/technical collaboration would
henceforth be allowed under the automatic route, subject to sectoral
policies, as per the following guidelines:
LPA 1185/2024 Page 8 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
i) Prior approval of the Government would be required only in cases
where the foreign investor has an existing joint venture or technology
transfer/trademark agreement in the „same‟ field. The onus to provide
requisite justification as also proof to the satisfaction of the Government
that the new proposal would or would not in any way jeopardise the
interests of the existing joint venture or technology/ trademark partner
or other stakeholders would lie equally on the foreign investor/
technology supplier and the Indian partner.
ii) Even in cases where the foreign investor has a joint venture or
technology transfer/ trademark agreement in the „same‟ field prior
approval of the Government will not be required in the following cases:
a. Investments to be made by Venture Capital Funds registered with
the Security and Exchange Board of India (SEBI); or
b. where in the existing joint-venture investment by either of the
parties is less than 3%; or
c. where the existing venture/ collaboration is defunct or sick.
iii) In so far as joint ventures to be entered into after the date of this
Press Note are concerned, the joint venture agreement may embody a
„conflict of interest‟ clause to safeguard the interests of joint venture
partners in the event of one of the partners desiring to set up another
joint venture or a wholly owned subsidiary in the „same‟ field of
economic activity.
3. …”
13. Thereafter, Press Note-3 (2005 Series) was issued by the Government
of India on 15.05.2005, containing certain clarifications regarding guidelines
pertaining to approval of foreign/technical collaborations under the
automatic route with previous ventures/tie-ups in India. Press Note-3 (2005
Series) is extracted herein below:
“Government of India
Ministry of Commerce & Industry
Department of Industrial Policy & Promotion
(Secretariat for Industrial Assistance)
PRESS NOTE NO. 3 (2005 SERIES)
Subject: Clarification regarding Guidelines pertaining to
approval of foreign/technical collaborations under the
automatic route with previous ventures/tie-ups in India.
LPA 1185/2024 Page 9 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
1. The Government, vide Press Note 1 {2005 Series) dated
12.1.2005,notified fresh guidelines for approval of new proposals for
foreign/technical collaboration under the automatic route with previous
venture/tie up In India. According to these guidelines, prior approval of
the Government would be required for new proposals for foreign
Investment/technical collaboration, in cases where the foreign investor
has an existing joint venture or technology transfer/trademark agreement
in the same field in India.
2. The Government had, earlier vide Press Note 10 (1999 Series)
notified the definition of “same field” as the 4-digit National Industrial
Classification (NIC) 1987 Code. It is hereby reiterated that for the
purposes of Press Note 1 (2005 Series), the definition of „same‟ field
would continue to be 4-digit NIC 1987 Code.
3. It is also clarified that proposals in the Information Technology
sector, Investments by multinational financial institutions and in
themining sector for same area/mineral were exempted from the
application of Press Note 18 (1998 Series) vide Press Note 8 (2000), Press
Note1(2001) and Press Note 2(2000) respectively. Investment proposals in
these sectors would continue to be exempt from Press Note 1 (2005Series).
4. From para 2(i) of the guidelines notified vide Press Note 1
(2005Series), it is clear that prior Government approval for new
proposals would be required only in cases where the foreign investor has
an existing joint venture, technology transfer/trademark agreement in the
„same‟ field subject to provisions of para 2(ii) of the Press Note 1 (2005
Series).
5. For the purpose of avoiding any ambiguity it is reiterated that joint
ventures, technology transfer/trademark agreements existing on the date
of issue of the said Press Note i.e. 12.1.2005 would be treated as existing
joint venture, technology transfer/ trademark agreement for the purposes
of Press note 1 (2005 Series).
(signed)
( UMESH KUMAR )
Joint Secretary to the Government of India”
14. It is also noteworthy that Press Note-1 (2005 Series) clearly provided
that where the foreign investor has an existing Joint Venture or technology
LPA 1185/2024 Page 10 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
transfer/trademark agreement in the same field, prior approval of the
Government would be required. It further provides that the onus to provide
requisite justification, as also proof, to the satisfaction of the Government
that the new proposal would or would not in any way jeopardise the interest
of the existing Joint Venture or Technology/Trademark Partner or other
stakeholders, would lie equally on the foreign investor/technology supplier
and the Indian partner. Press Note-3 (2005 Series) issued by the Government
of India clarified that for the purposes of Press Note-1 (2005 Series), the
definition of „same‟ field would continue to be 4-digit National Industrial
Classification (NIC) 1987 Code and that joint ventures existing on
12.01.2005 i.e. the date of issue of Press Note 1, would be treated as existing
joint venture for the purposes of Press Note 1.
15. On investment made by appellant no.1-PCP in appellant no.2-PCM
the grievance raised before the authorities by respondent no.5-PIP was that
such investment was in violation of the guidelines contained in Press Note-1
and Press Note-3 for the reason that no approval for such investment was
sought by the appellants, though, in terms of the requirements of the
guidelines contained in Press Note-1 and Press Note-3, the onus to provide
requisite justification and the proof to the satisfaction of the Government of
India that new proposal would or would not in any way jeopardise the
interest of the existing Joint Venture (respondent no.5-PIP) would lie
equally on both the appellants, the appellant no.1-PCP being the foreign
investor and appellant no.2-PCM being its Indian Partner.
LPA 1185/2024 Page 11 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
16. On investment made by appellant no.1-PCP in appellant no.2-PCM,
the said information was sent to the Reserve Bank of India by the appellant
no.2-PCM, which at that time was known as Dynajet Machinery India
Private Limited, by means of the letter dated 08.08.2005, along with Form
FC-GPR.
17. The information supplied to the Reserve Bank of India in Form FC-
GPR contains a declaration to the effect that, „Foreign equity (ies) other than
individuals to whom we have issued shares does/do not have any previous
joint venture or technical collaboration or trademark agreement in India in
the same or allied field‟. The relevant extract of the said declaration which
forms part of Form FC-GPR is extracted herein below:
“We hereby declare that
1. We have carefully followed the procedure for issue of shares as
laid down under the Automatic Route as Indicated in the Notification No.
FEMA 20/2000-RB dated 3rd May 2000.
2. Foreign equity (ies) other than individuals) to whom we have
issued shares does/do not have any previous joint venture of technical
collaboration or trade mark agreement in Indie in the same or allied field.
3. We don‟t require an Industrial Licence under the Industries
(Development and Regulation) Act, 1951 or in terms of locational policy
notified by the Government under the new Industrial Policy of 1991.
4. We are an SSI unit & the investmentlimitof2414hasbeen observed,
OR we are not an SSI unit, (Delete whichever is not applicable under
signature).
5. Our proposal is within the sectoral policy/cap permissible under
the automatic route of RBI.”
18. Writ petitions bearing no. W.P.(C) 5633-35/2006 were filled by
respondent no.5-PIP and respondent no. 6 and 7, before this Court with a
LPA 1185/2024 Page 12 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
prayer to direct respondent nos. 1 to 4 to take action against the appellant
nos. 1 and 2 for violation of the guidelines contained in Press Note.1 and 3.
19. During pendency of the said writ petitions filed by respondent no.5 to
7, an order was passed on 02.04.2007 by respondent no.1 on the
representation, which was preferred by respondent no.5-PIP, regarding
violation of Press Note-1 (2005 Series) by appellants, wherein it was noticed
that Press Note-1 (2005 Series) dated 12.01.2005 provided that new
proposals for foreign investment/technical collaboration would require prior
government approval in cases where foreign investor has, in India, an
existing Joint Venture or technology transfer/trademark agreement in the
same field.
20. It was also noted in the order/letter dated 02.04.2007 of the
respondent no.1 that appellant no.1-PCP had two JVAs in India for the
manufacture of construction machinery and equipment. The JVA-I expired
on 19.12.2004, while the JVA-II was terminated on 23.06.2005. The order
further stated that the termination of the second agreement is disputed by the
Indian Joint Venture Partner (respondent no.5-PIP).
21. The order dated 02.04.2007 passed by the respondent no.1 also
observed that both the agreements in India were for the activities identified
as „same‟ field under 4-digit NIC Code and that JVA-II was in force on
12.01.2005 and therefore, the department was of the opinion that a prima
facie case of violation of Foreign Direct Investment Policy (hereinafter
referred to as the „FDI Policy’) had occurred in appellant no.1-PCP, setting
up a wholly owned subsidiary in India (appellant no.2-PCM) under the
LPA 1185/2024 Page 13 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
automatic route while having an existing Joint Venture in India in the same
field.
22. Order dated 02.04.2007 also observed that FDI Policy is incorporated
under Schedule I of Foreign Exchange Management (Transfer or issue of
security by a Person Resident outside India) Regulations, 2000 and
accordingly, violation of FDI Policy amounts to violation of Foreign
Exchange Management Act, 1999 (hereinafter referred to as the „FEMA‟)
and therefore, such violation is liable to action under the FEMA. The
order/letter dated 02.04.2007 is addressed to the General Manager, Foreign
Exchange Division, Central Office of the Reserve Bank of India, Mumbai
and requests the Reserve Bank of India to take appropriate action under the
provisions of FEMA in the light of the preliminary finding of the
Department of Industrial Policy and Promotion on existence of a prima facie
case of violation of Press Note-1 (2005 Series).
23. The appellants challenged the order dated 02.04.2007 passed by
respondent no.1 by instituting the W.P(C) 3443/2007 before this Court,
which was dismissed vide order dated 01.07.2008. In the said order dated
01.07.2008, this Court further observed that so far as, W.P.(C) 5633-35/2006
are concerned, the issue raised therein had become academic.
24. The order dated 01.07.2008 passed by the learned Single Judge
dismissing W.P.(C) 3443/2008 was challenged by the appellants before a
Division Bench of this Court by instituting the proceedings of LPA
387/2008, which was dismissed as withdrawn vide order of a Coordinate
LPA 1185/2024 Page 14 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Bench of this Court, dated 11.08.2009. The order dated 11.08.2009 passed in
LPA 387/2008 is extracted here in below:
“After this appeal was heard for some time, Mr.Sundaram, learned
senior counsel for the appellants, made a request that the appellants may
be allowed to withdraw the Writ Petition (Civil) No.3443/2007 as well as
the present LPA and permit the appellants to approach FIPB for
appropriate reliefs. Mr.RajivNayar, learned senior counsel appearing
for the respondents No.5 and 6, has no objection to the withdrawal of the
writ petition and the appeal, but he maintains that the appellants having
resorted to direct mode are not entitled in law to approach the FIPB.
According to Mr. Sundaram, however, appellant has a right to apply to
FIPB.
In view of the prayer of the appellants, we allow the appellants to
withdraw the writ petition and the appeal without expressing any view on
the appellants? right to approach the FIPB for any reliefs. Needless to
say that the application, if any, that may be made by the appellants to the
FIPB, will bedealt with in accordance with law. As the writ petition has
been withdrawn, the order of the learned single Judge stands set aside
and the same will not be relied upon by either parties. The appeal stands
dismissed as withdrawn. Interim stay stands vacated.
Insofar as Writ Petition (Civil) No. 5633-34/2006 is concerned, the
grievance in the petition was that the concerned authorities were not
passing any order on the representation made by the respondent nos. 5
and 6. Since an order on the representation dated 2.4.2007 has been
passed, the petition does not survive and the same is disposed of as
such.”
25. It is noteworthy that the Division Bench of this Court, while passing
the order dated 11.08.2009, allowed the appellants to withdraw the appeal as
also the writ petition No. 3443/2007 without expressing any opinion on the
rights of the appellants to approach the Foreign Investment Promotion Board
(hereinafter referred to as the „FIPB’) for any relief(s). It was further
observed that if any application is made by the appellants to the FIPB, the
LPA 1185/2024 Page 15 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
same shall be dealt with in accordance with the law. The order further
provided that since the writ petition itself was withdrawn, the order of the
learned Single Judge passed in W.P.(C) 3443/2007 dated 01.07.2008 stood
set aside and the same would not be relied upon by either of the parties.
26. After dismissal of LPA 387/2008 as withdrawn vide order dated
11.08.2009 passed by the Division Bench of this Court, respondent nos.5 to
7 wrote letters to the respondent no.1 as also to respondent no.3, requesting
them to take action against the appellants for violation of the guidelines as
contained in Press No.1 and 3 (2005 Series). On 28.08.2009, a letter was
also written by respondent nos.5 to 7 to respondent no.2 not to entertain any
application of the appellant no.1-PCP for approval of its investment with a
further request that if any such application is made by appellant no.1-PCP
seeking approval of its investment made in appellant no.2-PCM, no decision
be taken on any such application without giving an opportunity of personal
hearing to respondent nos.5 to 7.
27. It appears that in response to the aforesaid letter of respondent no.5 to
7, vide letter dated 04.09.2009 respondent no.2 sought certain particulars
and information from respondent no.5-PIP informing it that the
representation made by it shall be considered and also that it would be given
an opportunity to make its submissions. Pursuant to the said letter dated
04.09.2009, respondent no.5-PIP is said to have furnished the details vide its
letter dated 12.09.2009 with a request that if any application is made by the
appellant no.1-PCP seeking approval of its investment, opportunity of
hearing be provided to respondent no.5-PIP as well.
LPA 1185/2024 Page 16 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
28. Appellant no.1-PCP filed an application/proposal dated 06.10.2009, to
respondent no.2 seeking grant of ex-post facto approval for the investment
made by it in appellant no.2-PCM. The said proposal dated 06.10.2009 was
furnished to respondent no.5-PIP by respondent no.2 vide its letter dated
16.10.2009 with a request to furnish its comments on the said proposal to the
respondent no.2. Pursuant to the said letter dated 16.10.2009, respondent
no.5-PIP gave its reply vide its letter dated 23.10.2009 and requested for
giving opportunity of a personal hearing. Vide letter dated 03.11.2009,
Department of Heavy Industry (AEI Section) of the Ministry of Heavy
Industries and Public Enterprises, requested respondent no.5-PIP to furnish
certain information. It is the case of respondent no.5-PIP that complete
comments on its behalf were furnished on the proposal of the appellants
seeking ex-post facto approval of its investments, vide letter dated
20.11.2009 and vide letter dated 04.11.2009 and the letter dated 03.11.2009
of the Ministry of Heavy Industries and Public Enterprises was also replied.
29. Thereafter, vide letter dated 01.01.2010, respondent no.2 required
respondent no.5-PIP to make a presentation of its case before the then
Director, FIPB, on 05.01.2010. In pursuance of the said letter, respondent
nos. 5 to 7 met with the Director, FIPB on 05.01.2010 and presented their
case in respect of the proposal made by appellant no.1-PCP seeking ex-post
facto approval of its investment.
30. The proposal submitted by appellant no.1-PCP seeking ex-post facto
approval of its investment was kept on the agenda of the meeting of the
FIPB held on 18.01.2010; however, it was deferred. In the said meeting,
LPA 1185/2024 Page 17 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
certain directions were given for the constitution of a Committee under the
Chairmanship of the Additional Secretary, Department of Economic Affairs,
for examining the rival submissions of the parties and for submitting its
recommendations to the FIPB. Pursuant to this decision of the FIPB dated
18.01.2010, an Office Memorandum dated 16.02.2010 was issued by the
Ministry of Finance, Department of Economic Affairs stipulating therein
that a meeting had been fixed with Ms. L.M. Vas, Additional Secretary,
Department of Economic Affairs, to enable the rival parties to present their
case.
31. The said Committee comprised of the Ms. L.M. Vas, Additional
Secretary, Department of Economic Affairs as its Chairman, Mr. Govind
Mohan, Joint Secretary, Department of Economic Affairs, (I and I), Mr.
Prabodh Saxena, Director (FIPB), Mr. P.K. Bagga, Officer on Special Duty
(CM&I), Mr. Deepak Narain, Director, Department of Industrial Policy and
Promotion and Mr. Sushil Lakra, Industrial Advisor, Department of Heavy
Industry.
32. On 17.03.2010, the said Committee met under the Chairmanship of
Ms. L.M. Vas, Additional Secretary, Department of Economic Affairs, and
gave an opportunity of hearing to respondent no.5-PIP as also to appellant
no.1-PCP in respect of the proposal of appellant no.1-PCP seeking ex-post
facto approval of its investment made in appellant no.2-PCM. The written
submissions were also submitted by respondent no.5-PIP and the appellant
no.1-PCP to the Committee.
LPA 1185/2024 Page 18 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
33. It is also on record that some opinion of the Department of Legal
Affairs, Ministry of Law and Justice, Government of India was furnished on
31.05.2010, which stated that ex-post facto approval under Press Note-1
(2005 Series) can be given. Respondent no.2 vide its letter dated 11.06.2010
requested respondent no.5-PIP to provide certain information regarding the
figures relating to production, capacity utilisation, sales, profit after tax and
market share year-wise for the years 2001 to 2008. Certain information was
also sought by Mr.Sushil Lakra, Industrial Advisor, Department of Heavy
Industry, Ministry of Industry and Public Enterprises, Government of India,
from respondent no.5-PIP vide his letter dated 16.06.2010. The information
asked for was provided to respondent no.2 by respondent no.5-PIP vide its
letter dated 19.06.2010 and to Mr.Sushil Lakra, vide letter dated 05.07.2010.
34. It is also on record that on 19.07.2010 an opinion was furnished by
Mr.Sushil Lakra, Industrial Advisor, Department of Heavy Industry,
Ministry of Industry and Public Enterprises, Government of India to the
effect that there was jeopardy to the interest of respondent nos.5 to 7 on
account of appellant no.1-PCP having set up appellant no.2-PCM as its
wholly owned subsidiary.
35. Vide Office Memorandum dated 29.07.2010, the constitution of the
Committee, earlier constituted under the Chairmanship of Ms. L.M. Vas,
Additional Secretary to examine the rival contentions of the parties in
respect of the proposal received from appellant no.1-PCP, was changed and
it was provided therein that Mr.Bimal Julkha, Director General, will be the
Chairman of the meetings of the Committee.
LPA 1185/2024 Page 19 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
36. The third meeting of the Committee was held on 04.08.2010, and as
per information given by the Department of Economic Affairs, Ministry of
Finance, under the Right to Information Act, 2005 vide letter dated
02.11.2010, the said meeting was attended by Mr.Bimal Julkha, Director
General, Director of Currency, in the rank of Additional Secretary, Mr.
Govind Mohan, Joint Secretary, Department of Economic Affairs, (I and I),
Mr. P.K. Bagga, Officer on Special Duty (CM&I), Mr. Deepak Narain,
Director, Department of Industrial Policy and Promotion and Mr. Sushil
Lakra, Industrial Advisor, Department of Heavy Industry. Thus, apart from
Ms. L.M. Vas, Additional Secretary, Department of Economic Affairs who
headed the said Committee earlier, another member of the earlier
Committee, namely, Mr. Prabodh Saxena, Director (FIPB), was not part of
the Committee which held its meeting on 04.08.2010.
37. The reconstituted Committee headed by Mr. Bimal Julkha in its
meeting dated 04.08.2010, made a recommendation for the grant of ex-post
facto approval. The opinion of the Committee expressed vide decision taken
in its meeting held on 04.08.2010 is on record, which is extracted herein
below:
“”Record of Discussions at the 3rdMeeting of the Committee held on
August 4, 2010 at4.00 pm under the Chairmanship of DG -DoC in Room
166 D, North Block
Subject : In the matter of the FIPB proposal of Putzmeister Concrete
Pumps GmbH, Germany (PG) seeking post facto approval of FIPB for
having set up a new WOS which attracted Press Note 1 (2005).
Committee formed as per the directions of the FIPB in its 149thMeeting
on January18, 2010LPA 1185/2024 Page 20 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Background
1. The proposal from M/s. Putzmeister Concrete Pumps GmbH,
Germany (PG)for ex-post-facto approval for setting up of new WoS
(without obtaining NoC from the existing Indian JV partner), was
considered in the FIPB Meeting held on January 18, 2010 and was
deferred. Since the proposal attracted Press Note 1 (2005 series) (now
clause 4.2.2.2 of Circular 1 of 2010 of the Consolidated FDI policy),prior
FIPB approval was required. While considering the proposal, the Board
directed that a Committee under the Chairmanship of AS (EA) which
include the representatives from DIPP, DEA and AMs concerned, may
examine the rival contentions of the two parties and submit its
recommendations to the Board.
2. The 1st meeting of the Committee was held on March 17, 2010 in
which contentions of both the parties were heard. Since the Indian JV
partner viz., Putzmeister India Private Limited (PI) inter-alia questioned
the authority of FIPB to give ex-post-facto approval; the proposal was
referred to Department of Legal Affairs(DLA). DHI was also requested to
give a view based on an analysis of the relevant data if it could be
established as to whether „jeopardy‟ was caused to the Indian partner by
the setting up of WOs by PG at the material time.
3. In the 2ndmeeting held on June 11, 2010 DLA opined that FIPB has
the power to grant ex-post-facto approval, and FIPB has granted such
approvals earlier also. During the deliberations, while discussing the
comments dated March 23, 2010 received from D/HI that the proposal
“does not seem to have any jeopardy”, the Committee felt that a deeper
analysis is needed on the issue. As directed, relevant information was
obtained and forwarded to D/HI for reexamination.
4. The 3rdMeeting of the Committee, reconstituted with the charge of
FIPB matters being entrusted to DG DoC, Shri Bimal Julka, took place as
recorded hereunder.”
Proceedings of the 3rd Meeting
“5. It was recalled that In the 2ndmeeting, DHI had been ·directed to
carry out a deeper analysis of both entities from 2000-01 to 2007-08 in
respect of production figures, capacity utilisation, sales, profit after tax
and market share to support its recommendation. It was also observed that
LPA 1185/2024 Page 21 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
post 2007-08, the global meltdown came as an aberration and the data
may not present the correct picture.
6. DHI‟s comments dated 19.07.2010 were then discussed. While
rioting the detailed work, it was observed however that DHI had in fact
concentrated in the present analysis on the post 2007-08 years in respect
of the Indian company PI and the new WOS of PG. In this analysis DHI
had observed that during the years 2008-09 and2009-10, the- existing
Indian company PI has had a decline in production, capacity utilisation,
market share and sales and concluded based on this data (2008-09
and2009-10) that the Indian company has suffered jeopardy. This was
quite the opposite view to that communicated by DHI earlier by their OM
dated March 23, 2010 and while DHI had been requested to substantiate
their earlier findings with a deeper analysis, DHI had instead analysed the
later period. Since the last two years are clearly an aberration in the
whole business environment, it would not be correct to base any decision
on the statistics of this period especially as the new WOS was formed
before this period.
7. Based on the tabular comparison of the statistics for the two
companies as collated by DHI, it was observed that the Indian unit had
started with a minimal capacity of 12 units /year in 2000-01 which
increased to 48 units /year in 2002-03when the investment level reached
Rs 26.72 lacs. Since then the Indian unit PI has been able to increase its
capacity to 240 units per year in 2006-07 and up to 600 units in 2009-10.
During this period, the investment has also gone up from Rs. 26.72 lacs to
approx Rs 160lacs till 2008-09 (figures for the latest year are not
available). Sales have shown a steady growth from Rs 2.16 crore in 2000-
01 to Rs 49 crores in 2007-08 at which stage the market share also went
up to 10.04%. There has thus been a healthy growth till 2007-08, and
thereafter the growth has slowed down but it needs to be recalled that at
that time, the general economic situation was in a severe downturn.
8. The new WOS was set up by PG in 2006-07 and the investment In
2007-08was Rs 7.09 crores, the capacity being 500 Units/year. This
investment has now gone up to nearly Rs 48 crores in 2009-10 with a
capacity of 1000 Units/year. Sales In 2009-10 had gone up to Rs 78
Crores, the PAT figures were not available, but till the previous year
(2008-09) the unit had incurred a loss of Rs 8 crores approx.
9. The following conclusions are evident.
LPA 1185/2024 Page 22 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
9.1 The existing unit which was an SSI unit had a very modest
beginning and obviously benefitted from the technology collaboration
during the period 1997-2004.
9.2 Thereafter in the revised negotiations, when the first round of
Technology agreement with the foreign collaborator expired in
November 2004, the two could not reach an agreement when the latter
wished to invest more up to 65% from the then extant 24%,and
increase capacity. The two actually parted ways in July, 2005 in an
acrimonious fashion.
9.3 Thus, though technically there was a JV in existence on January
12, 2005 and PN 1 (2005) was attracted, as correctly observed by
DIPP (in 2007), there was little cooperation between the two on the
ground. At this stage, the foreign investor having terminated the JV,
then appears to have “taken the law into his own hands” and decided
that his case did not attract PN1 and set up a WOS without prior FIPB
approval and thus a violation of PN1 took place. To be fair, at that
stage even if an NOC had been asked for by the foreign investor, it
would probably not have been forthcoming.
9.4 At the present juncture, 5 years later, it is difficult to determine if
jeopardy would have been caused as one needs to set the clock back.
But by all accounts, the Indian unit has geared itself up, increased
capacity and sales and did not collapse approved ab initio, i.e. if it is
proved that the setting up of the WOS caused jeopardy, then along
with compounding, the unit set up would have to be wound up.
However if as in the present case, considering that no jeopardy has
been caused and perhaps only better competition and choice exists for
the Indian consumer, the considered opinion of the committee is that
the FIPB can accord due approval post fact subject to compounding of
the violation with RBI.
10. Accordingly this Report can be placed before the FIPB at its next
meeting.”
38. The opinion of the Committee was considered by FIPB in its 150th
meeting held on 10.09.2010 and on deliberations on the opinion of the
Committee, it was found by the FIPB that ex-post facto approval to the
proposal of appellant no.1-PCP for its investment in appellant no.2 can be
LPA 1185/2024 Page 23 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
given subject to compounding by Reserve Bank of India for violation of the
conditions of Press Note-1 (2005 Series). Accordingly, the FIPB
recommended the proposal for approval subject to the said condition of
compounding by the Reserve Bank of India.
39. Respondent no.2, thereafter, granted ex-post facto approval of the
Government of India to the proposal of appellant no.1-PCP on 29.09.2010
subject to compliance with the pricing guidelines and compounding by the
Reserve Bank of India for investment in appellant no.2-PCM. It was also
provided in the order dated 29.09.2010 that any non-compliance with the
approval letter shall be viewed strictly by the Government and that the
Government reserved its right, in its own discretion, to revoke the approval
or modify its terms and conditions and/or initiate action on account of non-
compliance.
40. Respondent no.2, thereafter, by amendment no.1 made on 10.11.2010,
made certain changes in Clauses 1 and 8 of the approval letter/order dated
29.09.2010. The only change made was that in Clause 1, the name and
address of the foreign collaborator, which was wrongly mentioned in the
order dated 29.09.2010 as M/s Purzmeister Concrete Pumps GmbH was
changed to M/s Putzmeister Concrete Machines Private Limited (PCM). By
the said amendment dated 10.11.2010, Clause 8 of the approval letter/order
dated 29.09.2010 was also corrected. The corrections made in Clauses 1 and
8 is as under:
Clause 8 of the approved letter dated Amended Clause 8 vide amendment dated
29.09.2010 10.11.2010LPA 1185/2024 Page 24 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Clause 1- Name and address of foreign M/s Clause 1- Name and address of the foreign
Purzmeister Concrete Pumps GmbH collaborator M/s Putzmeister Concrete
Machines Pvt Ltd.
Clause 8 The approval is subject to the Clause 8 of the FC approval dated
condition that the foreign 29.9.2010
collaborator/Investor has no existing joint
venture or technology transfer/trademark The approval is subject to the condition
agreement in the same field as per Press that the foreign collaborator/Investor has
Note 1 of 2005 Series (now para 4.2.2. of no existing joint venture or technology
Circular No. 1 of 2010 of the Consolidated transfer/trademark agreement in the same
FDI Policy) for which approval is granted. field as per Press Note 1 of 2005 series
If this is not so, you shall not take steps to (now para 4.2.2 of Circular No 2 of 2010
implement the project but submit the details of the Consolidated FDI Policy) for which
to the FIPB Unit. approval is granted. If this is not so, you
shall not take steps to implement the
project but submit the details to the FIPB
unit. However, this is not applicable to the
erstwhile Indian Partners (Mr.Milind S
Bhadbhade and Mr Ashok V Dikshit) since
there is no jeopardy to the erstwhile Indian
partners.
41. Appellant no.1-PCP applied for compounding of the contravention as
per the approval order dated 29.09.2010. Respondent no.5 to 7 filed W.P.(C)
8148/2010 challenging the approval order dated 29.09.2010 as amended vide
amendment dated 10.11.2010. In the said writ petition, on 06.12.2010,
learned Single Judge passed an interim order providing therein that any steps
which may be taken pursuant to the approval dated 29.09.2010, shall be
subject to result of the said writ petition.
42. The Reserve Bank of India vide its letter dated 03.05.2011 refused to
compound the contravention of appellant no.1-PCP considering the
pendency of W.P.(C) 8148/2010 at the relevant point of time. In the writ
petition, the learned Single Judge on 15.01.2014 passed an order whereby
LPA 1185/2024 Page 25 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
the earlier interim order dated 06.12.2010, which provided that any steps
taken by appellant no.1-PCP shall be subject to the outcome of the writ
petition, was continued. The interim order dated 15.01.2014 was challenged
by respondent no.5 to 7 by filing SLP (C) 12284/2014, which was disposed
of by means of the order dated 12.01.2016, observing that looking to the
facts of the case, it was hoped that this Court shall decide the W.P.(C)
8148/2010 as expeditiously as possible. W.P.(C) 8148/2010 wherein ex-post
facto approval dated 29.09.2010 as amended vide amendment dated
10.11.2010 was under challenge, has been dismissed by the judgment and
order dated 29.10.2024 that is under challenge herein.
ARGUMENTS ON BEHALF OF THE APPELLANTS
43. Impeaching the impugned judgment and order dated 29.10.2025
passed by learned Single Judge, whereby a direction has been given for
constitution of a new Committee to hear afresh the proposal dated
06.10.2009 moved by the appellants for grant of ex-post facto approval
under Press Note-1 (2005 Series), it has been vehemently argued by learned
senior counsel representing the appellants that the conclusion arrived at by
learned Single Judge that the process adopted by the Committee appointed
by FIPB while considering grant of ex-post facto approval was violative of
principles of natural justice, is erroneous and unsustainable.
44. Learned senior counsel representing the appellants Sh. Jayant Mehta
has argued that the approval accorded to the investment made by appellant
no.1 in appellant no.2, ex-post facto, vide letter dated 29.09.2010 has to be
understood in the wake of the fact that by issuing Press Note-1 (2005
LPA 1185/2024 Page 26 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Series), the Government of India had liberalised the regulations for foreign
investment and provided that no prior government approval will be
necessary where the previous Joint Venture is sick or defunct. It is also the
case, as set up on behalf of the appellants, that the Joint Venture Agreements
between appellant no.1 and respondent no. 6 and 7, pursuant to which the
Joint Venture company – respondent no. 5 was formed, was terminated by
appellant no.1 on 23.06.2005 and therefore, upon termination of the Joint
Venture Agreement – II, there was no existing Joint Venture between
appellant no.1 and respondent nos. 6 and 7. In this view, the submission is
that the Press Note-1 (2005 Series) did not apply to appellant no.1 on and
from 23.06.2005, and therefore, no prior approval of the government was
required. In support of this argument, Sh. Jayant Mehta has cited a
judgment of a Division Bench of this Court in B.Q.R. Systems India Pvt.
Ltd. v. Union of India, 2012 (127) DRJ 266 (DB).
45. It has also been contended on behalf of the appellants that the Joint
Venture Agreements were determinable in nature which allowed a party to
terminate the agreement for convenience, upon notice to the other party. He
further states that the modalities for exit from the Joint Venture require
transfer of shares and that the determining party does not require consent of
the other party for determination. He has further argued that only because
JVA-II prescribes certain modalities for exit from respondent no.5, it would
not make JVA-II non-determinable. In support of this submission, reliance
has been placed on behalf of the appellants on (i) Indian Oil Corporation v.
Amritsar Gas Service, 1991 (1) SCC 530, (ii) Rajasthan Breweries Limited
v. The Stroh Brewery Company 2000 (55) DRJ (DB) page 74-76 and (iii)
LPA 1185/2024 Page 27 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
K.S. Manjunath v. Moorasavirappa 2025 INSC 1298. His submission in
this regard is that a joint venture is in the nature of a partnership, and any
agreement to form a partnership or to continue in it, cannot be enforced.
46. Sh. Jayant Mehta has further submitted that the contention that since
the appellants applied for compounding and therefore, they have accepted
violation of Press Note – 1 (2005 Series) and hence are precluded from
submitting that Press Note does not apply in this case, is not correct for the
reason that the application seeking approval made by the appellants to FIPB
had stated that the proposal seeking ex-post facto approval was sought
without prejudice to the bona fide contention of the appellants that
provisions of Press Note-1 (2005 Series) are not attracted to the investment
made by the appellant no.1 and appellant no.2.
47. In respect of the letter/order dated 02.04.2007, wherein respondent
no.2 has prima facie held that it is a case of violation of the guidelines
contained in Press Note-1 (2005 Series), it has been contended on behalf of
the appellants that it is erroneous. Elaborating further, it has been argued
that the letter dated 02.04.2007 states that on the date of issue of Press Note-
1 (2005 Series) i.e. on 12.01.2005, the Joint Venture – respondent no.5 was
in existence, which is untenable for the reason that as per the judgment in
B.Q.R. Systems (supra), what is relevant is the date of investment and not
the date of issue of Press Note-1 (2005 Series) to evaluate “existence of a
Joint Venture”.
48. He has also highlighted the finding recorded by the learned Single
Judge in the impugned judgment and order wherein it has been specifically
LPA 1185/2024 Page 28 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
held that ex-post facto approval was well reasoned, yet the learned Single
Judge has directed reconsideration of the proposal for the grant of ex-post
facto approval moved by appellant no.1, which is contradictory.
49. Regarding the finding given by learned Single Judge in the impugned
judgment and order to the effect that process by which ex post facto
approval was granted, was violative of principles of natural justice, it has
been argued on behalf of the appellants that said finding has been given by
learned Single Judge solely on the basis that Chairperson of the Committee
was changed, however, it is crucial to note that rest of the Committee
remained the same.
50. Emphasising vehemently on the case set up on behalf of the
appellants challenging the finding recorded by the learned Single Judge in
the impugned judgment and order that the process which led to passing of
the order dated 29.09.2010 was erroneous for want of observance of
principles of natural justice, it has been argued that the learned Single Judge
has erroneously invoked the principle of “one who hears must decide” for
the reason that such a principle does not have any application to
administrative considerations, especially in case of institutional hearings,
keeping in view the fact that this was not a hearing entrusted by any
statutory provision to any particular officer. Reliance in this regard has been
placed by Sh. Jayant Mehta on Ossein and Gelatine Manufacturers’ Assn.
v. Modi Alkalies and Chemicals Ltd., (1989) 4 SCC 264 and Kalinga
Mining Corpn. v. Union of India, (2013) 5 SCC 252.
51. It is also the argument of Sh. Jayant Mehta that several written
LPA 1185/2024 Page 29 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
representations to the Committee on more than 18 different occasions were
made by the respondent nos.5 to 7 when the proposal submitted by appellant
no.1 for grant of ex-post facto approval was being considered and as such
the respondent nos. 5 to 7 cannot complain of violation of principles of
natural justice in the course of consideration of the said application. His
submission is that the opportunity was not only provided to the respondent
nos. 5 to 7, but it was availed of as well by them.
52. Drawing our attention to the Minutes of Meeting of the Committee
held on 04.08.2010, it has been submitted on behalf of the appellants that all
the objections raised by respondent nos. 5 to 7 were considered in detail and
were dealt with by the Committee in the said meeting and it is only after
detailed consideration that the Committee recommended to the FIPB to
accord ex-post facto approval to the proposal of the appellant no.1.
53. It is also the submission of Sh. Jayant Mehta that FIPB is only a
recommendatory body and the Committee formed by it was only to consider
the application and report to the FIPB. He further states that neither the
FIPB nor the Committee perform any quasi-judicial or judicial functions
and that the recommendation made by FIPB dated 10.09.2010 clearly shows
that the Board applied its own mind in making the recommendation for
approval of the proposal of the appellant no. 1 seeking ex-post facto
approval to the investment made by it in the appellant no.2.
54. Our attention on behalf of the appellants has also been drawn to the
stand taken by the Union of India before the learned Single Judge, according
to which approval of foreign investment is a policy making function and
LPA 1185/2024 Page 30 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
therefore, interference in such a decision by the learned Single Judge was
impermissible. Laying emphasis on the judgment rendered in Jay Ushin
Ltd. v. Foreign Investment Promotion Board and Ors, decided on
27.04.2010 (W.P.(C) 2136/2008), it has been contended that FIPB approval
is a matter of policy and hence recommendation for grant of such approval
could not be faulted specially when such a recommendation in the instant
case was made by FIPB considering all relevant aspects of the matter.
55. Reliance has also been placed behalf of the appellants on the
following judgments to support the argument that government possesses the
authority to grant ex-post facto approval:-
(i) LIC v. Escorts Ltd., (1986) 1 SCC 264
(ii) Cruz City 1 Mauritius Holdings v. United Limited 2017 SCC OnLine
Del 7810
(iii) Vijay Karia and Ors v. Prysmian Cavi E Sisteni SRL and Ors (2020)
11 SCC 1
(iv) D Swamy v. Karantaka State Pollution Control Board and Ors 2022
SCC OnLine SC 1278
(v) Veritas (India) Ltd. v. Union of India 2023 SCC OnLine De 2580
56. Lastly, Sh. Jayant Mehta has submitted that instant litigation is
nothing but a vendetta and an attempt on the part of respondent nos. 5 to 7 to
misuse the proceedings to destroy competition as appellant no.2 is a duly
incorporated company and has been operating to serve the Indian economy.
57. On these counts, it has been submitted that the appeal deserves to be
LPA 1185/2024 Page 31 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
allowed and the impugned judgment and order passed by the learned Single
Judge is liable to be set aside.
ARGUMENTS ON BEHALF OF RESPONDENT NO. 5 TO 7
58. Sh. Shyam Mehta, learned senior counsel representing the respondent
nos. 5 to 7 has vehemently opposed the instant appeal and has submitted that
in the facts and circumstances of the case, the judgment rendered by the
learned Single Judge, which is under challenge herein, does not call for any
interference in this appeal, which is liable to be dismissed.
59. Sh. Shyam Mehta has argued that the grant of ex-post facto approval
to the proposal of the Appellant no.1-PCP for foreign investment, by the
FIPB/Government causes serious prejudice and results in adverse civil
consequences either to the Indian partner or to the foreign investor and as
such appropriate hearing is required to be given by FIPB/Government of
India to the parties before taking any such decision on any such proposal. It
has further been argued on behalf of respondent nos. 5 to 7 that the
recommendation of the Committee made on 04.08.2010, was in violation of
principles of natural justice for the reason that the Committee which made
the decision/recommendation was not the same, rather it was different from
the Committee which had heard the parties. In this regard, it has been stated
that two members of the Committee, namely, Ms. L.M. Vas, Additional
Secretary, Department of Economic Affairs, who was the Chairperson of the
Committee and Sh.Pramod Saxena, Director (FIPB), were removed from the
Committee and substituted by one Mr.Bimal Julka, Director General,
Directorate of Currency. It has been stated that the reconstituted Committee
LPA 1185/2024 Page 32 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
ought to have heard the respondent nos. 5 to 7 before taking a decision. On
behalf of respondent nos. 5 to 7, it has also been argued that respondent nos.
5 to 7 ought to have been heard by the reconstituted Committee also for the
reason that various material gathered after the hearing was granted to the
parties by the first Committee on 17.03.2010, have been considered and
relied upon by the reconstituted Committee while making the
recommendation on 04.08.2010.
60. Sh. Shyam Mehta, in this regard, has referred to the opinion of the
Department of Legal Affairs, where it was opined that it was permissible to
grant ex-post facto approval. He has also referred to the opinion of the
Department of Heavy Industry, wherein it was expressed that the interests of
respondent no. 5 were jeopardised by appellant no. 1 setting up appellant no.
2. He has submitted that both these opinions were gathered after 17.03.2010
when the hearing was provided to the parties by the first Committee;
however, though these opinions have been taken into consideration by the
reconstituted Committee as also by FIPB, however, the respondent nos. 5 to
7 were never confronted with these opinions, which, according to Sh. Shyam
Mehta, amounts to violation of principles of natural justice.
61. It has also been argued that the recommendation made by FIPB is
without reasons, and it has accepted the recommendations of the Committee
without actually considering or analysing the same, and hence the
recommendation of FIPB suffers from the vice of the non-application of
mind.
62. On behalf of respondent no. 5 to 7, Sh. Mehta has contended that the
LPA 1185/2024 Page 33 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Minutes of Meeting of the Committee dated 04.08.2010 are based on a
wholly erroneous premise. In this regard, it has been stated by Sh. Mehta
that the Committee in its meeting dated 04.08.2010 has observed that after
the term of JVA-I expired in November 2004, parties could not arrive at a
fresh agreement, which is incorrect for the reason that admittedly a fresh
agreement was executed by the parties on 04.11.2004, i.e. JVA-II.
63. Our attention has also been drawn to the observation made in the
Minutes of Meeting of the Committee dated 04.08.2010 to the effect that
respondent nos. 6 and 7 set up another company i.e. M/s. Aquarius
Engineers Pvt. Ltd. with technology from a competing Korean company in
the same field, which fact according Sh. Mehta has not been correctly
recorded for the reason that M/s. Aquarius Engineers Pvt. Ltd. has been in
existence since August 1997, and has been carrying on a business
completely different from that of the respondent no. 5, which was only
marketing and sales of concrete pumps of appellant no. 1. It is, thus, the
submission on behalf of the respondent nos. 5 to 7 that M/s. Aquarius
Engineers Pvt. Ltd. at no point in time manufactured concrete pumps, which
is primarily the business of respondent no. 5.
64. On the aforesaid grounds, it has been argued by Sh. Shyam Mehta,
that decision of the Committee as well as that of the FIPB violates the
Wednesbury principle of reasonableness inasmuch as that these bodies, for
arriving at their decisions, had taken into account irrelevant considerations,
whereas they failed to consider relevant matters.
65. Regarding the grant of ex-post facto approval to foreign direct
LPA 1185/2024 Page 34 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
investment made by appellant no.1, it has been argued on behalf of
respondent nos. 5 to 7 that such ex-post facto approval is not legally
permissible for the reason that Press Note-1 (2005 Series) requires prior
approval of the government and not ex-post facto approval. He has also
stated that even the Foreign Exchange Management (Transfer of Issue of
Security by a person resident outside India) Regulations, 2000 require such
prior permission and therefore, prior permission is a statutory requirement
which is mandatory. It is, thus, submitted that it was not permissible to
grant ex-post facto approval considering the object behind the guidelines
embodied in Press Note-1 (2005 Series).
66. Drawing our attention to the language in which Press Note-1 (2005
Series) is couched, Sh. Mehta has argued that jeopardy to the interest of the
existing Joint Venture was to be considered before granting approval and
accordingly, the Committee as also the FIPB were required to consider the
issue of jeopardy caused to the interest of respondent nos. 5 to 7 as in July,
2005 when investment in appellant no. 2 was made by appellant no.1. It has
been submitted that the Committee as also FIPB completely misdirected
themselves and entered into an irrelevant inquiry with regard to performance
of respondent nos. 5 to 7 after July 2005, and the benefits of FDI by the
appellant no.1 to the Indian economy and the consumer. According to Sh.
Mehta, these considerations are alien in the context of the nature of inquiry
which is required to be made before grant of approval in terms of the
provisions contained in Press Note-1 (2005 Series).
67. Sh. Mehta has also argued that neither JVA-II nor License Production
LPA 1185/2024 Page 35 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Agreement are terminable by a mere notice, which is clear from the terms of
JVA-II and the License Production Agreement and further that in the facts
of the case, it cannot be said that the existing Joint Venture, i.e. respondent
no. 5 was defunct at the time appellant no. 1 had made investment in
appellant no.2. In this regard, it has been argued that the words “defunct”
and “sick” must be read and construed together and accordingly, they
contemplate a situation when the Joint Venture/Collaboration ceases to exist
either by mutual agreement of the partners of Joint Venture or by operation
of law. His argument in this regard is that these words do not cover a
situation where a Joint Venture/Collaboration Agreement is unilaterally
terminated by one of the parties. According to Sh. Mehta, if such unilateral
termination is considered as rendering the Joint Venture/Collaboration
defunct, it would defeat the very purpose and object of the Press Note-1
(2005 Series), which is to protect the interest of the Indian Joint Venture
partner.
68. Refuting the submission made by Sh. Jayant Mehta, learned senior
counsel representing the appellants on the basis of the judgment in B.Q.R.
Systems India (P) Ltd. (supra), it has been contended on behalf of
respondent no. 5 by Sh. Shyam Mehta, learned senior counsel that the said
judgment is not applicable here because the transaction in question was a
licence agreement, and not a Joint Venture or Technology Transfer or
Trademark Agreement. He has also stated that in B.Q.R. Systems India (P)
Ltd. (supra), the licence agreement was terminable in nature and it was the
admitted position that the said agreement had been terminated. He has also
stated that in the said case this Court had concluded that the agreement
LPA 1185/2024 Page 36 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
involved in the said matter could not be specifically enforced and since none
of the aforesaid aspects are present in the instant case, the reliance placed on
behalf of the appellants on B.Q.R. Systems India (P) Ltd. (supra) is
misplaced. He has also argued that the submission on behalf of the
appellants that the Joint Venture, in the instant case, was not in existence in
July 2005 when the appellant no.1 invested in appellant no.2, is erroneous
and does not improve the case of the appellants for the reason that the words
“existing Joint Venture” occurring in Press Note-1 (2005 Series) means
Joint Venture that was in existence on the date of issuance of the said Press
Note-1 (2005 Series), i.e. 12.01.2005 which has been clarified in no
uncertain terms by Press Note – 3 (2005 Series), dated 15.03.2005.
69. Sh. Shyam Mehta, on the proposition that the principles of natural
justice apply to even administrative action resulting in civil consequences,
has relied on the following judgments:-
(i) State Bank of India v. Rajesh Agarwal, (2023) 6 SCC 1,
(ii) IDBI Bank v. Gaurav Goel, 2025 SCC OnLine Del 935,
(iii) Excise Commr. vs. Mysore Sales, (2024) 9 SCC 415, and
(iv) A.K. Kraipak v. Union of India, 1969 (2) SCC 262.
70. On the principle that “he who hears must decide” reliance has been
placed on behalf of respondent no. 5 to 7 on the following judgments:-
(i) Gullapalli Nageswara Rao v. A.P. State Road Transport Corpn.,
AIR 1959 SC 308
(ii) Hyundai Rotem v. Delhi Metro Rail, 2015 SCC OnLine Del 13531,
and
(iii) UOI v. Shiv Raj, (2014) 6 SCC 564.
LPA 1185/2024 Page 37 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
71. In support of this submission that if a statute provides for prior
approval, ex-post facto will be impermissible, the following judgments have
been cited by Sh. Shyam Mehta, learned senior counsel:-
(i) LIC v. Escorts Ltd., (1986) 1 SCC 264,
(ii) Asha Rani Gupta v. Ravindra Memorial, 2024 SCC OnLine Del
7143,
(iii) A. Chowgule and Company v. Goa Foundation, (2008) 12 SCC 646,
(iv) Union of India v. Vinod Kumar, (1996) 10 SCC 78, and
(v) Behari Kunj Sahkari Avas Samiti v. State of Uttar Pradesh & Ors.,
(2008) 12 SCC 306.
72. Sh. Mehta has also argued that once a prayer or application is made
for compounding of any contravention, it amounts to acceptance of
violation. In support of this submission, he has placed reliance on JVL Agro
Industries Ltd. v. Union of India, (2014) SCC Online All 12456. Thus, Sh.
Shyam Mehta, appearing for respondent nos. 5 to 7, has, while defending the
judgment and order passed by the learned Single Judge whereby direction
has been issued to decide the proposal afresh submitted by the appellants
seeking ex-post facto approval of FDI, urged that since the appeal does not
bear any force, it may be dismissed.
DISCUSSION AND ANALYSIS
73. On the basis of the pleadings available on record and the respective
submissions made by the learned counsel for the parties, two issues emerge
for our consideration and decision which are: (i) as to whether decision of
the Government on the proposal submitted by the appellant no.1-PCP
LPA 1185/2024 Page 38 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
seeking ex post facto approval to the investment made by the appellant no.1-
PCP in appellant no.2-PCM is in the nature of policy decision and, in case,
such decision is a policy decision, what would be the possible scope of
interference by this Court in proceedings instituted under Article 226 of the
Constitution of India?, and (ii) In the facts of the instant case, what steps
would constitute fulfilment of the requirement of observance of the principle
of natural justice and as to whether while taking the decision granting ex
post facto approval to the investment made by the appellant no.1-PCP,
requirements leading to the observance of the principle of natural justice
were met?
74. Adverting to the first issue as culled out above, we may first note the
provisions of Press Note-1 (2005 Series) which is in relation to foreign
investment under the automatic route. The said guidelines clearly state that
prior approval of the Government will not be required in all cases; it would
rather be required only in cases where foreign investor has an existing Joint
Venture in the same “field”. The guidelines also provide that the onus
would be equally on the foreign investor and the Indian partner to provide
the requisite justification and the proof, to the satisfaction of the
Government that the new proposal would or would not in any way
jeopardise the interests of the existing Joint Venture.
75. This is clear from a bare perusal of Clause 2(i) of Press Note-1 (2005
Series), which is extracted hereinbelow:-
“2. New proposal for foreign investment/technical collaboration
would henceforth be allowed under the automatic route, subject to
sectoral policies, as per the following guidelines:
LPA 1185/2024 Page 39 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
(i) Prior approval of the Government would be required only in cases
where the foreign investor has an existing joint venture or technology
transfer/trademark agreement in the ‘same’ field. The onus to provide
requisite justification as also proof to the satisfaction of the Government
that the new proposal would or would not in any way jeopardise the
interests of the existing joint venture or technology/ trademark partner or
other stakeholders would lie equally on the foreign investor/ technology
supplier and the Indian partner.”
76. If we compare the provisions of the guidelines contained in Press
Note-1 (2005 Series) with the provisions of the guidelines embodied in Press
Note-18 (1998 Series), what we find is that automatic route for foreign
investment was not available earlier to those entities which had any previous
Joint Venture in the same or allied field in India. Earlier, such category of
entities would have to necessarily seek the FIPB-PAB approval route for
investment in Joint Venture under automatic route. Clause 1(I) & (II) of
Press Note-18 (1998 Series) is extracted herein below:-
“1. The Government have reviewed the present Guidelines relating to
approval of foreign/technical collaborations under the automatic route
and after careful consideration it has been decided that foreign
financial/technical collaboration with previous ventures/tie-up in India
would be subjected to the following guidelines:
I. Automatic route for FDI and/or technology collaboration would not be
available to those who have or had any previous joint venture or
technology transfer/trade-mark agreement in the same or allied field in
India. RBI, therefore, have to stipulate necessary declaration before
applications for the automatic route are taken on record.
II. Investors of Technology to the suppliers of the above category therefore
will have to necessarily seek the FIPB/PAB approval route for joint
ventures or the technology transfer agreements (including trade-mark)
giving detailed circumstances in which they find it necessary to set-up a
new joint venture/enter into new technology transfer (including trade-
mark).
III. The onus is clearly on such investor/technology suppliers to provide
the requisite justification as also proof to the satisfaction of FIPB/PAB
LPA 1185/2024 Page 40 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
that the new proposal would not in any way jeopardise the interests of the
existing joint venture or technology/trade-mark partner or other
stakeholders. It will be at the sole discretion of FIPB/PAB to either
approve the application with or without conditions or reject in toto duly
recording the reasons for doing so.
2. The above procedure will form part of the approval procedures
contained in the “Manual on Industrial Policy & Procedures In India”
published by SIA, Ministry of Industries, Government of India, which shall
stand clarified accordingly in respect of foreign/technical collaborators
with previous joint ventures/tie-up in India.”
77. Thus, it is apparent that while issuing the guidelines contained in
Press Note-1 (2005 Series), the government permitted the automatic route of
foreign investment even in a situation where the foreign investor has an
existing Joint Venture. Such investment, as per the said provision, however,
is permitted only with the prior approval of the Government. Whereas, the
guidelines prescribed in Press Note-18 (1998 Series) did not permit any
automatic route for foreign investment where the foreign investors had any
previous Joint Venture in the same field, rather such investment was
permissible only under FIPB-PAB approval route.
78. If we closely scrutinise the guidelines contained in Press Note-18
(1998 Series) and those contained in Press Note-1 (2005 Series) and
compare the two, what we find is that the Press Note-1 (2005 Series)
effected a departure from the earlier guidelines contained in Press Note-18
(1998 Series) and the departure is that Press Note-1 (2005 Series) permits
foreign investment by a foreign investors in an existing Joint Venture with
the prior approval of the government under automatic route whereas the
earlier policy contained in Press Note-18 (1998 Series) did not permit any
such foreign investment in an Indian partner under the automatic route even
LPA 1185/2024 Page 41 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
with the approval of the Government. Press Note-18 (1998 Series) only
permitted FIPB-PAB approval route for investment in Joint Venture. Thus,
what can safely be observed is that the departure from 1998 policy by
issuing Press Note-1 (2005 Series) aimed at ease of doing business by
foreign investors in India by permitting foreign investment in a Joint
Venture where an Indian entity is a partner, under the automatic route, albeit
with the approval of the Government.
79. What we also notice from a perusal of Press Note-1 (2005 Series) is
that the inquiry by the Government for according approval to foreign
investment under the automatic route relates to determination of the point as
to whether new proposal would or would not, in any way, jeopardise the
interests of the existing Joint Venture. On satisfaction that the proposed
investment by a foreign entity under the automatic route would not
jeopardise the interests of the existing Joint Venture in the same field, the
government is to grant its approval to such investment being sought to be
made by a foreign entity under the automatic route.
80. Thus, what essentially is to be seen while considering any issue
relating to approval of the Government in such cases is as to whether the
proposed foreign investment is putting the interest of the existing Joint
Venture in jeopardy or not. This is the limited scope of scrutiny or inquiry
by the Government while considering any request for approval under Press
Note-1 (2005 Series).
81. What is apparent from the subject on which Press Note-1 (2005
Series) was issued by the Department of Industrial Policy and Promotion,
LPA 1185/2024 Page 42 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Ministry of Commerce and Industry, Government of India, is that the said
press note contains guidelines, and guidelines issued by the Government
necessarily reflect Government policies and, therefore, in our considered
opinion any decision on the issue of approval of the Government in terms of
Press Note-1 (2005 Series) will be a policy decision.
82. It is a trite law that the scope of interference by the Courts in
proceedings under Article 226 of the Constitution of India to such policy
decisions is very limited, and such decisions are not capable of being
substituted by any opinion in this respect which may be formed by the
Courts. The decision in respect of approval in terms of Press Note-1 (2005
Series) cannot, by any stretch of imagination, be termed to be either judicial
or quasi-judicial and, therefore, the Government while taking such decision
also does not exercise any judicial or quasi-judicial authority or power.
83. In the instant case, the decision dated 29.09.2010 of the Government
according its ex post facto approval to the proposal made by appellant no.1-
PCP to its investment made in appellant no.2-PCM was taken on the
recommendation made by FIPB on 10.09.2010 which made its
recommendations considering the opinion of the Committee expressed in its
decision taken in its meeting held on 04.08.2010. Having regard to the
nature of decision required to be taken by the Government for approval to
direct investment in terms of Press Note-1 (2005 Series) read with Press
Note-3 (2005 Series), which we have held to be in the nature of policy
decision, we are of the considered opinion that interference in such decisions
in writ jurisdiction has to be restricted to violation of any constitutional
LPA 1185/2024 Page 43 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
provision or Fundamental Rights or in case such decision is absolutely
arbitrary or if it suffers from any element of malice.
Contention in this regard that such a decision has to be tested on the
Wednesbury principle is not acceptable for the simple reason that such a
decision is in the nature of a policy decision. In this regard, we may refer to
the decision of this Court in Jay Ushin Limited (supra), wherein the learned
Single Judge after discussing the provisions of Press Note-1 (2005 Series)
has observed that the guidelines contained therein cannot be read as General
Protectionist Policy of the Central Government and further that the Court is
not expected to dictate to the Government of India the policy in granting
FIPB approval and that this is entirely outside the scope of powers of this
Court under Article 226 of the Constitution of India. We quote, with the
approval, paragraph 14 of the said judgment by Single Judge Jay Ushin
Limited (supra), which reads as under:-
“14. Any other interpretation of the requirement of Press Note No.1 (2005
Series) would imply that this Court is reading into that policy document
something which does not flow from a plain reading of it. Incidentally,
Press Note No.3 (2005 Series) only reiterates the Press No.1 (2005
Series). JUL is in effect asking this Court to read Press Note 1 as a
general protectionist policy of the central government. This it is plainly
not. This Court is not expected to dictate to the Government of India the
policy in granting FIPB approvals. That is entirely outside the scope of the
powers of this Court under Article 226 of the Constitution.”
84. The learned Single Judge in the impugned judgment and order dated
29.10.2024 has given an unambiguous finding that, “it cannot be said that ex
post facto approval dated 29.09.2010 was granted without any reason,
although those reasons may not be specifically mentioned in the approval
LPA 1185/2024 Page 44 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
dated 29.09.2010″. The learned Single Judge has also observed that ex post
facto approval was the result of deliberations made in FIPB on the basis of
the opinion expressed by the Committee constituted by the said Board to
examine rival contentions of the parties. We thus conclude that granting
approval to the proposal of the appellant no.1-PCP seeking ex post facto
approval to its investment made in appellant no.2-PCM by the respondent
no.2 vide its order dated 29.09.2010 is a policy decision and unless and until
the Court comes to the conclusion that such approval has been accorded by
the Government without a finding that the investment made would, in any
way, jeopardise the interest of the respondent no.5 – the existing Joint
Venture, it will be difficult for the Court to interfere with such decision.
The decision of the Government dated 29.09.2010 is based on the
recommendations dated 10.09.2010 made by the FIPB, wherein on
deliberation and consideration of the opinion of the Committee, dated
04.08.2010, it has been found and accordingly opined that, “it is difficult to
determine if jeopardy would have been caused”. Thus, in our view, the
nature of inquiry required to be made before granting approval in terms of
the requirement of Press Note-1 (2005 Series) in the instant case was made,
and it has been found therein that the foreign investment in respect of which
approval was sought would not jeopardise the interest of the existing Joint
Venture i.e. respondent no.5.
85. The issue no.(i) is decided thus, for per the above-mentioned reasons.
86. Coming to the issue no.(ii), we now need to examine whether there
has been violation of the principle of natural justice in the facts of the instant
LPA 1185/2024 Page 45 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
case. As has been held by the Hon‟ble Supreme Court in Keshav Mills Co.
Ltd. v. Union of India, (1973) 1 SCC 380, principles of natural justice
cannot be put in any straitjacket formula. The extent of opportunity of
putting forth its case by a party to an issue, depends on the nature of the
inquiry or proceedings under which such issue is determined or decided.
Primarily, the principles of natural justice has two ingredients, firstly, no one
should be condemned unheard and secondly, no one can be the judge of his
own cause. So far as the first ingredient is concerned, if any decision, even
by an administrative authority, is likely to cause some serious civil
consequences to a party, such a party is entitled to be given an opportunity
of presenting its case. Opportunity of presentation of a case by a party in
any proceedings may assume various forms, such as (i) opportunity of
making a written representation, (ii) opportunity of being personally heard,
(iii) opportunity of being represented by a legal expert or a counsel and (iv)
opportunity of post-decisional hearing, etc.
87. As to what would constitute fulfilment of the requirement of
observance of principles of natural justice in a particular situation or case
depends on the nature of the proceedings to which a party is subjected to. It
is needless to observe that the opportunity of making representation and
putting forth its case to a party, even by providing an opportunity of
personal hearing, is a necessary requirement in any judicial or quasi-judicial
proceedings. However, as far as administrative proceedings are concerned,
depending on the nature of proceedings, the requirement of observance of
principles of natural justice would be met in some cases by merely providing
an opportunity to put forth a case by a party by making a written
LPA 1185/2024 Page 46 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
representation and in some other cases such requirement would get fulfilled
also by providing opportunity of personal hearing.
88. So far as the instant case is concerned, as already observed above, any
decision regarding approval in respect of foreign investment made by a
foreign entity under the automatic route in terms of guidelines embodied in
Press Note-1 (2005 Series) is in the nature of a policy decision, therefore, in
our opinion, greater latitude ought to be given to the Government. We have
already observed that what all is required to be scrutinised and seen by the
Government while considering any proposal for approval for foreign
investment under the automatic route in terms of Press Note-1 (2005 Series),
is as to whether the proposed foreign investment is causing any jeopardy to
the interest of the existing Joint Venture. It is primarily for the satisfaction
of the Government that the new proposal would or would not jeopardise the
interests of the existing Joint Venture. Having regard to such nature of
inquiry or proceedings that may be required to be conducted for considering
any proposal for approval of foreign investment under automatic route as per
Press Note-1 (2005 Series), in our opinion, written representation expressing
its views and stating its case by the existing Joint Venture would suffice to
meet the requirement of principles of natural justice, though in the instant
case the Committee constituted by FIPB not only entertained various
representations made by the existing Joint Venture – respondent no.5 but
also solicited various information from it from time to time and further, even
provided opportunity of personal hearing as well.
LPA 1185/2024 Page 47 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
89. We may also note that under Press Note-1 (2005 Series), neither the
Committee constituted by the FIPB nor the FIPB itself is required to
consider such a proposal seeking approval for foreign investment under the
automatic route; rather, such approval is to be accorded by the Government.
The Government in this case has taken the decision dated 29.09.2010 as
amended on 10.11.2010 on the recommendations of FIPB, which took its
decision taking into account the opinion of the Committee besides
considering other relevant factors. The FIPB and the Committee, in our
opinion, acted only in aid of the Government to take the decision on the
proposal submitted by the appellant no. 1-PCP seeking ex post facto
approval to its investment made in appellant no.2-PCM.
90. It is not in dispute that the representations made and information
submitted by the existing Joint Venture – respondent no.5 were considered
by the Committee as also by the FIPB in their respective decisions. The
Committee had even provided opportunity of hearing to the respondent no.5
before taking a final decision expressing its opinion submitted to FIPB and,
therefore, we have no hesitation to conclude that having regard to the nature
of inquiry or proceedings to be drawn for considering any proposal for
according approval under Press Note-1 (2005 Series) the requirement of
observance of principles of natural justice in the facts and circumstances of
the instant case, were duly met.
91. It has vehemently been argued on behalf of the respondent nos.5 to 7
that the Committee which had heard them did not take the decision on
04.08.2010, rather decision was taken by reconstituted committee, and,
LPA 1185/2024 Page 48 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
therefore, on the principle of “he who hears must decide”, any decision of
the Government of India based on the recommendations of the FIPB, which
in turn is based on the opinion of the Committee, cannot be sustained in the
eyes of law.
92. Admittedly the constitution of the Committee which provided
opportunity of personal hearing to the existing Joint Venture in its meeting
held on 17.03.2010 was altered and the Chairperson of the earlier
Committee i.e. Ms.L.M.Vas, Additional Secretary, Department of Economic
Affairs was replaced by Mr.Bimal Julka, Director General, Directorate of
Currency (DEA), who chaired the meeting held on 04.08.2010, that made
the recommendations for giving approval of the appellant no.1-PCP. Name
of Mr.Pramod Saxena, Director, Department of Economic Affairs, who was
part of the meeting of the Committee held on 17.03.2010 also did not appear
in the records of the meeting dated 04.08.2010. On this count, it has been
argued by Sh.Shyam Mehta, representing the respondent nos.5 to 7 that the
Committee, which had heard the existing Joint Venture, did not take the
decision and, therefore, such a decision cannot be said to be lawful. Reliance
in this regard has been placed on behalf of the respondent nos.5 to 7 on
Gullapalli Nageswara Rao (supra).
93. In the said case, which was a writ petition filed under Article 32 of the
Constitution of India, what was challenged was the provisions of Chapter
IV-A of the Motor Vehicles Act as amended by Act 100 of 1956, and
further, the scheme framed under the said Act was also challenged. One of
the grounds taken for the challenge in the said matter was that while the Act
LPA 1185/2024 Page 49 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
and the Rules imposed a duty on the State Government to give a personal
hearing, the procedure prescribed by the Rules imposed the duty on the
Secretary to hear and the Chief Minister to decide. It is in the context of the
said statutory scheme that the Hon‟ble Supreme Court observed in the said
case that such divided responsibility is destructive of the concept of judicial
hearing and further that such a procedure defeats the objects of personal
hearing. The Hon‟ble Supreme Court further observed that personal hearing
enables the authority concerned to watch the demeanour of the witnesses
and clear his doubts during the course of arguments and it also enables the
party appearing to persuade the authority by reasoned arguments to accept
his point of view.
94. Such observations by Supreme Court in Gullapalli Nageswara Rao
(supra) regarding divided responsibility of conducting the proceedings
under the statutory scheme discussed in the said judgment, in our opinion,
does not have any application to the facts of the present case for the simple
reason that the nature of proceedings in the said matter were statutorily
provided and were judicial or at least quasi-judicial, whereas nature of the
proceedings to be drawn for the purposes of according approval to any
proposal for foreign investment through automatic route is neither judicial
nor quasi-judicial, it is rather administrative in nature which leads to a
policy decision. Thus, the difference in the nature of proceedings in
Gullapalli Nageswara Rao (supra) and in the proceedings drawn for
according approval to foreign investment under automatic route persuades
us to observe this Gullapalli Nageswara Rao (supra) does not have any
application to the facts of the present case.
LPA 1185/2024 Page 50 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
95. Reliance placed by learned senior counsel for the respondent nos.5 to
7 on a coordinate Bench judgment of this Court in Hyundai Rotem (supra)
also does not come to his rescue. The said judgment refers to the judgment
of Hon‟ble Supreme Court in Gullapalli Nageswara Rao (supra) and
proceeds to observe that one authority hearing and another authority passing
the order defeats the very purpose of personal hearing as the party concerned
in the said case lost an opportunity to try and persuade the competent
authority to accept its contentions. The Court further observed that the
procedure followed in the said matter was wholly contrary to the principles
of natural justice. However, we may note that in Hyundai Rotem (supra)
what was under challenge was a letter blacklisting the appellant-company.
The facts in the said case were that the party concerned was blacklisted on
10.08.2015 and prior to that on 16.06.2015, a show-cause notice was issued
seeking explanation as to why action may not be taken for certain defaults.
In pursuance of an order passed in an earlier writ petition hearing was given
to the parties concerned by a Committee comprising of two Directors and
one General Manager of the respondent in the said case, whereas the order
of blacklisting dated 10.08.2015 was passed by the Executive Director and it
is in the background of these facts that it was pleaded that functionaries that
had given a hearing to the parties concerned had not passed the order of
blacklisting, rather the order was passed by another authority and, therefore,
such order of blacklisting was contrary to the law laid down by the Hon‟ble
Supreme Court in Gullapalli Nageswara Rao (supra).
96. The issue in Hyundai Rotem (supra) was, thus, in relation to
blacklisting of a firm which has very serious civil consequences. Hon‟ble
LPA 1185/2024 Page 51 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Supreme Court in Gorkha Security Services v. Govt. (NCT of Delhi),
(2014) 9 SCC 105, has observed that blacklisting of a firm or contractor
virtually amounts to civil death and, therefore, principles of natural justice
are applicable with full force. Blacklisting amounts to a complete bar on
providing services, thus resulting in civil death, whereas in the instant case,
opinion expressed by the Committee, dated 04.08.2010 records that the
Indian unit has geared up and has increased capacity and sales and did not
collapse, which does not have the same effect of resulting in civil death. In
addition, in the instant case, the nature of proceedings that were drawn for
considering any proposal of approval of foreign investment under automatic
route in terms of Press Note-1 (2005 Series), in our opinion, cannot be
equated with the proceedings which ought to be drawn in case of proposed
action of blacklisting of a firm or a contractor. Therefore, the reliance
placed by learned senior counsel representing the respondent nos.5 to 7 of
Hyundai Rotem (supra) is also misplaced.
97. Sh.Shyam Mehta has also referred to the judgments in State Bank of
India (supra), IDBI Bank (supra), Excise Commissioner (supra),
A.K.Kraipak (supra) to stress the argument that if any administrative action
results in civil consequences parties are entitled to be provided with the
evidence collected against it or in its favour and the opportunity to deal with
the same should also be given.
98. So far as the proposition laid down in the aforesaid judgments is
concerned, there cannot be any quarrel, however what we find in the instant
case is that so far as the transactions between the appellant no.1-PCP and the
LPA 1185/2024 Page 52 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
respondent no.5-PIP are concerned, all the necessary documents were in the
notice and knowledge of both these parties. Sh.Shyam Mehta has raised an
issue that the opinion of the Department of Legal Affairs stated that it was
permissible to grant ex post facto approval, and copy of this opinion was not
provided to the respondent no.5-PIP during the course of the proceedings.
He has also taken exception to not being provided the opinion of the
Department of Heavy Industries to the respondent no.5, according to which
the interest of respondent no.5-PIP were jeopardised by the appellant no.1-
PCP setting up appellant no.2-PCM.
99. In this regard, we may state that in the course of making any
administrative decision of the nature as is required, on a proposal seeking
approval of foreign investment under the automatic route in terms of Press
Note-1 (2005 Series), opinions are generally sought inter-departmentally by
the Government and, therefore, opinion given by the Department of Legal
Affairs which stated that it was permissible to grant ex post facto approval
need not be necessarily provided for the reason that it is for the consumption
of the decision making authority. As far as the opinion of the Department of
Heavy Industry is concerned, the said opinion was also sought by the
Finance Department (respondent no.2) of the Government of India only in
aid of arriving at a correct decision and such opinion, in our view would not
form such document or material with which the respondent no.5-PIP ought
to have been necessarily confronted with.
100. The submission as made by learned senior counsel for the respondent
nos.5 to 7 that once the appellants made application for compounding of the
LPA 1185/2024 Page 53 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
contravention of the guidelines contained in Press Note-1 (2005 Series), it
would amount to acceptance of the contravention, in our opinion, is not
available in the facts of the present case for the reason that the application
seeking approval made by the appellants had clearly stated that application
was made without prejudice to their bona fide contention that the provisions
of Press Note-1 (2005 Series) were not attracted to the investment already
made in the appellant no.2-PCM by accessing the automatic route. It is also
to be seen that the application for compounding was made by the appellants
only in terms of the conditions as contained in the order of approval dated
29.09.2010 and not otherwise. In this view of the matter, such a submission
that presenting an application for compounding, in the instant case, would
amount to acceptance of contravention, is not tenable.
101. The judgments cited by Sh.Shyam Mehta in support of his argument
that when the statute provide for prior approval, ex post facto approval is
impermissible, in our opinion will have no application in the instant case for
the reason that all these judgments namely LIC v. Escorts (supra), Asha
Rani Gupta v. Ravindra Memorial (supra), A.Chowgule & Company v.
Goa Foundation (supra), Union of India v. Vinod Kumar (supra) and
Behari Kunj v. State of U.P. (supra) related to some requirement either
under an Act of the Legislature or statutory rules framed under some
statutory enactments whereas the approval of the Central Government in the
instant case under Press Note-1 (2005 Series) for foreign investment through
automatic route is required under guidelines which do not appear to have
emanated from any parliamentary enactment or statutory rules.
LPA 1185/2024 Page 54 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
102. Asha Rani Gupta v. Ravindra Memorial (supra) (supra) was a case
where Section 8(2) of the Delhi School Education Act and Rule 120(2) of
the Delhi School Education Rules specifically required prior approval of the
Director of Education that was statutorily mandated, before passing any
order of dismissal or removal from service of an employee of a school. It is
in the context of the statutory mandate contained in Section 8(2) of the Delhi
School Education Act and Rule 120(2) of the Rules framed under the said
legislative enactment that the Court observed that in such a case, ex post
facto approval cannot replace prior approval of any action.
103. Union of India v. Vinod Kumar (supra) was also a case where
proviso appended to Section 5D(7)(a) of Employees‟ Provident Fund and
Miscellaneous Provisions Act, 1952 required prior approval of the Central
Government, in case, Central Board was of the opinion that it was necessary
to make a departure from certain rules or orders in respect of any of the
maters. Thus, in the said case as well, it was mandated by the Act of
Parliament to seek prior approval, and in this context, it was laid down that
ex post facto approval is not an approval which can be equated with prior
approval and, therefore, such approval is not tenable in law.
104. Behari Kunj v. State of U.P. (supra), where sub-section (2) of
Section 10 of the Administration of Evacuee Property Act, 1950 mandated
that for the purposes of preserving and maintaining the evacuee property,
there can be a transfer or sale; however, no such action can be taken without
prior or previous approval of the Custodian General. It is in the context of
the said statutory mandate of the Act that the Hon‟ble Supreme Court
LPA 1185/2024 Page 55 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
observed that the expression “previous approval” would mean that approval
of the Custodian General is to be taken first before any transfer or sale can
be effected.
105. So far as the judgment in LIC v. Escorts (supra) is concerned, the
question which was examined there was as to whether Reserve Bank of
India had the power or authority to give ex-post facto permission under
Section 29 (1) (b) of the Foreign Exchange Regulation Act, 1973 for the
purchase of shares in India by a company not incorporated in India or
whether such permission had necessarily to be previous permission. The
Hon‟ble Supreme Court discussed the scheme of the said Act and gave a
finding that the word “permission” occurring in Section 29(1) of the said
Act was not qualified by the work “previous”. The Court also went on to
consider the object of Foreign Exchange Regulation Act, 1973 which
according to the judgment was to earn, conserve, regulate and store foreign
exchange and, therefore, it was held that what was necessary in the facts of
the said case was that permission of Reserve Bank of India should be
obtained at some stage for the purchase of share of non-resident companies.
Paragraphs 61 to 63 of the judgment in LIC v. Escorts (supra) is extracted
herein below:-
“61. From what has been narrated above, one of the principal questions
to be considered is seen to be whether the Reserve Bank of India had the
power or authority to give ex post facto permission under Section 29(1)(b)
of the Foreign Exchange Regulation Act for the purchase of shares in
India by a company not incorporated in India or whether such permission
had necessarily to be “previous” permission.
62. We do not propose to refer to any dictionary to find out the meaning of
the word “permission”, whether the word is comprehensive enough toLPA 1185/2024 Page 56 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
include subsequent permission. We will only refer to what Sir Shah
Sulaiman, C.J. said in Shakir Hussain v. Chandoo Lal [AIR 1931 All 567]
:
“Ordinarily the difference between approval and permission is
that in the first the act holds good until disapproved, while in the other
case, it does not become effective until permission is obtained. But
permission subsequently obtained may all the same validate the previous
act.”
63. We have already extracted Section 29(1) and we notice that the
expression used is “general or special permission of the Reserve Bank of
India” and that the expression is not qualified by the word “previous” or
“prior”. While we are conscious that the word “prior” or “previous”
may be implied if the contextual situation or the object and design of the
legislation demands it, we find no such compelling circumstances
justifying reading any such implication into Section 29(1). On the other
hand, the indications are all to the contrary. We find, on a perusal of the
several, different sections of the very Act, that the Parliament has not been
unmindful of the need to clearly express its intention by using the
expression “previous permission” whenever it was thought that “previous
permission” was necessary. In Sections 27(1) and 30, we find that the
expression “permission” is qualified by the word “previous” and in
Sections 8(1), 8(2) and 31, the expression “general or special permission”
is qualified by the word “previous”, whereas in Sections 13(2), 19(1),
19(4), 20, 21(3), 24, 25, 28(1) and 29, the expressions “permission” and
“general or special permission” remain unqualified. The distinction made
by Parliament between permission simpliciter and previous permission in
the several provisions of the same Act cannot be ignored or strained to be
explained away by us. That is not the way to interpret statutes. The proper
way is to give due weight to the use as well as the omission to use the
qualifying words in different provisions of the Act. The significance of the
use of the qualifying word in one provision and its non-use in another
provision may not be disregarded. In our view, the Parliament
deliberately avoided the qualifying word previous in Section 29(1) so as to
invest the Reserve Bank of India with a certain degree of elasticity in the
matter of granting permission to non-resident companies to purchase
shares in Indian companies. The object of the Foreign Exchange
Regulation Act, as already explained by us, undoubtedly, is to earn,
conserve, regulate and store foreign exchange. The entire scheme andLPA 1185/2024 Page 57 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
design of the Act is directed towards that end. Originally the Foreign
Exchange Regulation Act, 1947 was enacted as a temporary measure, but
it was placed permanently on the Statute Book by the Amendment Act of
1957. The Statement of Objects and Reasons of the 1957 Amendment Act
expressly stated, “India still continues to be short of foreign exchange and
it is necessary to ensure that our foreign exchange resources are
conserved in the national interest”. In 1973, the old Act was repealed and
replaced by the Foreign Exchange Regulation Act, 1973, the long title of
which reads:”An Act to consolidate and amend the law regulating certain
payments, dealings in foreign exchange and securities, transactions
indirectly affecting foreign exchange and the import and export of
currency and bullion, for the conservation of foreign exchange resources
of the country and the proper utilisation thereof in the interest of the
economic development of the country.” We have already referred to
Section 76 which emphasises that every permission or licence granted by
the Central Government or the Reserve Bank of India should be animated
by a desire to conserve the foreign exchange resources of the country. The
Foreign Exchange Regulation Act is, therefore, clearly a statute enacted
in the national economic interest. When construing statutes enacted in the
national interest, we have necessarily to take the broad factual situations
contemplated by the Act and interpret its provisions so as to advance and
not to thwart the particular national interest whose advancement is
proposed by the legislation. Traditional norms of statutory interpretation
must yield to broader notions of the national interest. If the legislation is
viewed and construed from that perspective, as indeed it is imperative that
we do, we find no difficulty in interpreting “permission” to mean
“permission”, previous or subsequent, and we find no justification
whatsoever for limiting the expression “permission” to “previous
previous‟” only. In our view, what is necessary is that the permission of
the Reserve Bank of India should be obtained at some stage for the
purchase of shares by non-resident companies.”
106. As regards the judgment in A.Chowgule & Company v. Goa
Foundation (supra) cited by learned senior counsel representing the
respondent nos.5 to 7, we may note that the said case also dealt with Section
2 of Forest (Conservation) Act, 1980, which required that no State
LPA 1185/2024 Page 58 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Government or any other Authority shall make any order as specified in
Section 2 except with the prior approval of the Central Government. The
Supreme Court discussed the provisions of Section 2 of the said Act and
Rule 4, 5 and 6 of the Rules framed thereunder, which required that every
State Government seeking approval under Section 2 of the Act, shall submit
a proposal to the Central Government in the prescribed form and Rule 6
stipulated that the proposal should be examined by the Committee appointed
under Rule 2A. It was in the context of the statutory scheme of the Forest
(Conservation) Act, 1980, and the rules framed thereunder which mandated
the State Government to seek prior approval of the Central Government for
passing orders mentioned in Section 2, that the Supreme Court held that in
the absence of prior approval any order made under Section 2 of the said Act
would not be lawful.
107. Thus, all the judgments cited are based on statutory mandates either
prescribed by a legislative enactment or by statutory rules framed under such
enactments, whereas in the instant case the proposal for approval made by
appellant no.1-PCP for making for an investment under automatic route was
sought in terms of the requirement of the guidelines embodied in Press
Note-1 (2005 Series) which, as observed above, do not appear to emanate
from any legislative enactment. Therefore, in our opinion, the judgments
cited by learned counsel for respondent nos. 5 to 7 in this regard do not
improve his case.
108. The decision regarding approval for making foreign investment
through automatic route in case of an existing joint venture as required
LPA 1185/2024 Page 59 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
under Press Note-1 (2005 Series) is to be taken by the Government. As a
matter of fact, such decisions, as noted by authors M.P. Jain and S.N. Jain in
their seminal work on Principles of Administrative Law, Chapter X
Principles of Natural Justice or Fairness, Volume 1, Eighth Edition, Pages
81-82, are termed as Administrative Decisions. The authors have observed
that Government is an impersonal entity and can function through officers
and further that it may be that a decision of complex issues needs expertise,
specialisation, opinions and perspective of a number of staff members. The
authors have also observed that the decision maker is not identified or
individualized, as the decision stands in the name of concerned organisation
or institution. It has also been observed by the authors that in the area of
administrative adjudication, some decisions are made personally by
identifying administrators or a small group of officials who take
responsibility for the same but this is not always the case and, at times,
decision may be the end-product of institutions and institutional processes
rather than that of one designated person. The relevant observations of the
authors in the book are extracted hereunder:
“12. INSTITUTIONAL DECISIONS
An institutional decision negates the doctrine “One who decides must
hear.” Decisions are „institutional‟ because the decision as a whole is that
of the concerned department as an administrative entity rather than the
personal decision of any designated officer individually. In an institutional
decision, no one individual officer hears the party personally and decides
the case himself as a judge does. Usually, one official hears the party
concerned; he may take the decision in the name of the government if he is
authorised to do so. If not so authorised, he submits the record of hearing
to the higher officer for his taking the decision, again, in the name of the
government. A situation of institutional decision comes into existence
when the decision making power is conferred on an institution, such as,
government, or a department, or a Minister, and not on a designated
official specifically. For example, when decision-making power isLPA 1185/2024 Page 60 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
conferred by law on a Minister, it does not mean that the Minister himself
personally applies his mind to the matter and arrives at a decision. What it
means is that the decision is arrived at either by the Minister himself, or
by some one else in his department for whom the Minister is
constitutionally responsible.
Several reasons give rise to the system of institutional decisions.
Government is an impersonal entity and can function only through
officers. A Minister is a busy person and cannot take each and every
decision himself. It may be that a decision of complex issues needs the
expertise, specialization, opinions and perspective of a number of staff
members. From the point of view of the affected person, such a decision
suffers from two main drawbacks: (1) the authorship of such a decision
within the concerned department may not be known to the affected person
as it is reached by the cumulative application of minds by several officials
in the concerned department. The decision-maker is not identified or
individualized as the decision stands in the name of the concerned
organization or the institution. The decision thus suffers from anonymity.
(2) There occurs a division in the decision-making process: while one
official may hear another may decide. In the area of administrative
adjudication, some decisions are made personally by identified
administrators, or a small group of officials who take responsibility for
the same. But this is not always the case and, at times, a decision may be
the end-product of institutions and institutional processes rather than that
of one designated person.
The procedure of institutional decision-making is essentially different from
the judicial decision-making in which the judge personally hears, applies
his own discretion and decides the matter; he is appointed to adjudicate
upon disputes between parties and his decision is personal; he himself
presides at the trial; he hears the evidence, watches the demeanour of
witnesses, draws his own conclusions as to the credit-worthiness of the
witnesses, himself hears the arguments of the concerned parties, then
decides and writes his reasons for the decision. All materials which form
the basis of the decision are presented in open Court so that every one
knows them. There is one more point of difference between judicial and
institutional decisions, viz., the routine departmental procedure, notings
on the file etc., by various officials go on as usual before the final decision
is arrived at, and this, to some extent, even compromises the rule,
discussed earlier,66 that no material should be used against a person
without giving him an opportunity to rebut the same. Much of the notings
and views expressed on the file concerned by various officials, as the file
moves from one official to another within the department before it reaches
the stage where final decision is formally taken, may never come to the
notice of the affected person, and he would never get a chance to rebut the
LPA 1185/2024 Page 61 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
same. A decision by a department differs from the decision by a
designated official, body or tribunal created exclusively for adjudication,
for while in the latter case the discretion exercised and the views taken are
of the specified authority itself, in the former case, the decision is that of
the department as a whole and represents the cumulative wisdom of a
number of anonymous officials through whose hands the file of the case
may pass, and in this sense it is institutional and not a personal or an
individual decision of one person.”
109. A Division Bench of Madhya Pradesh High Court in Indore Textiles
Limited and Another v. Union of India and Another, 1983 MPLJ 41 (1982
SCC OnLine MP 137) has referred to the third edition of the afore-
mentioned book by Jain & Jain and has observed that there is no breach of
natural justice if investigation or hearing part is done by an official or a
committee and the final decision is taken by the Minister after going through
the report of the officer concerned and the evidence and material collected
by him. The said judgment is authored by Chief Justice G.P. Singh, (as his
lordship then was). The judgment refers to Wade, Administrative Law, 4th
Edition and De Smith, Judicial Review of Administrative Action, 4th Edition
and concludes that in the case of administrative decisions, when hearing is
held by one officer and the decision is taken by another on the basis of
hearing and officer‟s report, it is not always necessary to disclose the report
to the affected person for inviting the comments before making the final
decision.
110. In Indore Textiles Limited, (supra), the Minister had taken the
decision though he did not hear the party concerned rather, hearing was
given by a Joint Secretary in the Department whose report and opinion on
the question involved was considered by the Minister after obtaining the
LPA 1185/2024 Page 62 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
opinion of other officers of the department. The decision reached, however,
was of the Minister himself who must be presumed to have considered the
submissions of the party concerned contained in the report of the Joint
Secretary and his views and the views of other officials.
111. In these facts of the case, it was observed in Indore Textiles Limited,
(supra) that it could not be held that there was no hearing by the Minister
and his order was invalid for the reason that oral hearing was given by an
official of the Ministry and not by the Minister himself. Paragraphs 7 to 12
of the judgment in Indore Textiles Limited, (supra) are relevant to be
extracted here which read as under:
“7. When a quasi-judicial power is conferred on the Government or a
Minister, by a statute, it is presumed that Parliament intends the power to
be exercised in accordance with the principles of natural justice according
to the usual practice of the department concerned. The normal practice of
Government departments is that the Minister in charge of the Department
takes assistance from subordinate officials of his department. There is no
breach of natural justice if the investigation or the hearing part is done by
an official or a committee and the final decision is taken by the Minister
after going through the report of the officer concerned and the evidence
and material collected by him. Even in acting upon such a report the
Minister may take assistance from others in his department and the
decision reached by him cannot be treated being in violation of the
principles of natural justice if he has honestly applied his mind to the
relevant material and the decision reached by him is really his decision
[Wade, Administrative Law, 4th edition, p. 467; De Smith, Judicial Review
of Administrative Action, 4th edition, p. 2201]. In Local Government
Board v. Arlidge [1975 AC 120 (HL).] , which is leading authority on the
point, it was held by the House of Lords that an order passed by the
Minister, who was head of the Local Government Board, in an appeal,
which required a quasi judicial procedure, could not be set aside on the
ground that the enquiry in relation to the appeal was not made by and the
hearing was not given by the Minister but by an official of the Board. In
holding so, Viscount Haldane, L.C. made the following observations:
“The Minister at the head of the Board is directly responsible to
Parliament like other Ministers. He is responsible not only for what heLPA 1185/2024 Page 63 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
himself does but for all that is done in his department. The volume of work
entrusted to him is very great and he cannot do the great bulk of it himself.
He is expected to obtain his materials vicariously through his officials,
and he has discharged his duty if he sees that they obtain these materials
for him properly. To try to extend his duty beyond this and to insist that he
and other members of the Board should do everything personally would be
to impair his efficiency. Unlike a Judge in a Court he is not only at liberty
but is compelled to rely on the assistance of his staff.”
8. The principle laid down in Arlidge’s case was accepted by the Privy
Council in the case of Jeffs v. New Zealand Dairy Production and
Marketing Board [1967 AC 551 (PC).] . In this case, the respondent
Board was conferred with a quasi-judicial power by a statute to make a
zoning order. It was held that the Board could appoint a person or
persons to hear and receive evidence and submissions from interested
parties, and if it reached the decision after fully informing itself of the
evidence and submissions made, it could not be said that the Board had
not heard the interested parties and had acted contrary to the principles of
natural justice. It was also held that in some circumstances it may even
suffice for the Board to have before it and to consider an accurate
summary of the relevant evidence and the submissions if the summary
adequately disclosed the submissions and evidence to the Board. The
decision of the Board was, however, set aside on the ground that the
report which the Board considered did not state what the evidence was
and the Board reached its decision without consideration of and in
ignorance of the evidence.
9. The principle that when a quasi-judicial power is conferred on a
Government department or a minister, the pre-decision hearing need not
be by the person passing the final order has also been accepted in the
American Administrative Law. It was no doubt observed by Chief Justice
Hughes in the First Morgan case [298 US 468.] , that “the one who
decides must hear”. But these observations have not to be understood in a
literal sense. The word “hear” is used here in the artistic sense of
requiring certain procedural minimum to insure an informed judgment by
the one who has the responsibility of making the final decision and it does
not necessitate that the person making the final decision must himself be
the presiding officer at the hearing. In other words, the one who decides
must give heed to the case and, directing his mind to it, must be the one
who actually exercises the deciding function. It is not necessary that the
person deciding should himself take the evidence and hear the oral
arguments : see Schwartz. Administrative Law [ (1976) pp. 378 to 383.] .
As observed by Professor Wade:
LPA 1185/2024 Page 64 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
“The work of holding the inquiry and reporting on the evidence
must be delegated to officials, and so in many cases must be the
substantive decision itself. But what the Supreme Court of the United
States continued to require was that the decision should be the personal
decision of the minister in the sense that he sees the record and exercises
his personal judgment upon it. The case may be predigested for him in his
department, but he is the one who is required to decide. He must therefore
„hear‟ in the sense of applying his mind to both sides of the case.” [Wade,
Administrative Law, 4th edition, p. 825].
10. The development of the Indian Administrative Law is also on the same
lines [Jain and Jain, Principles of Administrative Law, 3rd edition, p.
250]. The Supreme Court in Pradyat Kumar v. C.J. of Calcutta [AIR 1956
SC 285.] , expressly approved and followed the decision of the House of
Lords in Arlidge’s case. In Pradyat Kumar‘s case, the question was
whether the Chief Justice who had the power to dismiss could not
authorise a Judge to make enquiry into the charges and to report and
whether it was obligatory on him to himself make the enquiry. In holding
that it was not necessary for the Chief Justice himself to make the enquiry,
it was observed that although in case of a judicial tribunal, the tribunal
cannot delegate its functions unless it is enabled to do so expressly or by
necessary implication, the position is different in case of an administrative
power which has to be exercised in a quasi-judicial manner and the
statutory functionary exercising such a power cannot be said to have
delegated his functions merely by deputing a responsible and competent
officer to enquire and report. It was further observed that what cannot be
delegated is the ultimate responsibility for the exercise of the
power. Arlidge’s case had also decided that when hearing is held by one
officer and the final decision is taken by another on the basis of the
hearing officer’s report, it is not always necessary to disclose the report to
the affected person for inviting his comments before making the final
decision. This principle has also been accepted by our Supreme Court
: Suresh Koshy v. University of Kerala [AIR 1969 SC 198.] , Kesava Mills
Co. v. Union of India [(1973) 1 SCC 380 : AIR 1973 SC 389.] , Shadi
Lal v. State of Punjab [(1973) 1 SCC 680 : AIR 1973 SC 1124.] and Hira
Nath v. Rajendra Medical College [(1973) 1 SCC 805 : AIR 1973 SC
1260.] .
11. In the light of the principles stated above, the argument of the learned
counsel for the petitioners cannot be accepted that as the Minister himself
did not hear the petitioner company, the decision taken by him was invalid
not being in conformity with the decision in the earlier writ petition and
the principles of natural justice. As earlier seen, the hearing was given by
Shri R. Ram Krishna, Joint Secretary. His report which contained the
submissions made by the petitioner company and his opinion on the
LPA 1185/2024 Page 65 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
question of existence of circumstances and legality of take over under
section 18AA was considered by the Minister after obtaining the opinion
of other officials of the department, namely, Shri Damodaran and Shri
Shunglu. The decision reached, however, was of the Minister himself who
must be presumed to have considered the submissions of the petitioner
company contained in the report of Shri Ram Krishna and his views and
the views of other officials. It may here be recalled that although Shri Ram
Krishna had recommended withdrawal of the take over on moral grounds,
he had also expressed the view that technically the requirements of section
18AA were satisfied. Having regard to the facts of the instant case and the
principles of administrative law considered above, it cannot be held that
there was no hearing by the Minister and that his order is invalid for the
reason that the oral hearing was given by an official of the Ministry
namely Shri R. Ram Krishna and not by the Minister himself.
12. Learned counsel for the petitioners heavily relied upon the case of G.
Nageswara Rao v. A.P.S.R.T. Corpn. [AIR 1959 SC 308, p. 327.] , in
support of his submission that the Minister could not have delegated the
hearing function to an official. It is true that in that case the Supreme
Court by a majority held that the Chief Minister who decided the
objections to a proposed scheme of nationalisation under section 68-D of
Motor Vehicles Act, 1939, in accordance with the rules of business could
not delegate the function of hearing the objectors to the Secretary and
observed that “if one person hears and another decides then personal
hearing becomes an empty formality”. But Nageswara Rao‘s case also
refers with approval to the decision of the House of Lords in Arlidge’s
case (p. 326) which was followed in Pradyat Kumar‘s case, Nageswara
Rao‘s case cannot, therefore, be taken to have decided contrary to what is
laid down in Arlidge’s case. In our opinion, the case of Nageswara
Rao must be confined to the construction of section 68D of the Motor
Vehicles Act and the rules made thereunder which specifically required
“giving an opportunity to the person of being heard in person”. The case
cannot be understood to have decided that whenever a quasi-judicial
power is conferred on the Government, the Minister concerned must
himself hear and he cannot act on the report of an officer to whom the
hearing function is delegated. This view that we have taken is in line with
the decisions of the Kerala and Allahabad High Courts : Raghava
Menon v. I.G. of Police [AIR 1961 Kerala 299.] and Triambak
Pati v. B.H.S. & I. Edu., Allahabad [AIR 1973 All. 1.] .”
112. Reference in this respect may also be made to the judgment of
Hon‟ble Supreme Court in Ossein and Gelatine Manufacturers’ Assn.
LPA 1185/2024 Page 66 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
(supra), wherein Gullapalli Nageswara Rao (supra) has been referred to
and it has been observed that in the facts of the said case it was unnecessary
to enter into a decision on the issue for the reason that the issue there was
one of grant of approval by the Government and not by any particular officer
statutorily designated. Paragraph 6 of the judgment of Ossein and Gelatine
Manufacturers’ Assn. (supra) is extracted herein below:-
“6. There was some discussion before us on a larger question as to
whether the requirements of natural justice can be said to have been
complied with where the objections of parties are heard by one officer but
the order is passed by another. Shri Salve, referring to certain passages in
Local Government Board v. Alridge [1915 AC 120 : 84 LJKB 72] , Ridge
v. Baldwin [1964 AC 40 : (1963) 2 All ER 66 : (1963) 2 WLR 3] , Regina
v. Race Relations Board, Ex parteSelvarajan [(1975) 1 WLR 1686] and in
de Smith’s Judicial Review of Administrative Action (4th Edn., pp. 219-
220) submitted that this was not necessarily so and that the contents of
natural justice will vary with the nature of the enquiry, the object of the
proceeding and whether the decision involved is an “institutional”
decision or one taken by an officer specially empowered to do it. Shri
Divan, on the other hand, pointed out that the majority judgment in
Gullappalli Nageswara Rao v. APSRTC [AIR 1959 SC 308 : 1959 Supp 1
SCR 319] has disapproved of Alridge case [1915 AC 120 : 84 LJKB 72]
and that natural justice demands that the hearing and order should be by
the same officer. This is a very interesting question and Alridge case
[1915 AC 120 : 84 LJKB 72] has been dealt with by Wade [Administrative
Law, 6th Edn., p. 507 et seq] . We are of opinion that it is unnecessary to
enter into a decision (sic discussion) of this issue for the purposes of the
present case. Here the issue is one of grant of approval by the Government
and not any particular officer statutorily designated. It is also perfectly
clear on the records that the officer who passed the order has taken full
note of all the objections put forward by the petitioners. We are fully
satisfied, therefore, that the requirements of natural justice have been
fulfilled in the present case.”
113. In Kalinga Mining Corpn. (supra), the High Court had directed grant
of hearing to the party concerned to be given by the Central Government and
though parties were heard by a Joint Secretary of the Department but the
LPA 1185/2024 Page 67 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
order was passed/communicated by a Deputy Secretary. The Hon‟ble
Supreme Court observed that it was a case of institutional hearing and
judicial review is limited only to correcting errors of law or non compliance
to fundamental procedural requirements, which may lead to manifested
justice. The Apex Court in the said case held that orders may often be
communicated by an officer other than the officer who gave the hearing and
found that the judgment of the High Court, which was under challenge
before the Supreme Court, was not contrary to established principles and
parameters for exercise of power of judicial review and further that in such a
situation order of the Central Government did not suffer from any legal or
procedural infirmity. Paragraphs 64 to 68 of the Kalinga Mining Corpn.
(supra) are apposite to be quoted here which read as under:-
“64. Applying the aforesaid principles, the High Court has examined the
entire record and has concluded that the decision-making process is not
flawed in any manner, as canvassed by the appellant. The High Court
noticed that the record was duly produced by Mr J.K. Mishra, learned
Assistant Solicitor General. It was also noticed that throughout the
proceedings, no reference has been made to any particular officer or post
or any designation. The order dated 11-7-2001 passed by the High Court
merely directed that they shall appear before the Central Government on
18-7-2001. The order dated 14-8-2001 clearly indicates that the matter
was being heard in view of the directions [Kalinga Mining
Corpn. v. Union of India, AIR 2002 Ori 83] given by the High Court in
OJC No. 11537 of 1999 and secondly, notice was issued for hearing on
28-8-2001. The record further indicated that the matter was heard by Mr
S.P. Gupta, Joint Secretary for two days i.e. on 28-8-2001 and 13-9-2001.
Both the parties had been given opportunity to place on record any
documents and written submissions in support of their claim. It was also
apparent that the particulars submitted were made available to all the
parties. On 13-9-2001, Mr S.P. Gupta, Joint Secretary made a note as
under:
“Thus, all the documents available with the Central Government
are also available with both the parties.”
LPA 1185/2024 Page 68 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
65. The High Court also took note of the fact that independently of all the
material supplied by the State Government along with the
recommendation and the material made available by the parties, the
Central Government had also asked the Indian Bureau of Mines to furnish
certain reports in support of both the parties. These reports were, in turn,
made available to the rival parties. The High Court further noticed that
after complying with all the formalities required, the issues were finally
adjudicated.
66. Upon conclusion of the arguments by the parties, Mr S.P. Gupta, Joint
Secretary who had heard the parties prepared the note running into 19
pages (from pp. 30-49) containing 47 paragraphs of original record. The
note has been duly signed by Mr S.P. Gupta, Joint Secretary on 17-9-
2001. The High Court further noticed that in fact this is the report which
had been duly approved by the Secretary on 18-9-2001 and by the Central
Government Minister on 25-9-2001. While making the endorsement of the
approval, the Secretary has written as under:
“I endorse fully the above note of the Joint Secretary. This is a
very old case in which the parties have repeatedly recourse to the courts.
As such (sic) even now near litigation may follow. Therefore the decision
of the Central Government has to be in terms of a speaking order which is
backed by facts and law.”
(emphasis supplied)
67. The High Court further notices that the impugned Order dated 27-9-
2001 is, in fact, a verbatim copy of the report/note prepared by Mr S.P.
Gupta, Joint Secretary. Upon examination of the entire matter, the High
Court has concluded that the Order has been signed by Mr R.P. Khatri
merely to communicate the approval of the Central Government to the
parties.
68. We are of the considered opinion that the conclusions reached by the
High Court cannot be said to be contrary to the established principles and
parameters for exercise of the power of judicial review by the courts.”
114. If we examine the submissions of learned counsel for Respondent
Nos. 5 to 7 in light of the aforesaid principle relating to institutional
decisions, what we find is that in the instant case, the decision maker is the
Government which took the decision according its ex post-facto approval of
investment made by appellant No.1-PCP in appellant No.2-PCM taking into
account the recommendation made by FIPB and the opinion of the
LPA 1185/2024 Page 69 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
Committee and the said Committee had formed its opinion considering the
application made by the appellant no.1-PCP, various
representations/objections made by respondent No.5, the opinion provided
by the Department of Legal Affairs and the Department of Heavy industry,
Ministry of Heavy Industry and Public Enterprise and other relevant matter
and aspects. This Committee had given an opportunity of oral hearing as
well to the respondent No.5. Therefore, in our considered opinion, merely
because the Committee which had communicated its opinion to FIPB did not
comprise of Ms. L.M. Vas, the earlier Chairman of the Committee or Mr.
Prabodh Saxena who was a part of the earlier Committee, it cannot be said
that principles of natural justice, in the instant case, having regard to the
nature of decision, were violated.
115. It is worthwhile to note that the Committee which furnished its
opinion to the FIPB as per its decision arrived at the meeting dated
04.08.2010, had noticed the minutes of all earlier meetings of the Committee
and had also considered the case which was set up by respondent Nos. 5 to
7. In this view as well, it is difficult to agree with the submission made on
behalf of respondent No.5 that the process adopted by the respondent No.2
which culminated in its decision dated 29.09.2010 in any way suffered from
the vice of non-observance of principles of natural justice.
116. For the discussions made and reasons given above, we do not find
ourselves in agreement with the impugned judgment and order dated
29.10.2024 passed by the learned Single Judge in W.P. 8148 of 2010.
LPA 1185/2024 Page 70 of 71
Signature Not Verified
Signed By:SHAILNDRA
KUMAR
Signing Date:31.03.2026
20:35:50
117. Resultantly, the appeal is allowed and the judgment and order dated
29.10.2024 passed by learned Single Judge in W.P. 8148 of 2010 is hereby
set aside.
118. There will be no order as to costs.
(DEVENDRA KUMAR UPADHYAYA)
CHIEF JUSTICE
(TUSHAR RAO GEDELA)
JUDGE
MARCH 30, 2026
MJ/S.Rawat/N.K./”shailndra”
LPA 1185/2024 Page 71 of 71